版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1 IEC 60884-1 Plugs and socket-outlets for household and similar purposesPart 1 General requirements 刘伟石Stone May,2021 交流 :1347262647.2 StandardsIEC 60884 Plugs and socket-outlets for household and similar purposesIEC 60320 Appliance couplers for household and similar purposesIEC 60083 Plugs and soc
2、ket-outlets for domestic(家庭的)standardized in member countries of IECUL 498 Attachment Plugs and ReceptaclesUL 817 Cord Sets and Power-Supply CordsNEMA WD6 Wiring Devices- Dimensional SpecificationsUL 1681 Wiring Device Configuration.3 1. ScopeIEC 60884-1 applies to plugs and fixed or portable socket
3、-outlets, a.c. only,with or without earthing contact.50 V rated voltage 440 V ; rated current 16 A: 3+0.5s.插座要用实验插头来实验,该实验插头的插销应由黄铜制成,而且应该具有最大的规定尺寸,公差为-0.06mm,而且插销湖插销之间的间距为标称间隔,公差为+0.05mm。During test sustained arcing is not allowed! 实验期间,不得出现继续的闪弧 .After the test the product may not be damaged 实验之后样
4、品不能有影响平安的,正常运用的损坏.38 21. Normal operation5000 times(10000 strokes) with; rated voltage;current as specified in table 20; rated current 16 A: alternate current实验期间,不得出现继续的闪弧。 实验之后,样品不得出现以下情况: 减弱未来运用的磨损; 罩壳、绝缘衬垫或隔层的劣化; 影响插销正常运用的插孔的损坏; 电气或机械衔接的松脱; 密封胶的泄露。.39 22. Force necessary to withdraw plugTable 16
5、.40 22. Force necessary to withdraw plugFrench national deviation:The earthing tube is tested before and after Normal operation test with a withdrawal force gauge (C2)SequenceWithdrawal force check; single pin gauge (4,6 mm) 400 gramsNormal operation test 5000 xWithdrawal force check; single pin gau
6、ge (4,6 mm) 200 grams This requirement also apply to the earthing hole of 16A plug .41Follow the sequence 19, 20, 21 and 22 are ONE test sequence! 19 20 21 22If one fails ALL need to be re-tested.42 23. Flexible cables and their connection23.2.Retention of the cable (3 PCS new specimens) Pull test 1
7、00times 50100N .43 23. Flexible cables and their connection23.2.Retention of the cable Torque(扭矩) test 1min. Torque : .44 23. Flexible cables and their connectioncable shall not have been displaced by more than 2 mm; there shall be no break in the electrical connections .45 23. Flexible cables and t
8、heir connection23.4.Flexing test(3 PCS new specimens) Force: 0.75mm2 with 10N; 0.75mm2 with 20N; Current:0.75mm2 with 2.5A; = 0.75mm2 with 10A; 0.75mm2 with 16A; Angle : 90 (45 on either side of the vertical); The number of flexings 10000 and the rate 60/min. NOTE :A flexing is one movement, either
9、backwards or forwards. Member after 5 000 flexings; specimens are turned through 90During the flexing test, there shall be no interruption(中断)of the current, no short circuit between conductors. twice the test current= short circuit .46 23. Flexible cables and their connection将Table 21中规定的实验电流经过每个触头
10、和相应导线时,它们之间的压降不得超越10mV.实验后,如有护套,不得与本体分别,软线的绝缘不得出现磨损景象;导线的断线丝不得刺穿绝缘并使其可触及.47 24. Mechanical strengthProducts must have enough mechanical strengthTested with mechanical tests like:Free fallImpact testPressure testAbrasion test shutter testVerify (检验) the fixation of pins.48 24.2 Free fallIEC 60068-2-3
11、2Cable length:100mm.weight100g:1000 falls 100g200g:100 fallsRate of barrel:5r/min每次,只需一个样品在滚筒中进展实验。实验后,样品不得出现本规范意义内的损坏,特别是: 无任何零件松脱; 插销不得变形至无法插入符合相关规范单的插座和不符合9.1和10.3的要求; 领先朝一个方向,再朝相反方向施加一个0.4Nm的力矩1min时,插销不得转动。 .49 24.4 Impact test at low temperature-152;16H; 10002g fall from 100mm the specimen shal
12、l no damage.50 24.5 compression test232;300N- 1 min in position A.- 1 min. in position B.the specimen shall no damage after 15 min.51 24.7 Abrasion testWith force 4N The length of the pin abraded is 9 mm Movements is 20 000 (10 000 in each direction)30 movements per minute.Shall not have punctured(磨
13、穿) or rucked up(变皱). .52 24.8 shutter testA force of 40 N 1 min 75N if prevent single pole insertionThe pin shall not come in contact with live parts.53 24.10 Verify the fixation of pins(3 PCS new specimens) Force in table16 1 min after 702;1Hno pin displaced more than 1 mm.54 25. Resistance to heat
14、Accessories shall be resistant to heat.Compliance is checked as follows:Heating testBall-pressure test Compression test25.1Heating test:100 2C,1HNo change that impairing(减弱)their further useNo access(接近)to live parts, even if the probe B(IEC 61032) is applied with a force not exceeding 5 N. .55 25.
15、Resistance to heat25.2(3) Ball-pressure test:- 70 2C or 402 plus temperature rise for body- 125 2C for insulating parts to retain live parts and earthing circuit in position After 1H, immersed specimen within cold water 10 s, then cooling down to room temperature.The diameter of the impression (压痕)s
16、hall not exceed 2 mm.56 25. Resistance to heat25.4 Compression test802 ; 20N ;1Hthe specimen shall no damage.57 26. Screws, current-carrying parts and connectionsElectrical and mechanical connections shall withstand mechanical stressesContact-pressure may not go through insulating materialScrews for
17、 mechanical as well as electrical connections locked against loosening/turning.58 27. Creepage distances, clearances and distances through sealing compoundCreepage distances爬电间隔 = distance across materialClearance distances空间间隔 = distance through air.59 28 Resistance of insulating material to abnorm
18、al heat, to fire and to tracking 28 .1.1Glow wire test (IEC 60695-2-10/11):650 C; insulating materials that do not maintain or retain current carrying-parts, all products 750 C; insulating materials that do maintain or retain current carrying parts; portable products 850 C; insulating materials that
19、 do maintain or retain current carrying parts; fixed productsNo visible flame and no sustained(继续的)glowingFlames and glowing extinguish (熄灭) within 30 s .60 28 Resistance of insulating material to abnormal heat, to fire and to tracking 28.2 Resistance to tracking (IEC 60112):Only for IP code higher
20、than IPX0 Tracking test on insulating parts that hold live parts in positionSolution(溶液)A of proof-tracking index(耐痕指数)of 175 with 50 drops (on a flat surface, if possible at least 1515mm)No flashover(闪烁) or breakdown(击穿) between electrodes(电极) .61 29 Resistance to rustingAll metal parts as part of
21、the product should be adequately protected against rusting.Tested by: 10 min. grease (油脂) removing 10 min. inside 10 % ammonium chloride in water(氯化铵溶液) 10 min. inside a humidity cabinet (100%) 10 min. inside a oven of 100Ctheir surfaces shall show no signs of rust. .62 30 Additional tests on pins p
22、rovided with insulating sleevesTest for insulating sleeves Pressure test at high temperature Static(静态的) damp(湿气) heat test Test at low temperature Impact test at low temperature After the tests the insulating sleeve may have no cracks.63 30.1 Pressure test at high temperature 2.5N, 2005,2H10s in cold water.The impression(压痕)shall be not less than 50 % .64 30.2 Static damp heat test T
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 项目经理团队建设与团队管理指南
- 新增采购需求评估确认联系函(8篇)范文
- 遵纪守法好儿童小学主题班会课件
- 2026年客户定制化服务需求确认函4篇范文
- 关于启动跨部门合作项目的联系函(6篇)
- 关于2026年应收账款对账单发送的催办函(6篇)
- 环保工程师项目执行及环境影响评估KPI考核表
- 教育信息化设施设备维护手册
- 工程质量控制与检测技术操作手册
- 工程项目进度汇报与质量控制讨论7篇
- 2026中国速冻食品家庭消费场景拓展分析
- 2026年湖北地理生物会考考试真题及答案
- 消化科肠脑轴调控管理
- 电缆探测施工方案(3篇)
- 臭氧催化氧化技术
- 2026 年离婚协议书官方模板
- 年产5万公里特种线缆电子加速器辐照加工新建项目可行性研究报告模板-备案审批
- 2025企业日常业务法律风险全景防范指南
- 肩周炎推拿治疗课件
- 透析患者血钾健康宣教
- 雨课堂学堂在线学堂云《大学英语听力进阶(西北工大 )》单元测试考核答案
评论
0/150
提交评论