1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels mu

2、st firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ev

3、er-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "cle

4、ar rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with th

5、e "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards.

6、Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, ru

7、nning accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum

8、around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avo

9、id the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touch

10、es work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scie

11、ntific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of附录A: 复测、分坑、验槽及杆塔号对照表 Q/CSG表1-A.1路径复测记录表(线记1) 工程编号: Q/CSG表1-A.1

12、设计桩号杆塔 型式档 距m线 路 转 角塔位高程m直线桩横线路偏移mm备注设计值实测值偏差值设计值实测值方向偏移值备注1.请注明直线转角。2.仪器名称: 仪器编号: 检验证书号: 监理: 质检员: 施工负责人: 检查人: Q/CSG表1-A.2被跨越物及地形凸起点测量记录表(线记2)工程编号: Q/CSG表 1-A.2 跨越档档 距m被 跨 越 物(或地形凸起点)名 称高 程m与 邻 近 桩 位最 近 距 离备注设计桩位距离m 监理: 质检员: 施工负责人: 检查人:为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加

13、公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all sh

14、ut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterpr

15、ise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value

16、-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on

17、 the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervi

18、sion mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang s

19、upport river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row&

20、quot; engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other

21、 water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fiel

22、ds, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continu

23、e to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created1 Q/CSG表1-A.3普通 (掏挖) 基础和拉线基础分坑及开挖检查记录表(线记3)设计桩号杆塔型基础型施工日期年 月 日呼称高施工基面检查日期年 月 日序号检查项目允许偏差检查结果备注1转角杆塔角度设计值0°1302直线杆塔桩位置 mm横线路:503基础根开及对角线尺寸mm设计值ABBCCD ABBCACD

24、ABDCDDA±2ACBD4基础坑深mm设计值:AB100,50CD5基础坑底板断面尺寸mm设计值:AB1%CD6拉线基础坑位置mm设计值:ACE±1%LBDF7拉线基础坑深mm设计值:AB C+100,不允许有负偏差DEF8拉线坑马道坡度及方向符合设计要求ABCDEF备注1. L为拉线基础坑中心至拉线固定总水平的距离。2. 仪器名称: 仪器编号: 检验证书号:3. 掏挖基础的尺寸不允许有负偏差。工程编号: Q/CSG表1-A.3 监理: 质检员: 施工负责人: 检查人: Q/CSG表1- A.4 地基基坑(槽)检查记录表(线记4)工程编号: Q/CSG表1- A.4 设计

25、桩号杆塔型基础型施工日期 年 月 日呼称高施工基面检查日期 年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果评定1基坑(槽)底土质类别关键符合设计要求ABCD2地质基坑草图:施工单位代表: 年 月 日3监理鉴定意见:监理代表: 年 月 日设计核查意见:设计代表: 年 月 日备注设计有验槽要求的基础填写本表。 监理: 质检员: 施工负责人: 检查人:Q/CSG表1- A.5杆塔号对照表(线记5)工程编号: Q/CSG表1- A.5 运行线路名称线路设计名称(标段)起止杆塔设计桩号起止杆塔运行塔号杆塔数量运行塔号所在塔情况回路情况运行塔号所在塔情况回路情况监理负责人:技术负责人:填写

26、日期 年 月 日备注1. 所在塔情况:按实际情况,新建塔的填写设计桩号;利用旧塔的填写原线路名称及塔号。2. 回路情况:按实际情况,填写在多回路塔上运行线路所用的实际回路。附录B: 架空输电线路工程 分项工程质量验收记录表【W001】Q/CSG表1- B.01路径复测 分项工程质量验收记录 (线土1) 工程编号: Q/CSG表1- B.01 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1转角桩角度关键设计值:1302档距La重要设计值:13被跨越物高程m关键设计值:0.54杆(塔)位高程m关键设计值:0.

27、55地形凸起点高程m关键设计值:0.56直线桩横线路方向偏差mm关键设计值:507被跨越物与邻近杆(塔)位距离L重要设计值:18地形凸起点b、风偏危险点与邻近杆(塔)位距离L重要设计值:1监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注a L为档距,L为被跨越物或地形凸起点、风偏危险点与邻近杆(塔)位的水平距离。b 地形凸起点是指地形变化较大,导线对地距离有可能不够的地形凸起点。 【H001】 Q/CSG表1- B.02普通基础分坑与开挖 分项工程质量验收记录(线土2)工程编号: Q/CSG表1- B.02 设计桩

28、号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1基础根开及对角线尺寸mm关键设计值:AB: BC: CD: DA:AC: BD:AB:BC:±2CD:DA:AC:BD:2基础坑深mm关键设计值:100503基础坑底板尺寸重要设计值:1监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注【H002】Q/CSG表1- B.03拉线基础分坑与开挖 分项工程质量验收记录(线土3 )工程编号: Q/CSG表1- B.03 设计

29、桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值1拉线基础坑位置La关键设计值:12拉线基础坑深度mm关键设计值:100,不允许有负偏差3马道坡度及方向重要符合设计要求监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注a L为拉线坑中心至拉线挂点的水平距离。【H003】Q/CSG表1- B.04岩石、掏挖基础分坑与开挖 分项工程质量验收记录(线土4) 工程编号: Q/CSG表1- B.04 设计桩号基础型施工基面施工日期年 月 日基

30、础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1基础根开及对角线尺寸mm关键设计值AB: BC:CD: DA:AC: BD:AB:BC:CD:DA:±1±0.7BD:AC:2基础坑深mm关键设计值:不小于设计值3基础坑底板尺寸重要设计值:不小于设计值4基础立柱尺寸重要设计值:10.7监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注Q/CSG表1- B.05施工基面及电气开方 分项工程质量验收记录(线土5)工程编号: Q/CSG表1- B.

31、05 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1施工基面高程mm关键设计值:200,100140,702塔位边坡净值关键设计值:不小于设计值3风偏及对地净值重要设计值:不小于设计值监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注 【S001】 Q/CSG表1- B.1现浇、掏挖(等高)铁塔基础 分项工程质量验收记录 (线基1) 工程编号: Q/CSG表1- B.1 设计桩号杆塔型施工基面施工日期年 月 日基础型

32、式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1地脚螺栓规格、数量关键设计值:符合设计要求2主钢筋规格、数量关键设计值:符合设计要求3混凝土强度关键设计值:试块强度: MPa试验报告编号:不小于设计值4立柱断面尺寸mm重要设计值:1%0.7%5底层(掏挖)断面尺寸mm重要设计值:1%6基础埋深mm重要设计值:100,50100,07钢筋保护层厚度mm重要58整基基础中心位移mm顺线路重要3021横线路30219整基基础扭转一般塔重要107高塔5410回填土重要符合GB502332005第4.0.7-4.0.10条规定11同组地脚螺栓中心与立

33、柱中心偏移 mm一般1012基础顶面高差mm一般513基础根开及对角线尺寸mm设计值一般AB: BC:CD: DA:AC: BD:AB:BC:一般塔±2±1.4CD:DA:高塔±0.7±0.5AC:BD:14混凝土表面质量外观外观质量无缺陷及表面平整光滑监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注掏挖基础的尺寸不允许有负偏差。【S001】Q/CSG表1- B.2 现浇、掏挖(不等高)铁塔基础 分项工程质量验收记录 (线基2)工程编号: Q/CSG表1- B.2 设计桩号杆

34、塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1地脚螺栓规格、数量关键设计值:符合设计要求2主钢筋规格、数量关键设计值:符合设计要求3混凝土强度关键设计值:试块强度: MPa试验报告编号:不小于设计值4立柱断面尺寸mm重要设计值:1%0.7%5底层(掏挖)断面尺寸mm重要设计值:1%6基础埋深mm重要设计值:100,50100,07钢筋保护层厚度mm重要58整基基础中心位移mm顺线路重要3021横线路30219整基基础扭转一般塔重要107高塔5410回填土重要符合GB502332005第4.0.7-4.0

35、.10条规定11同组地脚螺栓中心与立柱中心偏移 mm一般1012基础顶面高差mm一般513基础根开及对角线尺寸 顺线路设计值一般一般塔半根开AABBCCDD实测值±2±1.4横线路设计值AABBCCDD高 塔实测值设计值±0.7±0.5半对角AOBOCODO实测值14混凝土表面质量外观外观质量无缺陷及表面平整光滑监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日项 目 部年 月 日施 工 队年 月 日项 目 部年 月 日备注掏挖基础的尺寸不允许有负偏差。【S002】Q/CSG表1- B.3铁塔拉线(含锚杆)基础 分项工程质量验收记录(线

36、基3) 工程编号: Q/CSG表1- B.3 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCDEF1拉线基础埋件及钢筋规格、数量关键符合设计要求制作工艺良好2混凝土强度关键设计值:试块强度: MPa 试验报告编号:不小于设计值3底板断面尺寸关键设计值:1%0.7%4基础埋深mm重要设计值:1005锚杆拉线基础孔角度重要2°孔径+20mm孔深+100mm6保护层厚度mm重要-57回填土重要符合GB502332005第4.0.7-4.0.10条规定8拉线基础拉环中心与设计位置偏移mm重要20

37、149拉线基础中心在拉线方向的位移左右一般1%L0.7%L前后1°4210拉线棒外观拉棒无弯曲、锈蚀,角度方向一致整齐11混凝土表面质量外观外观质量无缺陷及表面平整光滑监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注1. L为拉线环中心至拉线固定点的水平距离。2. 拉线基础的尺寸不允许有负偏差。 【S003】Q/CSG表1- B.4 岩石铁塔基础 分项工程质量验收记录 (线基4 )工程编号: Q/CSG表1- B.4 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性

38、质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1地质(岩石)性能关键设计值:符合设计要求2地脚螺栓(锚杆)规格、数量关键设计值:符合设计要求3锚杆孔径mm关键设计值:嵌固式大于设计值钻孔式20,04锚杆埋深mm关键设计值:符合设计要求5混凝土强度关键设计值:试块强度: MPa 试验报告编号:不小于设计值6整基基础中心位移mm顺线路重要3021横线路30217整基基础扭转一般塔重要107高 塔548基础顶面高差mm一般59基础根开及对角线尺寸mm设计值一般AB: BC:CD: DA:AC: BD:AB:BC:一般塔±2±1.4CD:DA:高塔±0.7&#

39、177;0.5AC:BD:10防风化层外观符合设计要求监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注岩石基础的尺寸不允许有负偏差。 【H004】Q/CSG表1- B.5混凝土电杆基础 分项工程质量验收记录(线基5)工程编号: Q/CSG表1- B.5 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值1预制件规格、数量关键符合设计要求2预制件强度关键设计值:试块强度: MPa试验报告编号:符合设计要求3拉环、拉棒规格数量关键符合设计要求4底盘埋深mm关键设计值:左右100,50100,05拉盘埋深mm关键设计值:ABCD1006底盘高差关键±20左右7基础中心位移mm顺线路关键5035横线路50358回填土关键符合GB502332005第4.0.7-4.0

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论