1、完整工程施工合同translation:construction contractparty a: (developer)party b: (contractor)this contract is signed by the two parties party a and party b according to the contract law of the peoples republic of china, the contraction law of the peoples republic of china , and other relevant national laws and

2、 regulations, as well as the specific nature of this project. on the basis of honesty and credit, equality, voluntariness, party a and party b have reached consensus through negotiations and signed this contract.1.project introduction1.1 name of project:1.2 location of project: from to .1.3 scope an

3、d content of the project: .1.4 the design of construction drawings: .2.nature of contracting: contract for labor and materials .3.construction periodthis project will take 20 days after the receive of the beginning notice from party a (including reception time after completion),and including the beg

4、inning date and completion date.4.quality of projectquality of project: qualified .5.contract amount5.1 contract amount: be rmb 400,000 yuan tentatively (the actual settlement shall prevail).5.2 adjustment of contract amount: .6.final audit of the project6.1 the condition and steps for party a pay t

5、he project funds to party b:party a agrees to pay party b for rmb150,000yuan three days after the beginning of the project,the balance will be paid 97% after the qualified completion, and 3% warranty guarantee fee will be paid one years if there is no quality problem.6.2 mode of payment: .6.3 party

6、b shall submit to party a equivalent invoice before party as each period payment, otherwise, party a can refuse to pay until the receiving of t he party bs invoice.6.4 the invoice provided by party b should be valid. any falls invoice provided by party b which are found by relevant office, the party

7、 b should not only provide the valid invoice to party a, but also bear the responsible caused by the invalid invoice.7.variation of design and visa7.1during the process of the project, any contract list, technology checking list ( not include the variation, addition, substitution, and reduction on t

8、he drawings and project fee) concerning about this project shall only be regarded as effective with the confirmation of the representative party a in writing.7.2 any variation notice list, technology checking list, contract list, technology checking list ( include the drawings design) concerning abo

9、ut this project shall only be regarded as effective with the confirmation of the seal of party a.7.3in the event of party b fails to complete the project according to the drawing variation, party b shall pay to party aas penalty for the breach.party b will also bear the responsible and the reworking

10、 fee caused by the continued working regardless of the new design.7.4party b shall take full responsibility for any loss caused by delaying for more than days applying for extension vise from party a days after the receiving of changed design.8. acceptance and final audit of the project8.1 acceptanc

11、e of the project8.1.1this project should meet the national quality acceptance standards and should be accepted at the first inspection after completion. the quality acceptance criteria of construction of nation must be regarded as the acceptance standards for the project. party b shall inform party

12、a in writing of all kinds of inspection and acceptance withi n 3 days.party a shall arrange inspection and acceptance within 3 working days after receiving the notification.8.1.2party b shall be responsible for the re-inspection cost, and the project periodshall not be extended.8.2 final audit of th

13、e projectif the result of re-inspection has passed acceptance standards, party b shall submit the audit report and materials to party a for verification within 7 days. (the materials include ).9.obligations of party a and party b9.1. obligations of party a:9.1.1.party a appoints as the on-site repre

14、sentative to supervise the fulfillment of contract obligations, to oversee the quality control and check the project progress, and to handle issues such as acceptance and variations and withdraw the representative at any time.9.1.2. days before beginning of the project, party a shall provide party b

15、 .9.1.3. party a shall confirm the variation and suggestion days after providing to design drawings and scheme to party b.9.1.4.party a shall be responsible for coordinating the relationship with the engining.9.2. obligations of party b9.2.1.party b appoints wangzhirong as the on-site representative

16、 of party b to take ch arge of fulfilling the contract obligations. the on-site representative of party b shall o rganize the construction according to contract requirements so that the project can be completed according to the quality and quantity requirements and on a timely manner.9.2.2.party b s

17、hall observe safetypolicies of on-site management by the state and guangxi , nanning government authorities and shall independently and fully assumes responsible for the loss caused by violation.9.2.3party b shall observe policies of on-site management by the state and local gover nment authorities

18、as well as party a's rules and regulations; party b shall compensate for the losses to any facilities, equipment or pipelines both inside and outside of the co nstruction yard caused by party b.9.2.4.during construction, party b should make such adjustment to the construction pl an and the progr

19、ess schedule per party a's instruction and change-orders.9.2.5. party b should transfer the construction site within days after the qualified completion.10.agreement on safetyparty b must strictly adhere to the safety and technical standards of construction an d infrastructure installation and r

20、egulation of china, guangxi zhuang autonomous region, nanning safety standards and other relevant regulations and standards.the construction spot should meet all standards of the people's republic of china. and bearing the safety fees which are not caused by party a.11.the concerning material su

21、pply11.1. party a or party b should be responsible for the material ,equipments,which should meet the qualified design request with qualification guarantee books.11.2. any material,equipment which is bought by the party b, if not agree with the quality request or specification contain difference,sho

22、uld forbid any usage.the party b should rebuy the equipment and bear the responsibility to make sure no delay on the project.if party b refuses to change the materials, party a has the right to terminate the contract and asks for loss from party b.11.3 any material,equipment which is bought by the p

23、arty a, if not agree with the quality request or specification contain difference,should forbid any usage.the party a should rebuy the equipment and bear the responsibility to make sure no delay on the project.12.warranty12.1.warranty scope: as state in the contract.12.2.warranty period: 1 year afte

24、r the qualified completion.12.3during the warranty period, party b shall fix within 2 days after receiving the notice from party a. in the event of party b fails to fix the defects on a timely manner, party a has the right to hire a third party to do the repair, and any costs incurred shall be burde

25、ned by party b.12.4. mode of notices: phone, fax, e-mail, and so on.12.4.1 in the way of call the phone or faxing: party b s tel:,fax: . these contact ways will be regarded as the evidence of warranty notice to party b after the calling and faxing.12.4.2.in the way of posting: party b s address:. th

26、ese contact ways will be regarded as the evidence of warranty notice to party b after e-mailing.12.4.3. in the way of e-mailing: party b s e-mail: . these contact ways will be regarded as the evidence of warranty notice to party b after e-mailing.12.4.4. the fees of noticing party b will be borne by

27、 party b.12.5. project quality retention fee(tip: the blue words will be suite for under the condition of withing the project quality retention fee)12.5.1project quality retention fee: , which will be deduce from the project funds of party b.12.5.2 after the expire date, party a will return the rest

28、 of the quality retention fees without interest to party b. this will be applied by party b within ten days after the completion of qualified project.13. liabilities for breach13.1.in the event of party a fails to make payment according to the payment terms, party a should pay a late fee to party b;

29、 daily rate of the late fee is % of the payment. if the delay of the payment is caused by party a and is delayed for more tha n days, then party b can terminate this contract.13.2in the event of party b fails to complete the project according to the construction period in the contract, party b shall

30、 pay % of the t otal contract amount for each day overdue as penalty for the breach. daily rate of the l ate fee is % of the payment.13.3.party a can terminate this contract and party b shall take full responsibility for a ny loss caused by this when one of these condition takes place.13.3.1 overdue

31、 over days.13.3.2party b transfers the contract and any part of the contract and its corresponding to any third party without party a's consent in writing.13.3.3.be ordered to shut down by the administrative organ caused by party b over days.13.3.4.safety and quality accidents.13.3.5. the materi

32、als provided by party b differs from the qacertificate and the report of quality assurance test. and party b can not make change on these material.13.4.party b should make salary/wages payment to all construction staffs in time on a monthly basis, and will be fully responsible for any liabilities ca

33、used by any loss or da mage to party a as a result of party b's failure to pay salaries and wages according to the requirements. in the event of migrant workers create a disturbance on group site, party a's premises, office space, party b should paid penal sum yuan each time.13.5.in the event anyparty shall fail to complete the work in time owing to reasons that the contractor shall be held liable, the party shall pay a penalty for rmb yuan, and bear all be loss of the other party.13.6. penal sums and other penalty fees that party b should to party a , party a can take out the same

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论