




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
DB63/T
2060—2022 前言
................................................................................
II1
范围
..............................................................................
12
规范性引用文件
....................................................................
13
术语和定义
........................................................................
14
计算原则
..........................................................................
25
维修养护等级划分
..................................................................
26
维修养护项目构成
..................................................................
47
维修养护计算基准
.................................................................
128
维修养护定额
.....................................................................
149
管护人员标准
.....................................................................
28附录
水库工程维修养护经费计算案例...................................
29附录
堤防工程维修养护经费计算案例...................................
35附录
灌区工程维修养护经费计算案例...................................
38参考文献
............................................................................
47DB63/T
2060—20221范围维修养护项目构成、维修养护计算基准、维修养护定额、管护人员标准等内容。照执行。本文件不适用于新建、改建和扩建工程。2 规范性引用文件文件。GB
50286-2013堤防工程设计规范GB
50288-2018 灌溉与排水工程设计标准SL
252-2017 水利水电工程等级划分及洪水标准SL
551-2012 土石坝安全监测技术规范SL
595-2013 堤防工程养护修理规程SL/T
246-2019 灌溉与排水工程技术管理规程3 术语和定义下列术语和定义适用于本文件。3.1管护为加强工程管理,保证工程安全运行,充分发挥工程效益所采取的必要措施。3.2维修养护功能的工作。[来源:SL
570-2013,3.4.1.1]3.3水库小(1)型小(2)型小(2)型3
V(亿
V≥11>V≥0.10.1>V≥0.010.01>V≥0.0010.01>V≥0.001
H(m)40<H≤6025<H≤4015<H≤25H≤15DB63/T
2060—2022或在有隔水条件的地下透水层修建截水墙而形成的地下蓄水场所。[来源:SL
570-2013,5.1.1.1]3.4堤防沿河、渠、湖、海岸或分洪区、蓄洪区、围垦区边缘修建的挡水建筑物。又称“堤”。[来源:SL
570-2013,4.1.1.1]3.5堤防工程堤防及其堤岸防护工程、交叉联接建筑物和管理设施等的统称。[来源:SL
570-2013,4.1.1.2]3.6灌区工程为满足灌溉排水及城市供水的需要而修建工程的。[改写:水办〔2004〕307号]4 计算原则4.1 本文件使用时,首先按照工程类型、维修养护等级和工程实际情况确定基本维修养护项目和调整项目有多个调整系数时,系数连乘,作为该项目综合调整系数。4.2 本文件的水利工程使用年限指主体工程完工验收后的年限。4.3 本文件调整维修养护项目涉及的材料、设备、服务参照市场指导价或相关规定执行。5 维修养护等级划分5.1 水库工程维修养护等级划分
1
表
1
SL
252-2017
中表
定执行。表1 水库工程维修养护等级划分表5.2表1 水库工程维修养护等级划分表1级2级3级4级5级
T≥100100>T≥5050>T≥3030>T≥20T<203
Q≥300300>Q≥100100>Q≥2020>Q≥1515>Q≥1010>Q≥55>Q≥33>Q≥13
V(万
10>V≥55>V≥0.05V<0.053
2200>V≥17001700>V≥12001200>V≥700700>V≥200V<200DB63/T
2060—2022堤防工程维修养护等级按照堤防工程等级划分为五级,具体划分标准按表2执行。其中,堤防工程等级按照GB
表2 堤防工程维修养护等级划分表5.3表2 堤防工程维修养护等级划分表5.3.1 灌区工程主要包括渠首工程(水库工程、溢流坝工程、涝池工程、水闸工程、泵站工程、机井工程)、渠道工程和渠系建筑物工程(渡槽工程、倒虹吸工程、隧洞工程、涵洞工程)。5.3.2 渠道工程和渠系建筑物工程维修养护等级按照渠首设计过水流量划分为八级,具体划分标准按表
3
³/s
1
GB
中表
的规定执行。表3渠道工程和渠系建筑物工程维修养护等级划分表5.3.3溢流坝工程维修养护等级按照溢流坝工程坝体体积划分为五级,具体划分标准按表
4表3渠道工程和渠系建筑物工程维修养护等级划分表表4 溢流坝工程维修养护等级划分表5.3.4 涝池工程维修养护等级按照涝池工程总库容划分为三级,具体划分标准按表
5表4 溢流坝工程维修养护等级划分表表5 涝池工程维修养护等级划分表5.3.5 水闸工程维修养护等级按照过闸流量和孔口面积划分为八级,具体划分标准按表
6表5 涝池工程维修养护等级划分表核过闸流量大小划分,无校核过闸流量以设计过闸流量为准。表6 表6 水闸工程维修养护等级划分表1.11.1.11.1.21.21.31.3.11.3.21.41.5过闸流量3Q(m
Q≥1000010000>Q≥50005000>Q≥30003000>Q≥10001000>Q≥500500>Q≥100100>Q≥10Q<102A(m
A≥20002000>A≥8001100>A≥600900>A≥400400>A≥200200>A≥5050>A≥10A<10
P(kW)P≥1000010000>P≥50005000>P≥10001000>P≥100P<100
H(m)H≥100H<100表9表9水库工程基本维修养护项目(一)构成表DB63/T
2060—20225.3.6 泵站工程维修养护等级按照泵站工程装机容量划分为五级,具体划分标准按表
7
执行。表7 5.3.6 泵站工程维修养护等级按照泵站工程装机容量划分为五级,具体划分标准按表
7
执行。表7 泵站工程维修养护等级划分表表8 机井工程维修养护等级划分表6表8 机井工程维修养护等级划分表6.1 水库工程维修养护项目6.1.1 水库工程维修养护项目由下列项目清单组成。a)
基本维修养护项目(一)清单;b)
基本维修养护项目(二)清单;c)
调整维修养护项目清单。6.1.2 水库工程基本维修养护项目(一)清单按表
9
进行。1.92.12.22.33.13.24.14.24.3门体局部构件加固或更换,行走支撑装置更换,吊耳板、吊座、套绳更换,5.15.25.3传(制)动系统维修养护6.1电动机外壳、叶轮清洁维护,轴承定期清洗、换油、更换,绕组定期检测、6.2控制器、限位装置的维修养护,指示仪表及信号灯的调试与配件更换等。6.36.47.17.2
SL
551-2012
1.61.71.8DB63/T
2060—2022表
9 水库工程基本维修养护项目(一)构成表(续)6.1.3 水库工程基本维修养护项目(二)清单按表表
9 水库工程基本维修养护项目(一)构成表(续)表10 水库工程基本维修养护项目(二)构成表混凝土面板的橡胶、不锈钢、铜片止水等修补以及
SR
止水压板螺栓螺母、止水木修复、更换及挡板补焊。闸门、阀门、启闭机、机电等设备更换。4.1护栏、围墙、爬梯、扶手等安全防护装置维修养护。4.2管理区环境清洁,环境绿化美化。4.34.44.5道路路面、路基、路肩等维修养护。4.64.7水库大坝安全鉴定(含金属结构检测)。按照规范对水库变形、渗流、应力应变及温度、环境量、强震等按照规范对水库安全隐患探测分析。清理水库淤积物,恢复水库有效库容。按照有关规定,开展相关方案预案的编制、宣传、演练等。10上述项目未考虑到,但符合水库实际发生的项目和国家、省委、2.12.22.2.12.2.2通讯系统、视频监视系统、管理信息系统等信息化系统的维修养护,2.2.32.3DB63/T
2060—2022表
10水库工程基本维修养护项目(二)构成表(续)6.1.4水库工程调整维修养护项目清单按表表
10水库工程基本维修养护项目(二)构成表(续)表11水库工程调整维修养护项目构成表6.2表11水库工程调整维修养护项目构成表通讯系统、视频监视系统、管理信息系统等信息化系统的维修养护,10
SL
595-2013
111.1堤顶残缺、雨淋沟等损失土方平整修复。1.2边埂补残、拍打整平、清除杂草灌木。堤坡、踏步和通道的土方维修养护。对公示牌、里程桩、防护墩、隔离网、减速带、警示桩、界桩、标示牌、宣传牌、指示牌、交界牌等涂刷反光漆、清洗、更换等。DB63/T
2060—20226.2.1 堤防工程维修养护项目由下列项目清单组成。a)基本维修养护项目清单;b)调整维修养护项目清单。6.2.2堤防工程基本维修养护项目清单按表
12
进行。表12 堤防工程基本维修养护项目6.2.3 堤防工程调整维修养护项目清单按表
13表12 堤防工程基本维修养护项目表13 堤防工程调整维修养护项目6.3表13 堤防工程调整维修养护项目6.3.1 灌区工程维修养护项目由下列项目清单组成。a)
基本维修养护项目(一)清单;b)
基本维修养护项目(二)清单;c)
调整维修养护项目清单。6.3.2 灌区工程基本维修养护项目(一)由下列维修养护项目组成。a)
渠首工程维修养护项目:1)
水库工程维修养护项目,同
6.1
内容;1.11.1.11.1.21.1.31.1.41.1.51.21.2.11.2.21.2.2.11.2.2.21.2.31.2.3.11.2.3.21.2.41.31.3.11.3.1.11.3.1.21.3.1.2.11.3.1.2.21.3.1.31.3.1.41.3.1.51.3.1.61.3.1.71.3.1.8DB63/T
2060—20222)
溢流坝工程维修养护项目;3)
涝池工程维修养护项目;4)
水闸工程维修养护项目;5)
泵站工程维修养护项目。b)
渠道工程维修养护项目;c)
渠系建筑物工程维修养护项目:1)
渡槽工程维修养护项目;2)
倒虹吸工程维修养护项目;3)
隧洞工程维修养护项目;4)
涵洞工程维修养护项目。6.3.3 灌区工程基本维修养护项目(一)清单按表
表14 表14 灌区工程基本维修养护项目(一)1.3.2.2闸门防腐、防冻处理、检修维护和零配件更换。1.3.31.3.3.1启闭机表面的涂料保护和清洁保持。1.3.3.21.3.3.3传(制)动系统维修养护注油设施维护、机械传动装置维修养护、制动装置维修养护。1.3.41.3.4.1轴承、绕组的检测更换、清洗换油和刷漆养护。1.3.4.2操作设备、各指示仪表、信号灯等维护和更换配件。1.3.4.31.3.4.4输电线路、变压器外壳、绝缘子、油枕及冷却装置等维护。1.3.4.51.3.51.3.5.1生产管理用房修缮及生产生活辅助设施维修养护。1.3.5.2管理范围内环境清洁、绿化美化。1.3.5.3护墙、护栏的防锈、刷漆和修复。1.3.61.3.6.11.3.6.21.3.6.31.3.6.41.41.4.11.4.1.1刷漆、加润滑油和易损部件更换。1.4.1.2各种电力线路、电缆线路、照明线路等输电线路维护。1.4.1.31.4.1.4控制盘、配电盘、低压配电柜等维护。1.4.1.51.4.21.4.2.11.4.2.2拍门、启闭机和拦污栅、清污机等维护。1.4.2.3检修中拆换主要支承部件或提升部件后作负荷试验。1.4.31.4.3.1房顶渗漏及进、出水流道、水下建筑物裂缝和渗漏等处理。1.4.3.21.4.3.2.1砌石护坡、挡土墙勾缝局部脱落的修复。1.3.21.3.2.1止水出现磨损、变形、断裂、自然老化且漏水量超过规定时,及时更换。DB63/T
2060—2022表
表
14 灌区工程基本维修养护项目(一)(续)1.4.3.41.4.41.4.4.11.4.4.21.4.4.31.4.51.4.5.11.4.5.21.4.5.31.4.5.42.12.1.12.1.22.22.33.13.1.13.1.23.23.2.13.2.23.2.33.33.3.13.3.23.3.33.3.43.3.53.43.4.11.4.3.2.21.4.3.3DB63/T
2060—2022表
表
14 灌区工程基本维修养护项目(一)(续)1.11.21.32.12.23.1
SL/T
3.9
3.2通讯系统、视频监视系统、管理信息系统等信息化系统的维修养护,3.31.11.21.32.12.23.4.4止水伸缩缝出现脱落、漏水量超过规定时,及时更换。3.4.54.14.23.4.2混凝土结构发生掏空、局部塌陷等的修复。3.4.3涵洞混凝土表面裂缝和磨损、空蚀的修复。DB63/T
2060—2022表
14灌区工程基本维修养护项目(一)(续)6.3.4 灌区工程基本维修养护项目(二)清单按表表
14灌区工程基本维修养护项目(一)(续)表15 灌区工程基本维修养护项目(二)6.3.5 灌区工程调整维修养护项目清单按表
16表15 灌区工程基本维修养护项目(二)表16 表16 灌区工程调整维修养护项目根据相关规定开展安全鉴定。根据相关规定开展安全鉴定。根据相关规定开展安全鉴定。根据相关规定开展安全鉴定。9.19.2管理区环境卫生整理、绿化工程养护。9.3生产管理用房修缮及生产生活辅助设施维修养护。9.4道路、路面、路基、路肩等维修养护。1011上述项目未考虑到,但符合灌区实际发生的项目和国家、省委、省坝高(m)12345262010坝长(m)440270270120120启闭机台数(台)2.3自动监控、监测、监视设备运行维护。井口、井体、机电设备维修养护及洗井清淤。浇水、喷药、刷红黏土防护、修剪等。DB63/T
2060—2022表
16表
16灌区工程调整维修养护项目(续)7.1水库工程维修养护计算基准7.1.1 水库工程维修养护计算基准按表
17
执行。表17 水库工程计算基准表7.2表17 水库工程计算基准表7.2.1 堤防工程维修养护等级二、三、四、五的堤身高度计算基准分别为
4、3、3、2m。堤防工程维修养护计算基准按表
18
执行。表18 堤防工程计算基准表123Q(m
/s)1000075004000200075030055102A(m
24001800910525240150301060452615堤防长度(m)1000100010001000堤身高度(m)3
Q(m
/s)3002006017123
V(m
2200150010005002003
V(万
7.53.00.05DB63/T
2060—20227.3灌区工程维修养护计算基准7.3.1灌区工程中渠道工程以
长度为计算基准,渡槽工程、倒虹吸工程、隧洞工程、涵洞工程等渠系建筑物工程以
100m
长度为计算基准,溢流坝工程以坝体体积为计算基准,涝池工程以库容为计算基准,水闸工程以过闸流量、孔口面积和孔口数量为计算基准,泵站工程以装机容量为计算基准。7.3.2 渠道工程和渠系建筑物工程维修养护计算基准按表
19
执行。表19 渠道工程和渠系建筑物工程计算基准表7.3.3 溢流坝工程维修养护计算基准按表
表19 渠道工程和渠系建筑物工程计算基准表表20 溢流坝工程计算基准表7.3.4涝池工程维修养护计算基准按表
21表20 溢流坝工程计算基准表表21 涝池工程计算基准表7.3.5 水闸工程维修养护计算基准按表
22表21 涝池工程计算基准表表22 水闸工程计算基准表7.3.6 泵站工程维修养护计算基准按表
23表22 水闸工程计算基准表表23 泵站工程计算基准表13合计94813446782328950916217690220主体工程维修养护695289289559191828113980573981.1205052973676725340246201301.1.1197922956626597439584197921.1.27130170512796623381.22273675795052421025261.3214561806504806631235155011.3.1567421916215272766532031.3.2157819614883279423570122981.4302921413611107757335341.5496382166013538758127081.610993943342285421480084571.71077170255620421523421.8432001500011250300015001.99100280014001120700引水设施维修养护29793197211178960192.177473881232311912.2130199834491724822.39027600645492346廊道、竖井维修养护43609133148341550728233.11375938813087232311913.22985094335254318416321000075003000550100DB63/T
2060—20228维修养护定额8.1 水库工程维修养护定额8.1.1 水库工程基本维修养护项目(一)定额按表
表24水库工程基本维修养护项目(一)定额表单位:元/(座·年)14单位:元/(座·年)启闭机维修养护347282315211576585858585.11162877523876193819385.21470098004900252025205.3传(制)动系统维修养护84005600280014001400机电设备维修养护910005320023240462028006.133600210009800210011206.221000840042009807006.32240019600840011207006.4140004200840420280水位标尺及标志牌维修养护19500145009500600037007.160004000200015007007.21350010500750045003000监测数据整编分析112009100770056002800
2.1
3%计算2.2闸门、阀门维修养护528083520517603882288224.11080872053603182218224.21260084004200210021004.32940019600980049004900DB63/T
2060—2022表
24 水库工程基本维修养护项目(一)定额表(续)8.1.2水库工程基本维修养护项目(二)定额按表表
24 水库工程基本维修养护项目(一)定额表(续)表25 水库工程基本维修养护项目(二)定额表单位:元/(座·年)15单位:元/(座·年)
元/m38004.1元/m钢丝网护栏,200元/m3砖围墙,580元/t钢爬梯、扶手,6500不锈钢爬梯、扶手,250004.2元/m26.74.3元/kW604.4元/m2404.5元/m2泥结碎石路面,49.64
20cm)混凝土路面,135.05沥青混凝土路面,204.254.6元/工日1404.73
5km)10上述项目未考虑到,但符合水库实际发生的项目和国家、省委、省政府确定的重点任务一等维修养护等级:123m
24:1.3
1m,系数增减
1/123二等维修养护等级:45m
1m,系数增减
1/45三等维修养护等级:26m
1m,系数增减
1/26四等维修养护等级:20m
1m,系数增减
1/20五等维修养护等级:10m
1m,系数增减
1/102.2.1
2.2.2
10%计算2.2.3
10%计算2.3
DB63/T
2060—20228.1.3 水库工程调整维修养护项目定额按表
26
执行。表26 水库工程调整维修养护项目定额表8.1.4 水库工程维修养护定额调整系数按表
27表26 水库工程调整维修养护项目定额表表27 表27 水库工程维修养护定额调整系数表一等维修养护等级:3
1/3二等维修养护等级:2
1/2三等维修养护等级:1
四等维修养护等级:1
五等维修养护等级:1
0.1
0.1
0.2
0.2
24:1.3.1
0.1
0.15
0.2
0.2
24:1.2
0.25
0.2
0.13
引水设施
10
24:1.3.1
0.15
0.1一等维修养护等级:440m
24:1.3
10m,系数增减
二等维修养护等级:270m
10m,系数增减
三等维修养护等级:270m
10m,系数增减
四等维修养护等级:120m
10m,系数增减
五等维修养护等级:120m
10m,系数增减
DB63/T
2060—2022表
表
27 水库工程维修养护定额调整系数表(续)合计3059920705136989575堤顶维修养护6852319113608181.16692308913168011.21601024417堤坡土方养护12919897259814486防汛道路养护9928794259573971标志牌维修养护9006004003001319002500m25003000m,系数调增
0.0630003500m,系数调增
0.1235004000m,系数调增
0.1940004500m,系数调增
0.2545005000m,系数调增
0.3114429
0.02
0.04
0.06
0.08
24:1.5
24:1.8
0.211
24:1.4
0.1212
10
0.01DB63/T
2060—2022表
27水库工程维修养护定额调整系(续)8.1.5表
27水库工程维修养护定额调整系(续)8.2 堤防工程维修养护定额8.2.1 堤防工程基本维修养护项目定额按表
28
执行。表28 堤防工程基本维修养护项目定额表单位:元/(
km·年)8.2.2 单位:元/(
km·年)表29 堤防工程调整维修养护项目定额表18二等维修养护等级:4m28:2
1m,系数增减
0.1三等维修养护等级:3m四等维修养护等级:3m五等维修养护等级:2m
0.1
0.12
0.2
0.5
0.4
0.2
0.3
0.219002500m25003000m,系数调增
0.0630003500m,系数调增
0.1235004000m,系数调增
0.1940004500m,系数调增
0.2545005000m,系数调增
0.31
2%
2%计算10%资产的10%计算元/m3宾格网箱,221.61混凝土,822.8510元/m3干砌石,204.96宾格网箱,221.61浆砌石,339.53混凝土,822.8511上述项目未考虑到,但符合堤防实际发生的项目和国家、元/km2100元/m3宾格网箱,256.08抛石,155.19元/m3504.86元/m钢丝网护栏,200大理石护栏安装,715DB63/T
2060—2022表
29堤防工程调整维修养护项目定额表(续)8.2.3堤防工程维修养护定额调整系数按表表
29堤防工程调整维修养护项目定额表(续)表30 表30 堤防工程维修养护定额调整系数表渠首工程维修养护1.1溢流坝工程维修养护623253494195333525331.1.11539126410998246601.1.27135705354463561.1.3310127131938155111631.1.46986214973882641.1.5181181126126901.2涝池工程维修养护7001443825611.22.2210414498881.2.2.19807004201.2.2.211247494681.2.3350719749631.2.3.1271315516981.2.3.27944232651.2.48406304901.3水闸工程维修养护95226473452143406327214614897210163236278198431.3.1734376004139749263711525610930700251121.3.1.1811581156763676340584058270527051.3.1.2288842437317693114946984407328361611
0.02
0.04
0.06
0.08DB63/T
2060—20228.2.4堤防工程维修养护经费计算案例参见附录
B。8.3 灌区工程维修养护定额8.3.1 灌区工程基本维修养护项目定额(一)按表
表31灌区工程基本维修养护项目定额表(一)单位:元/(单位:元/(座·年)1.3.1.69223691734972018922576115381.3.1.7603445252288132060337775251.3.1.89009007207206005402401201.3.24261263195951746151007394461927887683130291.3.2.1240772180579104335601932608416302451422571.3.2.21853541390167028040546185351158523177721.3.317593213194973872426192200213524504624551.3.3.14093230699153728869400222745462051.3.3.287000652503770021750116007250290014501.3.3.3传(制)动系480003600020800120006400400016008001.3.417668013774882020534483200023750987652951.3.4.17200054000312001800096006000240012001.3.4.26000045000260001500080005000200010001.3.4.311200940050403720240015609608001.3.4.4318802784818780158281160010790431620951.3.4.51600150010009004004002002001.3.5343003205026450232501730013000465030501.3.5.115300130509450825063003000165010501.3.5.210000100009000900060005000150010001.3.5.3900090008000600050005000150010001.3.665789531383735725719177951254128739021.3.6.12739723959178071524111507922314062901.3.1.2.18724738153093430208811938204591.3.1.2.2201601699212384806448962880201611521.3.1.34110308317818224382742061371.3.1.41137185284927227410116325053161.3.1.5480036002080960640400320160DB63/T
2060—2022表
表
31 灌区工程基本维修养护项目定额表(一)(续)1.4.1.2197141723610814516525251.4.1.3702904371917487750045001.4.1.4618074635518542439912001.4.1.5144012607204801201.4.27785656983233571071064001.4.2.1638704649319161798046001.4.2.2706052952118145010001.4.2.369265195207812808001.4.3115373100800786362275671271.4.3.1452403654027840649620881.4.3.21033290956946492924741.4.3.2.131322759205014737461.4.3.2.2720063364896345617281.4.3.35726753025424201060521211.4.3.42534214014307264441.4.4297002520014700480032001.4.4.1108009000360018009001.4.4.21080090004800180015001.4.4.381007200630012008001.4.51055481644433218910151.4.5.168825614289718119061.3.6.22491218712116264982276815226092081.3.6.36480486730241296720396158541.3.6.47000560049004200280014007003501.4泵站工程维修养护75745357775727990584747332861.4.152397038661015877944292155441.4.1.1370719278040111216267487199DB63/T
2060—2022表
表
31灌区工程基本维修养护项目定额表(一)(续)2.1.24177340832432473211615392.27944704412651781322.32483186217071242854466渠系建筑物工程维修养护3.1渡槽工程维修养护11038791967495102381229053.1.12638175914299725783853.1.28400616053204130323425203.2倒虹吸工程维修养护13792794465905089404433503.2.135721924164710998245503.2.28820532043443500280025203.2.314007005994904202803.3隧洞工程维修养护8927405833382431185915153.3.1198132998473663.3.2372122332093143711639303.3.3395811887926123963563.3.4713356214183143933.3.533714914011584703.4涵洞工程维修养护5952270622261670133710113.4.113288665852443.4.22481148913959868376203.4.326397925284202852381.4.5.2108078043284241.4.5.31080720432126361.4.5.41512105067216849渠道工程维修养护12400964291837003532538412.19123731070355496429332432.1.1494639023792302321771704DB63/T
2060—2022表
表
31 灌区工程基本维修养护项目定额表(一)(续)1.1元/座三、四等级,1400五、六等级,550七、八等级,4001.25%
5%计算1.3元/座2002.1元/m335.542.2元/m353.313.110%
10%计算3.210%资产的10%计算3.32%
2%计算3.4.4475238143126103623.4.52259994806047水位标尺及标志牌维修养护7200540054003600180018004.112009009006003003004.26000450045003000150015001.1元/m335.541.2
5%计算1.3
1%计算DB63/T
2060—20228.3.2 灌区工程基本维修养护项目定额(二)按表
8.3.2 灌区工程基本维修养护项目定额(二)按表
单位:元/(座·年)8.3.3灌区工程调整维修养护项目定额表
单位:元/(座·年)表33 表33 灌区工程调整维修养护项目定额表2.3
5%计算元/眼一等级,6000二等级,4000元/株5.279.1元/m钢丝网护栏,200元/m3砖围墙,580元/t钢爬梯、扶手,6500不锈钢爬梯、扶手,250009.2元/m26.79.3元/m2409.4元/m2135.05
20cm)10352.75km)112.1元/座一等级,27420二等级,16452三等级,5484四等级,2742五等级,6652.2
1%计算2一等维修养护等级:2400m
31:1.3.2
2二等维修养护等级:1800m2三等维修养护等级:910m2四等维修养护等级:525m2五等维修养护等级:240m2六等维修养护等级:150mDB63/T
2060—2022表
33灌区工程调整维修养护项目定额表(续)8.3.4 灌区工程维修养护调整系数按表表
33灌区工程调整维修养护项目定额表(续)表34 表34 灌区工程维修养护调整系数表3
31:1.3.1
3二等维修养护等级:7500m
3三等维修养护等级:4000m
3四等维修养护等级:2000m
3五等维修养护等级:750m
/s3六等维修养护等级:300m
/s3七等维修养护等级:55m
3八等维修养护等级:10m
31:1.3.3
0.3
0.1
31:1.3.2
0.3
0.1
31:1.3.1
0.1
24h
31:1.3.6
8h,系数
0.23
3
31:等级八水闸3
35m
/s≤Q<10m
/s,系数
0.593
33m
0.713Q<3m
一等维修养护等级:10000kW
31:1.4
二等维修养护等级:7500kW三等维修养护等级:3000kW四等维修养护等级:550kW五等维修养护等级:100kW10
31:1.4.1.1
0.1113一等维修养护等级:300m
/s
3二等维修养护等级:200m
/s3三等维修养护等级:60m
2七等维修养护等级:30m2八等维修养护等级:10m一等维修养护等级:60
31:1.3.2
1/60二等维修养护等级:45
1/45三等维修养护等级:26
1/26四等维修养护等级:15
1/15
DB63/T
2060—2022表
表
34 153
3
3三等维修养护等级:60m
3四等维修养护等级:17m
3五等维修养护等级:12m
3六等维修养护等级:7m
/s3七等维修养护等级:4m
/s3八等维修养护等级:2m
/s16100m
10m,系数增减
17
0.2
0.3183
31:3.2
3
3三等维修养护等级:60m
3四等维修养护等级:17m
3五等维修养护等级:12m
3六等维修养护等级:7m
/s3七等维修养护等级:4m
/s3八等维修养护等级:2m
/s19100m
31:3.2
10m,系数增减
20
31:3.2
0.2
0.3213
3
3三等维修养护等级:60m
3四等维修养护等级:17m
3五等维修养护等级:12m
3六等维修养护等级:7m
/s3七等维修养护等级:4m
/s3八等维修养护等级:2m
/s3八等维修养护等级:2m
/s22100m
10m,系数增减
3四等维修养护等级:17m
3五等维修养护等级:12m
3六等维修养护等级:7m
/s3七等维修养护等级:4m
/s3八等维修养护等级:2m
/s12
31:2.1.1
0.313
31:2.2
14
0.2
0.3DB63/T
2060—2022表
表
34 26
31:3.4
0.227
15
0.01,2819002500m25003000m,系数调增
0.0630003500m,系数调增
0.1235004000m,系数调增
0.1940004500m,系数调增
0.2545005000m,系数调增
0.3129
0.02
0.04
0.06
0.0823
0.20243
3
3三等维修养护等级:60m
3四等维修养护等级:17m
3五等维修养护等级:12m
3六等维修养护等级:7m
/s3七等维修养护等级:4m
/s3八等维修养护等级:2m
/s25100m
10m,系数增减
DB63/T
2060—2022表
348.3.5表
349 管护人员标准9.1 水库工程管护人员标准
7
3
于
2
人。人员工资不低于当地最低工资标准。9.2 堤防工程管护人员标准2
级堤防工程管护人员为每
20
千米
1
人;3
级堤防工程管护人员为每
千米
1
人;4
级和
5
级堤防工程管护人员为每
40
千米
1
人。人员工资不低于当地最低工资标准。9.3 灌区工程管护人员标准
15
千米
1
28DB63/T
2060—20229.4 管护人员的统筹配备管理单位兼管多个工程的,人员宜统筹配备。2945m
24:1.3
修养护;1.6
1m,系数增减
1/451(1/45)=1+(51.7-45)=1.15270m
24:1.3
修养护;1.4
养护;1.6
护;1.8
10m,系数增减
2(1/270)=1+(162-270)(1/10)(1/270)=0.96
养护;5
1/231+(2-2)
0.14
24:1.3.2
0.15
0.2
0.2
24:1.3.1
0.16
0.15
0.2
0.2
24:1.2
0.257
0.2
0.13
非注入式水库,调整系数为
8DB63/T
2060—2022附
录 A(资料性)水库工程维修养护经费计算案例A.1
闸门扇数Z=2,闸门类型为平板钢闸门,前坝坡护坡结构为干砌石,后坝坡护坡结构为干砌石,坝下防冲工程材质为干砌石,蓄水方式为非注入式,不存在廊道和竖井,混凝土防浪墙,水库于
1978
年竣工
2022
年使用年限为
19
1
等级由等级三提升至等级二。A.2 坝坡护坡结构、坝下防冲工程材质、蓄水方式、是否存在廊道或竖井、坝型、防浪墙材质、使用年限、
和表
27
调整维修养护项目的各调整系数,具体如下表所示。表A.1 某水库各调整系数计算表表A.1 某水库各调整系数计算表2
调整系数为
910
0.1510
24:1.3.2
0.1
24:1.5
24:1.8
0.211
24:1.4
0.12防浪墙为混凝土,1112
10
0.01
19
12=1+(19-10)0.01=1.091319002500m2500
3000
3500
4000
4500
14
0.02大坝所在地区属于14
0.04
0.06
0.0813X=X123W=A×X合计467823485344主体工程维修养护2895593353191.1973671080781.1.195662121314=1.021.111061851.1.21705121314=1.021.111893DB63/T
2060—2022表
A.1表
A.1某水库各调整系数计算表(续)查阅定额表
对应的调整系数,得到水库工程的基本维修养护项目(一)经费
W
基本
1=485344
元,具体如下表所示。表A.2 某水库基本维修养护项目(一)经费计算表单位:元/(座·年)31单位:元/(座·年)13X=X123W=A×X1.2757971213141.39105351.380650967081.3.11916212=0.966101213141.1210781.3.261488125101213141.23756301.4141362111213140.94132881.521660101213141.11240431.643342121213141.23533111.770251213141.1177981.81500012101213141.23184501.928001213141.113108DB63/T
2060—2022表
表
A.2某水库基本维修养护项目(一)经费计算表(续)13X=X123W=A×X引水设施维修养护297932.1774781213142.21301981213142.390278121314=1.02廊道、竖井维修养护133143.138819121314=1.023.294339121314闸门、阀门维修养护35205390784.1720534121314=1.021.1179984.2840034121314=1.021.1193244.31960034121314=1.021.1121756启闭机维修养护23152256995.177523121314=1.021.1186055.2980031213141.11108785.3传(制)动系统维修养护5600312=1.091314=1.021.116216表
表
A.2 某水库基本维修养护项目(一)经费计算表(续)33DB63/T
2060—202213X=X123W=A×X机电设备维修养护53200590526.1210001213141.11233106.28400121314=1.021.1193246.3196001213141.11217566.442001213141.114662水位标尺及标志牌维修养140001213141.1144407.2105001213141.1111655监测数据整编分析910012=1.0913=114=1.021.1110101W=B×Y10.01512.120.0322.22.2.130.132.2.240.142.2.350.152.360.026DB63/T
2060—2022表
A.2 表
A.2 某水库基本维修养护项目(一)经费计算表(续)查阅定额表
的水库使用年限、坝顶高程、大坝所在地区调整系数,得到该水库的基本维修养护项目(二)经费
W
基本
2=X12×X13×X14×(W1+W23+…),具体如下表所示。表A.3 表A.3 某水库基本维修养护项目(二)经费计算表工作(工程量)计算方法W=A元/m³80011234.1元/m钢丝网护栏,20044元/m³砖围墙,58055元/t钢爬梯、扶手,650066774.2元/m²6.7按管理区的面积计算884.3元/kW60按应急电源实有功率计算994.4元/m²4010104.5元/m²泥结碎石路面,49.64
20cm)1111混凝土路面,135.051212沥青混凝土路面,204.2513134.6元/工日14014144.715161718352.75km)2119201021DB63/T
2060—2022A.5 水库工程调整维修养护项目经费计算查阅定额表
26,各维修养护项目基准定额之和乘以表
的水库使用年限、坝顶高程、大坝所在
W
调整=X121314×(W12+W3示。表A.4 某水库调整维修养护项目经费计算表A.6表A.4 某水库调整维修养护项目经费计算表该水库工程维修养护项目总经费
W
总
基本
1+W
基本
2+W
=485344
元+W
基本
2
调整。A.7 水库工程管护人员标准该水库工程库容
V=120
万
m³,为小(1)型水库,管护人员标准不少于
3
人。35等级三,3m
1m,系数增减
10.1=1+(3.5-3)0.1=1.05
0.12
0.12
0.2
0.5
土质路面,系数调减
0.43
0.2
0.3
0.2419002500m25003000m,系数调增
0.06
3100m,530003500m,系数调增
0.1235004000m,系数调增
0.1940004500m,系数调增
0.2545005000m,系数调增
0.31
0.026
0.04
0.06
0.08DB63/T
2060—2022附
录 B(资料性)堤防工程维修养护经费计算案例B.1 现有某段堤防,堤防防洪标准为
30
年一遇,长度L=3000m,堤身高度H=3.5m,类型为浆砌石,防汛道路路面类型为土质路面,堤防(管理所)所在地区类型为四类区,海拔为
3100m。B.2 根据堤防的等级查阅表
2,确定维修养护等级为三级。根据堤防工程的堤身高度、类型、防汛道
和表
30
程的基本维修养护项目和调整维修养护项目的各调整系数,具体如下表所示。表
B.1 表
B.1 某堤防工程各调整系数计算表查阅定额表
对应的调整系数,得到堤防工程的基本维修养护项目经费
W
基本
1=23384
元/km×L/1000=70152
元,具体如下表所示。36(元/km)123X=X123W=A合计2070523384堤顶维修养护319137011.130894561.1635831.21024561.16118堤坡土方养护8972124561.4713189防汛道路养护7942134560.735798标志牌维修养护6004561.16696工作(工程量)计算方法W=A元/km210011元/m3宾格网箱,256.0822抛石,155.1933元/m3504.8644DB63/T
2060—2022表
B.2某堤防基本维修养护项目经费计算表单位:元/(
km单位:元/(
km·年)查阅定额表
29,各维修养护项目基准定额之和乘以表
的土质类别、堤防(管理所)所在地区护项目经费
W
调整=X45×X6×(W12+W3+…),具体如下表所示。表
表
B.3 某堤防调整维修养护项目经费计算表W=A元/m钢丝网护栏,200按实有工程量计算5566大理石护栏安装,715772%
2%计算8810%资产的10%计算991011元/m3宾格网箱,221.611212混凝土,822.85131310元/m3干砌石,204.96按实有维护的体积计算1414宾格网箱,221.611515浆砌石,339.531616混凝土,822.85171711上述项目未考虑到,但符合堤防实际发生的项目和国家、省委、18DB63/T
2060—2022表
B.3 表
B.3 某堤防调整维修养护项目经费计算表(续)该堤防工程维修养护项目总经费
W
总
基本
调整
元+W
调整。B.6堤防工程管护人员标准堤防防洪标准为
30
1
30
千米
1
人的要求,可与其他工程统筹配备管护人员。382等级八,10m
1等级八,1
养护;1.3.3
23等级八,10m
3
31:1.3.3
0.34
0.1
31:1.3.2
0.35
0.1
物维修养护;1.3.2
0.16
24h
31:1.3.6
0.27C.1 现有某灌区工程,渠首设计过水流量
/s,骨干渠道长度L渠道=50km,土质渠道,渠顶为石渣路C.1 现有某灌区工程,渠首设计过水流量
/s,骨干渠道长度L渠道=50km,土质渠道,渠顶为石渣路附
录C(资料性)灌区工程维修养护经费计算案例3面,渠道混凝土衬砌,混凝土渡槽长度L渡槽=200m,混凝土倒虹吸长度L倒虹吸=200m,混凝土隧洞长度L隧洞涵洞
20
型为二类区,海拔为
C.2 根据渠首设计过水流量,通过查阅定额表
3,确定该灌区渠道工程和渠系建筑物工程的维修养护
1
座、泵站工程(等级五)1
座和机井工程(等级二)1
座。C.3 根据渠道(渠首)设计流量、渠顶路面、渠道衬砌方式、渠道形式,渡槽(渠首)设计流量、长度L渡槽及结构形式,倒虹吸(渠首)设计流量、长度L倒虹吸及结构形式,隧洞(渠首)设计流量、长度L隧洞及结构形式,涵洞(渠首)设计流量、长度L涵洞及结构形式,使用年限,灌区(管理所)所在地区
19
和表
34
以确定灌区工程基表
表
C.1 某灌区工程各调整系数计算表310m
3
10m
31:等级八水闸3
35m
/s≤Q<10m
/s,系数
0.5983
33m
0.713Q<3m
0.84等级五,100kW
910
0.110113等级六,7m
/s,7003
115)/(7-4)×7003=0.843等级七,4m
/s,5325
12
31:2.1.1
渠顶石渣路面,系数
1213
1314
钢管,系数调减
0.214其他材质,系数调减
0.3153等级六,7m
/s,5102
15/(7-4)×/5102=0.833等级七,4m
/s,3812
16100m
16×(1/10)×0.1=1+(200-100)×(1/10)×0.1=217
0.217其他管材,系数调增
0.3183等级六,7m
/s,5089
31:3.2
18/(7-4)×/5089=0.863等级七,4m
/s,4044
19100m
31:3.2
19(1/10)×0.1=1+(200-100)×(1/10)×0.1=220
31:3.2
混凝土管,系数调增
0.220其他管材,系数调增
0.3DB63/T
2060—2022表
表
C.1 某灌区工程各调整系数计算表(续)213等级六,7m
/s,2431
31:3.3
21/(7-4)×/2431=0.843等级七,4m
/s,1859
22100m
31:3.3
10m,系数
0.122(1/10)×0.1=1+(200-100)×(1/10)×0.1=223
31:3.3
0.223243等级六,7m
/s,1670
31:3.4
24/(7-4)×/1670=0.873等级七,4m
/s,1337
25100m
31:3.4
10m,系数
0.125(1/10)×0.1=1+(200-100)×(1/10)×0.1=226
31:3.4
0.22627
15
0.01
2027=1+(20-15)×0.01=1.052819002500m25003000m,系数
0.062000m,X28=130003500m,系数
0.1235004000m,系数
0.1940004500m,系数
0.2545005000m,系数
0.3129
0.0229
0.04
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 税务等级动态管理办法
- 网店美工素材管理办法
- 税务建账个体管理办法
- 企业安全生产培训政策课件
- 2025年乡村振兴战略与实践考试试卷及答案
- 2025中央一号文件考题及答案
- 统编版语文七年级上册《皇帝的新装》练习题(含答案)
- 出差报销培训课件
- 出差安全培训计划课件
- 出国留学课件
- 人工智能文献检索方法课件
- 幼儿园经营与管理课件
- 航空发动机强度与振动:Chapter 4 Vibrations of Disc and Shells (盘和壳体的振动)
- 《英语教师职业技能训练简明教程》全册配套优质教学课件
- 光伏电站组件清洗周边除草治理方案
- 高考语文复习-引号的作用 课件37张
- 农业模型PPT讲稿课件
- 国家开放大学电大专科《政治经济学》网络课机考网考形考单项选择题题库及答案
- 核质保监查员考试复习题(答案)
- Q∕GDW 10356-2020 三相智能电能表型式规范
- 电工电子技术基础教学大纲
评论
0/150
提交评论