




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、DCBA16-7-16CFCLiangliang HUJian SunHongqian ChuREV.DateStatusDrafted byReviewed byApproved byModificationThe supply of Turkey KARABIGA 2 x 660MW USC coal Fired Power Plant project(PURCHASE ORDER : 4101185344/0 )TITLE标题NDT ProcedureIssued by SHANDONG SUNHE POWER TECHNOLOGYCo., Ltd.Internal identifica
2、tion number内部编码It must not be used, reproduced, transmitted or disclosed without the prior written permission of the Shandong SUNHE POWER TECHNOLOGY Co., Ltd.本文件,未经山东尚核电力科技有限公司书面批准不得外用、复制和泄露。一、The delegate of NDT无损检测的委托Need to be detected according to the drawings or technical documents, materials,
3、parts or products, must after appearancequality inspection, nondestructive testing orders will be completed by the clients, after the client inspectors signature confirmation, I conduct nondestructive testing department test.Orders of NDT testing on the basis of nondestructive testing personnel, is
4、my company commissioned, after carefully review orders, once found the problem, should be timely feedback to the entrusted departments or personnel. Review highlights include checking the product number, name, were, detection methods, detection ratio, entrusted by the qualified level is conformed to
5、 the drawings, standards and specification requirements.根据图样或技术文件要求,需检测的材料、零部件或产品,必须经外观质量检查合格后,由委托方填写无损检测委托单,经委托方检查人员签章确认后,交我公司无损检测部门实施检测。无损检测委托单是我公司无损检测人员检测的依据,接受委托后,要认真审查委托单,一旦发现问题,应及时向委托部门或人员反馈信息。审查重点包括核对产品编号、名称、台次、委托的检测方法、检测比例、合格级别等是否符合图 样、标准及规范要求。二、 The prepare of NDT 无损检测的准备Should be fully pre
6、pared before implementation of nondestructive testing.Mainly has the following three aspects:1, nondestructive testing personnelAccording to the requirement of the nondestructive testing orders, arrange testing has the corresponding qualification of NDT personnel.2, instruments and equipment calibra
7、tionNondestructive testing instruments and equipment shall meet the requirements of the products nondestructive testing, and by class II or class II above personnel in accordance with the provisions of Calibrate the instrument and equipment, in order to ensure the accuracy of the instruments and equ
8、ipment used, to ensure the quality of nondestructive testing.3, test process cardAccording to the tested product pattern, the welding procedure specification and blanking layout diagram, the class II or class II above of nondestructive testing personnel for nondestructive testing process card, the N
9、DT engineer or level III personnel after the audit implementation of nondestructive testing personnel.实施无损检测前,应做好充分准备。重点有以下三方面:1、无损检测人员根据无损检测委托单的要求,安排具有相应无损检测资格的人员进行检测。2、仪器、设备校验无损检测仪器设备应满足产品无损检测的要求,并由II 级或 II 级以上人员按规定对仪器设备进行校验,以保证仪器设备的使用精度,进而保证无损检测质量。3、检测工艺卡的编制根据受检产品的图样、焊接工艺规程和下料排版图,由II 级或 II 级以上无损检
10、测人员编制无损检测专用工艺卡,经无损检测责任工程师或III 级人员审核后交无损检测人员实施。三、The implementation of NDT无损检测的实施1, the requirements for testing surfaceEvery need to nondestructive testing of surface quality, should be through to the appearance inspection, issue orders, the entrusted all can implement the detection.2, review on the
11、 surface of detectionAfter receiving orders, nondestructive testing personnel or professional responsible for personnel according to orders for the surface quality of test parts one by one check, confirmed by the review, after having confirmed before testing. Do not conform to the requirements, if a
12、ny, shall be timely feedback to the client for processing and qualified nondestructive testing of the reentry after.3, conduct checked parts testAccording to the order of test parts and test methods, inspection personnel should be according to the requirement of the test procedure and process card i
13、nstrument and equipment debugging, testing and evaluation, record test conditions, test results and draw parts diagram, and completes the NDT tag on workpiece,4, repair and the reinspection do not coincideIn the process of nondestructive testing, such as when he found the defects of the checked part
14、s have not allowed, by class II or class II above the delegate nondestructive testing personnel issued a notice of repair, approved by detecting the responsibility division, pay to the tissue repair. After repair, the client to check the quality of the repair parts of the surface after confirm quali
15、fied, check bar in the original notice of repair repair sign, pay by the entrusting party NDT department according to the original detection method for testing. To test the local weld defects have not allowed, there should be on both ends of the flaw extension part of the expansion agent.1、 对检测表面的要求
16、凡需进行无损检测的表面质量,应经委托方外观检查合格,签发委托单,受委托方方可实施检测。2、 对检测表面的复查接到委托单后,无损检测人员或专业负责人员要根据委托单对被检部位的表面质量逐一复查,经复查确认无误后,方可进行检测。如有不符合要求的,应及 时反馈给委托方重新进行处理,合格后再进行无损检测。3、对被检部位实施检测根据委托单规定的检测部位和检测方法,检测人员应按检测工艺规程和工艺卡的要求调试仪器设备,进行检测和评定,记录检测条件、检测结果和绘制检测部位示意图,并在工件上做好无损检测标记,4、返修和复验在无损检测过程中,如发现被检部位有不允许的缺陷时,由受委托方无损检测 II 级或 II 级以
17、上人员开出返修通知单,经检测责任师认可,交委托方组织返修。 返修后, 委托方对其返修部位的表面质量进行检查确认合格后,在原返修通知单返修检查栏签字,交受委托方无损检测部门按原检测方法进行检测。对进行局部检测的焊接接头有不允许的缺陷时,还应在该缺陷两端的延伸部位扩探。四、Test report issued b瀚测报告签发Nondestructive testing after qualified by class II or class II above personnel fill in according to the process card testing records and ot
18、her data nondestructive inspection report, after signing by nondestructive testing engineer, pay the owner to confirm, in product quality file.无损检测合格后,由II级或II级以上人员依据工艺卡检测记录等资料填写 无损检测报告,经无损检测责任工程师审核签字后,交业主确认,归入产品质量档案。Nondestructive testing quality controlcontrol elementControl pointsControl ClassPerson in chargeAccept the taskcommissionedReview PointNondestructive testing class II or above personnelTest preparationPersonnel qualificationReview PointNondestructive testing engineerInstruments and equipment calibrationReview PointNondestructive testing class I
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025湖南湘潭市雨湖区鹤岭镇中心卫生院见习公开招聘考前自测高频考点模拟试题及答案详解(网校专用)
- 2025年宁波市鄞州区面向社会公开招聘社区专职工作者55人考前自测高频考点模拟试题及完整答案详解1套
- 2025广东惠州市龙门县乡村公益性岗位招聘26人考前自测高频考点模拟试题及答案详解一套
- 2025年急诊科常见病症处理应急模拟考试卷答案及解析
- 2025年外科学手术技巧检测模拟考试答案及解析
- 2025湖南怀化市溆浦县招聘事业单位人员65人模拟试卷有答案详解
- 2025年口腔科手术操作规范与器械使用考核答案及解析
- 2025河南商丘市民权县消防救援大队招聘政府专职消防员32人模拟试卷完整参考答案详解
- 2025年中西医结合治疗疼痛病症的药物选择模拟考试卷答案及解析
- 2025年度中国铁路上海局集团有限公司招聘普通高校毕业生72人三(本科及以上学历)模拟试卷及答案详解(夺冠)
- JJF(皖) 174-2024 重点用能单位能源资源计量在线审查规范
- JGJ-T+141-2017通风管道技术规程
- 历年全国《宪法》知识竞赛试题库完整版及答案【历年真题】
- 基本乐理(师范教育专业)全套教学课件
- 医院检验科实验室生物安全程序文件SOP
- JJG 270-2008血压计和血压表
- 《解剖学基础》课件-上肢骨及其连接
- 轻质燃料油安全技术说明书样本
- 小米全屋智能方案
- 杏仁粉营养分析报告
- 《多边形的面积》大单元教学设计
评论
0/150
提交评论