电气英文自我评价_1_第1页
电气英文自我评价_1_第2页
电气英文自我评价_1_第3页
电气英文自我评价_1_第4页
电气英文自我评价_1_第5页
已阅读5页,还剩8页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、自我鉴定示范文本 | Excellent Model Text 资料编码:CYKJ-FW-933编号:_电气英文自我评价编辑:_日期:_单位:_电气英文自我评价用户指南:该自我鉴定资料适用于把阶段时间里取得的成绩、存在的问题及得到的经验和教训进行一次全面系统的总结,明确下一步的工作方向,少走弯路,少犯错误,提高工作效益作用。可通过修改使用,也可以直接沿用本模板进行快速编辑。This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to

2、 the advantages and correct deficiencies, according to company requirements, summarized as follows: in a year's work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of wo

3、rk is only constantly sum up the lessons learned and found that in order to make their own faster progress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electri

4、cal technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technolo

5、gy and new technologies.Over the past year, I have been working hard, fulfilling my duties seriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipment

6、problems encountered actively to the scene to deal with failures, eliminate hidden dangers. Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of cen

7、tralized control; understand the control signal routing layout, information transmission. Now many aspects have made great progress, for example: the communication 2 × × station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, K

8、ing configuration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge

9、 and the actual production of effective combination for the future to better theory with practice, better promote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid

10、a solid foundation. Other aspects of meticulous improvement and completion of electrical safety regulations and measures to seriously monitor the implementation of the annual maintenance in the XX 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually d

11、o not see, so I coal washing Plant electrical equipment with a deeper understanding.Material plan to provide timely, comprehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at w

12、ork, I ran the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of production. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transfor

13、mation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the purchase of passive, and Resulting in equipment failure problems. Low voltage power distribution room of the new plant are used in the dom

14、estic production of electrical components, AC contactor with the use of materials often aging, poor access to auxiliary early, the signal is not normal and so on, after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accide

15、nt occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing.In the work, the first is strict on their own, do not allow the staff to do, their firm quit, for the field workers to set an example. In the implementation of the imp

16、lementation of procedural measures, the strict on-site, the work of a number of measures do not quit. The illegal behavior of workers and non-standard behavior resolutely stop. In the production of security incidents and accidents affecting the production of serious organizational analysis, do not g

17、o through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyone's purpose. The second is to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking in

18、to account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout, , There are checks. Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practic

19、al experience and personal qualities. Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-seeking results, and further improve their management level.Second, join the technical innovation, never in innovationIn the work, seriously

20、to the old comrades to learn, and constantly improve themselves, and use other time, learn more new knowledge. And actively participate in the plant plc program control system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation aut

21、omation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in ways and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the des

22、ign of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, you can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average as

23、h value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous ch

24、ain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fifth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, compared with the set perce

25、ntage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuring instrument Adjustments are being made to meet actual production requirements. So that the driver in accordance with the production need

26、s of the timely adjustment of ash to avoid excessive ash caused unnecessary losses.Third, shortcomings and shortcomingsAs the time to the coal preparation plant is still small, so in many aspects of technology and experience are inadequate, less problems encountered, the problem can not be handled h

27、andy. In the future work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, humbly to the experienced veteran workers, the old master learning; In addition, the timely organization of lessons learned, Of the problem, do not unde

28、rstand the problems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the future, can be faster to deal with the organization. Serious study of management methods and methods to make their own production organization in the fu

29、ture, to better complete the leadership of the work and tasks assigned. In previous work, consider the problem is often not comprehensive, do not consider the consequences of doing things, not only delayed their own, but also affected the others, in the future work and study, must strengthen the study to make themselves more quickly mature.Fourth, self-evaluationIn short, through a year of productive labor and technical learning, I thought and technical

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论