1、.地基与基础水泥砂浆防水层(1) preparation for construction1, materials(1) cement: use 325 ordinary portland cement, expansion cement or slag Portland cement. In case of corrosive media action should beSelection according to design requirements.(2) sand: the use of medium sand, shall not contain debris, including
2、 mud shall not exceed 3%, the particle size greater than 3mm of sand should be screened before use.(3) admixture: use water reducing agent, early strength agent and other admixture, add organosilicon waterproof agent and water glass gypsum waterproof accelerator.2, operating conditions(1) the baseme
3、nt reserved holes and drainage pipe installation, and for concealed acceptance procedures.(2) the surface of the base should be smooth, solid, rough and clean, rigid multilayer (five layer method), cement mortar waterproof layer requires full surfaceMoist without water. Concrete wall, ground, such a
4、s honeycomb and loose, to be removed, after pouring belt, construction joints should be cut hair, washed clean with water.First coated with cement paste (1:1 cement mortar 10%107 glue thin coating layer) is a layer of 2mm, and then use 1:3 cement mortar or 1:2 hardThe cement mortar is compacted and
5、the surface has oil. Clean with 10% concentration caustic soda (sodium hydroxide) solution.(3) with waterproof layer mixed mortar masonry brick, brick row must be in the seam depth of 8 10mm.(4) embedded parts, pre buried pipelines exposed at the grassroots level must be around the tick 20 30mm wide
6、 and 50 60mm deep trench, 1:2Dry hard cement mortar compaction.(5) concrete base treatment;1) the new concrete project, should be made of rough surface, immediately after stripping the wire brush, brush the surface of wool blended coagulation and smooth.Wipe before watering washed clean.2) the old c
7、oncrete fill do waterproof layer, a drill, chisel, wire brush surface roughening, dry cleaning and then rushed the wholeWater, scrub clean.3) the surface is uneven and the honeycomb holes shall be treated separately according to different conditions.4) the construction joints of the concrete structu
8、re shall be labeled as "V" shaped trough along the seam. After washing with water, the mortar shall be washed with limeThe bottom and cement mortar are compacted and dried. The groove depth is about 10mm, about 25mm wide.(6) brick masonry base treatment: for new masonry, should be the surf
9、ace of residual mortar and other dirt clean, and water irrigation. YesIn the old masonry, should be clean and crisp skin surface dirt mortar.(7) stone and stone processing base1) for lime mortar or mixed mortar masonry, the grey joint shall be 1cm deep and the fillet shall be rounded.2) for surface
10、stone masonry, after cleaning, should make leveling layer on the base surface. The method is: brush water ash than 0.5 of Cement NetA thick, about 1mm; and then wipe 1:2 cement mortar, thick 11.5cm, and the surface into the surface of the hair. One can not find the usual intervalsLayer and grade lev
11、eling.(8) mixture ratio and mixing system of mortar1) proportioning of mortarsPlaster: water cement ratio is 0.340.4, the standard cone sinking depth is 70mm. Cement paste: water cement ratio is 0.550.60. Cement mortar:Cement sand ratio 1:1.52.5, water cement ratio is about 0.400.50, the standard co
12、ne sinking depth is 7580mm.2) mixing of mortarThe mixing of mortar should be made by mechanical agitation or by artificial agitation. Mixing should be strictly in accordance with the ratio of feeding, mixing evenly,Cement mortar consistency should be controlled at 70 80mm, cement mortar should be mi
13、xed with the use.The mixing time of mortar is controlled by ordinary portland cement mortar. When the temperature is 520 degrees centigrade, it should not exceed 60minWhen the temperature is 2535 degrees centigrade, it should not exceed 45min. Slag Portland cement mortar and volcanic ash Portland ce
14、ment mortar, respectively, should not be appropriateMore than 90min and 50min.(two) operation process1, concrete roof and wall five layer waterproof operationFirst layer: cement paste layer, thick 2mm. First wipe again 1mm thick cement, iron trowel used in pressure from wiping the surface of the bas
15、e of pore filling,Then on its surface and then put on a 1mm thick cement mortar leveling layer, and wet brush on the surface of cement paste in the order of gently brushing again.Second layer: cement mortar layer, thick 45mm. In the cement paste layer, the initial setting is to smear the cement mort
16、ar layer and apply the pressure to make the mortar layer thin and press out the waterSuitable mud. When the mortar is finished, the transverse stripes are swept in a direction in a direction when the mortar is initially coagulated.Third layer: cement paste layer, thick 2mm. In the second layer of ce
17、ment mortar solidification, and has a certain intensity (usually 12 hours), proper watering wetRun time with trowel compaction, general wiping pressure 34 times is appropriate, the same way as the first layer.Fourth layer: cement mortar, thickness 4 5mm. In the third layer before coagulation, accord
18、ing to the construction method of second layers, after the pressure does not sweep stripes, andIn the mortar before the initial setting time, wiping pressure 3 4 times, the last light again.Fifth layer: cement paste layer, thick lmm. After fourth layers of cement mortar have been pressed two times,
19、the cement paste is evenly coated on the fourth layer with a brushFace, press fourth layers to press the light.Five layer plastering method is mainly used in waterproof engineering to meet the water, while the back with four layers of plaster can be.2., brick wall surface and vault waterproof layer
20、operation.The first layer is to brush cement paste again, the thickness of about LMM, brush and brush evenly. After brushing, and then wipe second, third, fourth layers, and so onThe operation method is the same as that of concrete base waterproof layer.3. stone wall and vault waterproof layer opera
21、tionTo be leveling layer (cement paste and mortar each layer), cement mortar hardening, and then in its surface proper watering wet, can carry on waterproof layer applicationThe operation method is the same as that of the coagulation base.4. operation of ground waterproof layerFloor waterproof opera
22、tion and metope, roof operation is different, the cement paste layer does not use scraping method, but the mixing of cementPulp poured on the ground, with the brush back and forth to play evenly, and the second, fourth layer is the cement paste layer, before and after the coagulation of cement morta
23、r layer thickDegree requirements are evenly paved, press the wall and roof operation requirements, and the thickness of each layer is the same as that of the wall and roof waterproof layer.5., waterproof layer construction joints need to stay slope, ladder shaped rubbing, and should be in accordance
24、 with the sequence of operation, continuous construction layer by layer, bonding closely. Remaining digitIt should be left on the ground or on the wall, but it should be left at the 200mm of the Yin and Yang jiao.6., the structure of yin and Yang corner, should be made into garden angle, Garden arc
25、radius of general, Yin Kok is 50mm, Yang Kok 10mm.7. conservation(1) a cool, damp basement, underground ditch, etc., without watering and maintenance.(2) in general, after the end of the waterproof layer, water every 4 hours, keep the waterproof layer surface often wet. Maintenance period of waterpr
26、oof layerFor 14 days. In good ventilation and sunlight, should be covered with wet straw, sack on the waterproof layer.8, finished product protection(1) the scaffold shall be removed from the wall 200mm, and the scaffold shall not be damaged when it is disassembled.(2) wipe off the waterproof mortar
27、 surface, within 24 hours is strictly prohibited on the stampede.(three) quality standard1. ensure the project(1) the mixing ratio of raw materials and additives and their layering methods must be in accordance with the design requirements and construction specifications.(2) cement mortar waterproof
28、 layer and the base must be combined with the firm, no hollowing.2. basic items(1) the appearance of dense, smooth surface, no crack, sand and void defects, yin and yang angle is in a circular arc shape or obtuse, size.(2) keep the correct position, according to the order of operation, layers of overlapping tight. Repair of hollowing and cracks, the waterproof layer into the hollowing outRamp. ,(four) avoid engineering quality defects(1): primary pollutants not handle the hollowing of cement slurry or brush before
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025青岛上合控股发展集团有限公司社会公开招聘(31人)考试笔试备考试题及答案解析
- 2025重医附二院中西医结合医学中心技师(编外)招聘2人参考笔试试题及答案解析
- 2026中国农业银行浙江省分行校园招聘925人备考题库含答案详解
- 2025海南儋州市专职网格员招聘为社区专职工作人员127人备考题库(一)含答案详解(夺分金卷)
- 2025四川省德阳经开区招聘社区专职8人备考题库及一套完整答案详解
- 2025广东广州市海珠区新港街道第二批雇员招聘4人备考题库附答案详解ab卷
- 成都高新区社区卫生服务中心2025年公开招聘工作人员备考题库(94人)及答案详解(网校专用)
- 2025年舟山岱山县东沙镇人民政府招聘编外人员1人备考题库含答案详解(预热题)
- 2026中国建设银行宁夏回族自治区分行校园招聘180人备考题库附答案详解(培优)
- 2026年陕西省选调生招录备考题库(面向中国农业大学)附答案详解(预热题)
- 35kV-220kV输电线路通道林木清理检修施工方案
- JT-T-1201-2018带式收油机行业标准
- 校园科研人才服务系统需求说明
- 外国建筑赏析智慧树知到期末考试答案章节答案2024年清华大学
- 幼儿教师职业礼仪中职全套教学课件
- 非线性动力学培训课件
- DB43-T+2146-2021悬浮式拼装地板通用技术规范
- “身边的文化遗产”主题历年中考语文综合性学习试题汇编
- 《高等数学E》课程教学大纲及课程介绍
- 第十章 问题解决与创造性
- 团体心理咨询的基础
评论
0/150
提交评论