


下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、深圳国际能源大厦建筑设计国际竞赛 交流回复3rd Q&A for International Energy Tower Design Competition根据近日与多家设计机构的交流,对有关问题集中回复如下:1、关于成果文件: About submissions: 考虑到匿名参赛是国际上重要竞赛的普遍惯例, 为保证国际竞赛的公正性, 各设 计机构提交的成果文件必须按要求进行标记遮盖密封,所有的成果文件须中英文对 照。Considering sealed-bid is a common convention of international competitioni,n order to en
2、sure the fairness, all submissions must be marked and sealed as required. All submitted documents would be in both Chinese and English.(1) 图册均需严格按招标文件补充资料要求进行处理;除A3文本图册正本有签章和盖章以外,其它A3文本图册副本、A0展板、模型及CD光盘中均不能出 现任何设计机构的名称、标识等可识别物,否则视为废标。不安排设计单位讲 解,汇报演示文件以CD/DVD光盘提交,形式不作限定,设计机构可自行选择。 考虑到评委组成,演示文件建议为英文配音
3、和中文字幕。Design explanation and drawings must in strict accordance with the supplement documents. Except for the original copy of A3 design explanation and drawings should contain signatures and stamps as required, other copies of design explanation and drawings, A0 display boards, models and CD should
4、 not contain any names of design organization and marks. Otherwise the submissions will become invalid. There will not be personal presentations, but free-formed e-files of presentations submitted in DVD or CD. Considering the consist of jury, English audio with Chinese subtitle is highly recommende
5、d.( 2) 成果文件提交地址变更为:深圳市红荔西路规划大厦 209 会议室( 518034)、联系人:李姿璇: 0086-139-2377-7718姚 巧:0086-135-9031-5036Submission address changed to:R209, Planning Bureau Building, Hong Li Xi Road, Fu Tian District. 518034 Contact: Michelle : 0086-139-2377-7718Ms. Yao Qiao :0086-135-9031-5036(3) 模型比例变更为 1: 300The scale o
6、f model changed to: 1:300 特别提示: Tips:( 1) 设计单位提交成果前务必请仔细检查,避免因成果文件未按要求遮盖密 封而出现废标。Please examine your submissions very carefully before you submit, to avoid your submissions INVALID because of not being sealed as required.( 2) 汇报演示文件应着重表达设计师的设计理念,不要过于追求画面的效果, 宜将注意力放在设计本身。Content of presentation files
7、 should focus on the design concept of the designer and design itself, instead of on the visual effect.2、关于塔楼布置形式: About the layout of the towers:规划要点已明确要求建设 2 栋塔楼且南低北高, 对 2栋塔楼之间能否设置连廊未 作限定。In the Plan Focus, it is clearly required that two towers in different height: lower in south and higher in no
8、rth, but there is no restrictions on whether build a corridor between two towers.3、关于建筑高度: About the height of the towers: 用地规划许可证要求虽限高为 250 米,但考虑到深圳市中心区整体规划的要求, 建议北塔约 180200 米、南塔约 80100 米。The height limit on the license of land planning is 250 meters, however, considering the urban plan of the CBD
9、area, we suggest 180-200 meters for the north tower, and 80-100 meters for the south tower.4、关于停车位: About parking lot:停车位 1000个不作强制性规定, 可根据设计需求、造价等适当减少,但建议在 800 以上。可考虑部分车位用停车库形式。考虑部分停车位预留充电设施 1,000 parking spaces will not strictly required. It can be reduced in accordance with the design and costs,
10、but more than 800 are suggested. Some parking spaces can be built in the form of garages. Part of parking spaces for charging instruments should be considered.5、关于工程造价: About engineering cost: 要求设计方案建安成本不能超过招标文件规定的 10 亿元人民币。造价中除包含 招标文件要求的环境、土建、机电设备和外立面及内部公共空间装饰等外,还应包含 以下内容:As required in the bidding
11、 document, the engineering cost should be less than 1 billion RMB, which includes environment, civil engineering, electromechanical devices, the decoration of external walls and internal office space as well as the followings:(1)、所有办公用房(包括展示厅、物业管理用房)按交楼标准装修好,即网络 地板做好、内墙面粉刷好、天花做好吊顶。All the offices (i
12、ncluding exhibition hall, property management room) should be decored in accordance with the standards of consignment: finishing the network floor, internal wall painting and ceiling making.(2)、商业服务区、食堂、职工活动场所按交楼标准装修好,即地面做好、内 墙面粉刷好、天花做好吊顶。Commercial area, canteen and staff activity place should be d
13、one: finishing the floor, internal wall painting and ceiling making.(3)、公共会议中心按能交付使用标准装饰和安装设备。The public conference center should be decored and equipped as required.6、问:地铁 1 号线会展中心的地下通道的位置、通道所在的深度和通道的坡度能否 在提供的地形图上注明?设计预留与地铁站在地下的便捷联系, 能否提供有关资料? Q: Is it possible that you mark the position of Hui Zha
14、n Zhong Xin station of No.1 Metro Line in underground space, the depth of the tunnel and its slope on the map? Could you also provide information on reserved underground passage that easily connects to the Metro Line? 答:请设计单位自行考虑,本次设计范围仅考虑在北侧与地铁站连接通道的预留口。 A: This will not be provided. Please just co
15、nsider the connection with the access of the metro in north in the design.7、问:与北侧卓越皇岗世纪中心二层步行系统的衔接:设计预留与北侧项目二层步 行系统的衔接, 但从搜集的资料发现卓越建筑群预留天桥的平面位置已超出用地东侧 界限,能否明确?Q: The connection with the second-floor pedestrian system of Excellence Huang Gang Century Center in the north: the connection should be desi
16、gned with the second floor pedestrian system, but seen from the collected materials, the preserved space for the foot bridge has exceeded the boundary in the east, please clarify. 答:请设计单位考虑在东北侧与卓越皇岗世纪中心二层步行系统的连接。A: Please consider the connection with the second floor pedestrian system of Excellence
17、Huang Gang Century Center in the northeast.8、问:房间进深有无特殊要求?Q: Are there any special requirements on the depth of rooms? 答:无,可根据每层建筑面积及采光效果综合考虑。A: No. It can be considered in accordance with the building area on each floor and its lighting.9、问:总部办公几层可否采用中庭?Q: Can atrium be set in the headquarter offic
18、e levels? 答:不作限定。A: Not restricted.10、问:空间控制图中基地东侧车行入口的两个箭头的位置是仅为示意还是明确要求 设在图示所在位置?北侧人行出入口的位置是仅为示意还是明确要求设在图示所在 位置?设在此处是否正好对应与福华五路的人行横道线的位置?Q: In the space controlling drawings, are the positions of two arrows in the east car paths just a hint or a requirement? In the north pedestrian path, is the position just a hint or a requirement to set it as marked on the drawings? Should this position be just correspondent to the pedestrian crosswalk of Fu Hua Wu Road? 答:车行入口和人行入口箭头位置仅作为示意。 具体位置由设计单位根据市政道路规 划及相关要求设置。A: The arrows are just hints. Please set the paths
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- JJF 2252-2025机动车检测用涡流式金属探伤仪校准规范
- 铜压延加工环境保护与绿色生产考核试卷
- 铸造工艺参数优化与生产效率提升考核试卷
- 铅锌矿资源勘查与开发利用实践案例分析考核试卷
- 急救物品管理制度
- 创伤弧菌感染防治要点
- 消化呼吸循环系统图谱解读
- 新生儿心脏病教学查房
- 简易呼吸皮囊使用
- 历史明清时期:统一多民族封建国家的巩固与发展单元卷 2024-2025学年部编版七年级历史下学期
- GB/T 26879-2025粮油储藏平房仓隔热技术规范
- 《流行性乙型脑炎》课件
- 散剂的工艺流程
- 七年级数学新北师大版(2024)下册第一章《整式的乘除》单元检测习题(含简单答案)
- 敏感肌肤的护理方法
- 《课件铁路发展史》课件
- 2025年贵州茅台酒厂集团招聘笔试参考题库含答案解析
- 消渴中医护理查房
- 移动通信汛期安全课件
- 2025年江西江铜集团招聘笔试参考题库含答案解析
- 《中药调剂技术》课件-中药调剂的概念、起源与发展
评论
0/150
提交评论