1、Project Management PlanVersion Note: The following template is provided for use in Xavor projects. Text enclosed in square brackets and displayed in blue italics (style=InfoBlue) is included to provide guidance to the author and should be deleted before publishing the document.Revision HistoryFor ev
2、ery revision of this document, provide the revision history that should include the date of revision, version number, description of the changes in the document, and author of the document for that particular version.DateVersionDescriptionAuthorDistribution ListState the persons/teams/groups to whom
3、 this document should be distributed whenever the document is revised. Also state the name of their parent organization.Document RecipientOrganizationTable of Contents TOC o 1-3 1.Introduction Project Management PlanIntroductionThe introduction of the Project Management Plan should provide an overvi
4、ew of the entire document. It should include the purpose, scope, definitions, acronyms, abbreviations, references and overview of this Project Management Plan.PurposeSpecify the purpose of this Project Management Plan.ScopeA brief description of the scope of this Project Management Plan; what Projec
5、t(s) it is associated with, and anything else that is affected or influenced by this document.Definitions, Acronyms and AbbreviationsThis subsection should provide the definitions of all terms, acronyms, and abbreviations required to interpret properly the Project Management Plan. This information m
6、ay be provided by reference to the project Glossary.ReferencesThis subsection should provide a complete list of all documents referenced elsewhere in the Project Management Plan. Each document should be identified by title, report number (if applicable), date, and publishing organization. Specify th
7、e sources from which the references can be obtained. This information may be provided by reference to an appendix or to another document. For the Project Management Plan, the list of referenced artifacts may include: Risk Management Plan User Interfaces Guidelines Configuration Management Plan Softw
8、are Quality Assurance Plan, etc.Document TitlePublishing OrganizationOverviewThis subsection should describe what the rest of the Project Management Plan contains and explain how the document is organized.Project OverviewProject Name, Code and LeaderSpecify the project name, project code and project
9、 leader (project manager).Project Name: Project Code: Project Leader: Project Purpose, Scope and ObjectivesA brief description of the purpose and objectives of this project, and a brief description of what deliverables the project is expected to deliver.Assumptions and ConstraintsA list of assumptio
10、ns that this plan is based on, and any constraints (e.g. budget, staff, equipment, schedule, etc.) that apply to the project. Make a distinction between critical and non-critical factors.Critical Assumptions and ConstraintsState the critical assumptions and constraints affecting the project.Non-Crit
11、ical Assumptions and ConstraintsState the non-critical assumptions and constraints affecting the project.Project MilestonesTabular list of major milestones to be achieved during the project, with target dates.MilestoneTarget Achievement DateProject DeliverablesTabular list of the artifacts to be cre
12、ated during the project, with target delivery dates.DeliverablesTarget Delivery DateTailoring GuidelinesSpecify the tailoring guidelines for the project.Software Development Life CycleSpecify the Software Development Life Cycle that is to be followed in the project.Project OrganizationOrganizational
13、 StructureDescribe the organizational structure of the project team, including management and other review authorities. This should include identification of all project organizational units and a description of their function and responsibility. A diagram of the organizational structure should also
14、 be attached for further illustration.Examples of project organizational units are:Project Implementation CommitteeProject Steering CommitteeProject Management TeamArchitecture GroupUser Experience Design TeamRequirements TeamAnalysis and Design TeamImplementation GroupDevelopment TeamDatabase Manag
15、ement TeamTesting TeamInfrastructure TeamConfiguration Management TeamSoftware Quality Assurance Team, etc.Organizational UnitDescriptionExternal InterfacesDescribe how the project interfaces with external groups. For each external group, identify the internal/external contact names.External Organiz
16、ationExternal RoleExternal Role HolderResponsibility of External Role HolderInternal Contact Role and Person, Roles and ResponsibilitiesSpecify the roles, responsibilities and role holders within each organizational unit of the project.RoleResponsibilityRole HolderManagement ProcessWork Breakdown St
17、ructure (WBS)List the activities necessary for completing the project.Project EstimatesEstimation TechniqueSpecify the estimation method and the reason for its choice. Provide the estimated cost as well as the basis for those estimates, and the points/circumstances in the project when re-estimation
18、will occur.SizeState the size of each activity as calculated according to the estimation technique. Units of size may be in LOC, FP, etc.EffortSpecify the amount of effort required to perform each activity on the basis of the size estimation. Units may be man-hours, man-days, etc.Project ScheduleDia
19、grams/tables showing target dates for completion of iterations and phases, release points, demos, and other milestones. Critical path must be specified. Usually enclosed by reference to MS Project file.Pre-Development ScheduleThis schedule will cater for project planning, requirements, analysis and
20、design activities.Development ScheduleThis schedule will cater coding, testing and deployment activities.Project Phases, Iterations and ReleasesProject PhasesIdentify phases and major milestones with their achievement criteria.Project IterationsSpecify the number of iterations and list the objective
21、s to be accomplished for each of the iterations.ReleasesBrief descriptions of each software release, whether demo, beta, etc.Project ResourcingStaffingIdentify here the numbers and type of staff required (including and special skills or experience), scheduled by project phase or iteration. State wha
22、t resources are critical.Resource AcquisitionDescribe how you will approach finding and acquiring the staff needed for the project.TrainingList any special training project team members will require, with target dates for when this training should be completed.Project BudgetAllocation of costs again
23、st the WBS and the project phases.Project Monitoring and ControlSchedule ControlDescribes the approach to be taken to monitor progress against the planned schedule and how to take corrective action when required.Budget ControlDescribes the approach to be taken to monitor spending against the project
24、 budget and how to take corrective action when required.MeasurementsDescribe the types of measurements to be taken, their frequency, and responsible workers/entities for this purpose.Risk Management PlanEnclosed by referenceProject ClosureDescribe the activities for the orderly completion of the pro
25、ject, including staff reassignment, archiving of project materials, post-mortem debriefings and reports etc.Technical Process PlansUser Experience DesignDescribe the approach that will be adopted with details of processes, procedures, and guidelines to be followed.RequirementsDescribe the approach t
26、hat will be adopted with details of processes, procedures, and guidelines to be followed.Analysis and DesignDescribe the approach that will be adopted with details of processes, procedures, and guidelines to be followed.Development PlanEnclosed by referencePeer Review PlanSpecify the work products t
27、o be peer reviewed, type of peer review, their frequency, etc.MaintenanceDescribe details of any software maintenance for the warranty period of the project.Test Plan Enclosed by referenceTools, Techniques and StandardsToolsProject Management ToolsSpecify the project management tools that are to be
28、used in the project and the reasons for their selection. Examples of areas to be covered are project planning, project scheduling, project monitoring, status reporting, measurements, etc. Examples of these tools are MS Project, etc.Requirements Management ToolsSpecify the requirements management too
29、ls that are to be used in the project and the reasons for their selection. Examples of areas to be covered are requirements gathering, requirement issue resolution, requirement change management, measurements, etc. Examples of these tools are Rational Requisite Pro, EINS, etc.System Analysis & Desig
30、n ToolsSpecify the system analysis and design tools that are to be used in the project and the reasons for their selection. Examples of tools in this area are Visio, Rational Rose, Power Designer etc.LanguagesSpecify the languages that are to be used for software development in the project and the r
31、easons for their selection. Examples of languages are HTML, Java, etc.User-Interface Development ToolsSpecify the tools that are to be used for UI development in the project and the reasons for their selection. Examples of these tools can be Dreamweaver, Flash, etc.Database Management System Softwar
32、eSpecify the database management system software that is to be used in the project and the reasons for their selection. Examples of these tools are Oracle, SQL Server, etc.Third Party SoftwareSpecify any third party software that is to be used in the project and the reasons for their selection. Exam
33、ples are Inktomi, Infranet, etc.Software Testing ToolsSpecify the software testing tools that are to be used in the project and the reasons for their selection. Examples of these tools are WinRunner, LoadRunner, etc.Defect and Change Management ToolsSpecify the defect and change management tools tha
34、t are to be used in the project and the reasons for their selection. Examples of these tools are ClearQuest, etc.Configuration Management ToolsSpecify the configuration management tools that are to be used in the project and the reasons for their selection. Examples of these tools are ClearCase, etc
35、.Integrated Development EnvironmentSpecify the operating systems (platforms), web servers, application servers, development servers that are to be used in the project and the reasons for their selection. Examples of these tools are Sun Solaris, iPlanet, JBuilder, WebSphere, etc.Techniques and Standa
36、rdsLists the documented project technical standards etc by reference. Examples may be:User-Interface GuidelinesProgramming GuidelinesTest Guidelines, etc.InfrastructureSpecify hardware, network connectivity, bandwidth, etc., required in this project. Make a clear distinction about what factors are critical.FacilitiesDescribe the facilities required for the execution of the pro
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2026月考试卷八年级数学上学期期中模拟卷(人教版)(解析版)
- 杨慎《升庵词》讲解
- DB51∕3354-2026 四川省污水铊污染物排放标准
- 2026年科技馆展教活动方案设计
- 2026年生产销售兽药罪立案标准
- 2026年小学语文情境教学模式
- 2026年化工厂化验室安全隐患及措施
- 2026年财务智能化解决方案
- 2026年保卫部工作计划与目标
- 2026年语文小班化教学模式设计方案
- 2026陕西榆林能源集团有限公司社会招聘应往届高校毕业生225人备考题库附答案详解
- 请结合马克思主义基本原理中有关科学社会主义的重要阐述理论联系实际谈一谈你对科学社会主义基本原则的认识(二)
- 食品安全体系FSSC22000-V6版标准要求及内审员培训教材
- 2026年中考考前预测卷数学(云南)(含答案)
- 2026届山东省青岛市高三5月三模历史试题(含答案)
- AI赋能下北师大版小学数学四年级上册《确定位置》教学设计反思
- 输变电工程多维立体参考价(2025年版)
- 英语四级翻译讲解课件
- 99S203 消防水泵接合器安装图集
- GB∕T 23505-2017 石油天然气工业 钻机和修井机
- 钢结构连廊施工方案
评论
0/150
提交评论