ie工程师英文简历模板_第1页
ie工程师英文简历模板_第2页
ie工程师英文简历模板_第3页
ie工程师英文简历模板_第4页
ie工程师英文简历模板_第5页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、ie工程师英文简历模板ie工程师英文简历模板name: mr. yjbys gender: malewedlock: single nation: hanresidence: guangdong-qingyuan age: 28location: guangdong-dongguan height: 173cmtarget locations: guangdongtarget positions: industry/factories-industrial engineerindustry/factories-production management clerkindustry/factor

2、ies-technic engineertarget jobs: industrial engineer、 lean engineereducation2005-09 2009-07 guangdong university of technology industral engineering bachelor degreetraining2008-12 2008-12 guopei certificate internal quality auditor training &qualificationcompany name (2011-07 present)company typ

3、e: private enterprise company category: electrical,micro-electronicsjob title: industrial engineer positions: industrial engineerjob description: 1.npi: process planning, fixture and equipment planning, prepare process checklist2.standard time and capacity evaluation, line balance and prepare sop fo

4、r new products3.maintain the usage of the consumptive material, standard time and capacity4.perform line balance and improve process to rise capacity5.design and improve the tools and fixture in the work site6.monitor the efficiency of the production line, analyze these reasons manpower, machine, ma

5、terial , environment, method, push the relative dept to solve issues7.kaizen project planning and push: auto-machine introduce, production way optimize, manpower and material saving, etccareer highlight:1.auto-welding machine introduce: welding process operator saving(16 operators-12 operators=4 ope

6、rators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan rmb for each pcba.2.auto-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, aft

7、er introduce the new equipment it takes only 5 operator to seal the master carton3.rear cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partit

8、ion board4.decorative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan rmb) and cut down unpack operation time( saving 12 seconds)5.cooperate with rd to change pcba process from dispensing process to solder paste p

9、rocess, in order to cut down welding failure rate after wave-soldering. in this case charge of pcba fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)6.according to the small order quantity of the product, study

10、 the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-20 operator*40minutes=340minutes) and improve 8% of the motion effective ratereason for leaving: not very good economic benifit of the company,little chance to promote both in position and welfa

11、recompany name (2009-07 2011-06)company type: joint venture company category: electrical,micro-electronicsjob title: junior engineer positions: industrial engineerjob description: 1.establish and maintain the standard labor time, perform line balance to improve production capacity2.load capacity ass

12、essment: base on the mps and the capacity of production line to forecast the workforce requirement3.prepare the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process4.prepare the workshop layout and line layout desi

13、gn basis on logistics analysis5.research and develop new packaging method, develop new suppliers for packing material, make order for new packing material and follow up the schedule6.deal with customer complaint and settle products packaging issue, improve packaging method to satisfy customercareer highlight:1. function test man-machine operation improvement: cooperate with te to disassembleand rearrange test item, and modify the way of program display in the monitor, in orderto realize one person simultaneously operate two test machine2. line balance improvement: provide the cycle t

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论