




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
上海xxxx龙家居世博汇商业办公项目模板施工方案江苏省xxxx集团有限公司上海xxxxxxxx项目部二〇一二年七月一日目录一、工程概况··························································3二、编制依据··························································3三、各构件模板支设要素及计算书·······························41.剪力墙(框架柱)模板支设要素及计算书············42.框架梁模板支设要素及计算书···························63.现浇板模板支设要素及计算书···························9四、模板支设要求···················································111.剪力墙及框架柱模板支设要求···························122.框架梁模板支设要求·······································123.现浇板模板支设要求·······································124.模板支设的其他注意事项·································12五、模板安装检验批质量验收····································14六、模板施工的安全技术措施····································15七、模板拆除的技术要求··········································15八、模板工程应急预案·············································16九、附图·······························································201.剪力墙模板支设平面图、立面图························202.框架梁模板支设平面图、剖面图························213.现浇板模板支设平面图、剖面图························22上海xxxx龙家居世博汇商业办公项目模板支设方案一、工程概况上海xxxx龙家居世博汇商业办公项目,地处上海闵行区,浦星公路东侧,联航路北侧。该项目地下一层,地上有30栋1~3层的别墅办公楼,一栋四层裙房及其4栋12层办公楼,一栋2层的售楼处。该建筑物为框架柱结构,地下室建筑面积为85771.2㎡,。地上建筑面积为186965.20㎡,总建筑面积为272736.4㎡。根据工程图纸设计进度将本工程划分为两个施工阶段,第一个施工阶段为地下室部分,第二施工阶段为地上部分。地下室部分的工程设计概况见下表项目名称设计概况层高地下室底板面结构标高-6.30,地下室顶板结构面标高-1.20,层高为5.1m框架主次梁框架主梁的截面为600×1100次梁截面400×800地下室顶板现浇顶板200厚剪力墙高度5.1m框架柱柱网尺寸8.5m×8.5m框柱截面700×700800×8001100×10001100×1100本工程模板支设依据工程设计概况及相关规范要求,采用Φ48×3.0钢管、扣件、δ=12厚的木工板、45×90木方、Φ14螺杆,进行搭设。搭设方案共分三部分。第一部分为剪力墙模板支设(框架柱参造此搭设方案)。第二部分为框架梁模板支设。第三部分为现浇板模板支设。所用材料的力学参数模板δ=12,E=6000N/mm²,[f]=15N/㎡,[u]=1/250木方45×90,E=9500N/mm²,[f]=13N/㎡,[u]=1/250,[T]=1.3N/mm²钢管Φ48×3.0,E=21000N/mm²,[f]=205N/mm²,[u]=1/400, W=5.08cm3,I=12.19cm4。Φ14的螺杆[N]=17.8t扣件抗滑移承载力设计值Rc=8KN。二、编制依据:JGJ130-2001建筑施工扣件式钢管脚手架安全技术规范JGJ80~91建筑施工高处作业安全技术规范相关工程图纸三、各构件模板支设要素及计算书(一)、剪力墙模板支设要素及计算书(框架柱参造此做法)1.剪力墙模板支设要素(1).模板采要900×1800×12的木工板,木工板上钻Φ16的孔,孔纵横间距为450.最底层一块木工板钻Φ16孔,孔沿竖向间距为450,沿水平间距为225。(2).内楞采用45×90木方,木方间距为150。(3).外楞采用Φ48×3.0钢管(双钢管),钢管沿竖向间距为450。(4).内外侧的外楞钢管用山形卡,Φ14螺杆拉紧。2.剪力墙模板搭设计算书(按5.1m高计算)(1).模板侧压力计算FF1=0.22γtβ1β2V与F2=γcH两者取最小值γ=24KN/m3t=5.714h(T=20℃)β1=1.0β2=0.85V=2.5m/nH=5.1mF1=0.22×24×5.714×1.0×0.85×(2.5)=40.55KN/m2F2=24×5.1=122.4KN/m2因F2>F1则取F0=F1=40.55KN/m2(2)、模板的面板计算①模板侧压力计算(按三跨连续梁计算)模板受砼侧压力40.55KN/m2倾倒砼时侧压力6KN/m2则模板最终受到的侧压力为1.2×40.55+1.4×6=57.06KN/m2②模板按抗弯强度验算(计算单元取450宽,按L=150三跨连续梁计算)模板承受的线荷载q=F×0.45=57.06×0.45=25.68KN/m=25.68N/mm模板截面抵抗矩W=bh2=×45×1.2×1.2=10.8cm3模板所产生的最大弯矩Mmax=ql2=×25.68×1502=57780N.mm模板所产生的内应力σ====5.35N/mm2由于σ=5.35N/mm2<[f]=15N/mm2则模板的强度满足要求③模板的挠度验算μ=<[μ]I=bh3=×45×1.2×1.2×1.2=6.48cm4μ=0.677×=0.23mm[μ]===0.6mm由于μ=0.23mm<[μ]=0.6mm所以模板的挠度满足要求④内楞的抗弯强度验算(计算单位取150:按三跨连续梁计算,其跨度为450)内楞的荷载由模板传至q=57.06×0.15=8.56KN/mMmax=ql2==173340N.mmW=bh2=×45×(90)2=60750mm3σ===2.85N/mm2因σ=2.85N/mm2<[f]=13N/mm2则内楞的强度满足要求⑤内楞的挠度验算I=bh3=×45×(90)3=2733750mm4μ=0.677×=0.09mm[μ]===1.8mmμ=0.09mm<[μ]=1.8mm则内楞的挠度满足要求⑥外楞的强度验算(计算单位取450,跨度取450,按三跨连续梁计算)外楞的荷载由内楞传至P=8.56×0.45=3.85KN外楞的最大弯矩Mmax=0.175pl=0.175×3.85×0.45=0.303KN.mσ===67.48N/mm2因σ=67.48N/m2<[f]=205N/m2则外楞的强度满足要求⑦外楞的挠度验算μ=1.146PL3/100EI<[μ]=μ==0.16mm[μ]==1.13mm由于μ=0.16mm<[μ]=1.13mm所以外楞的挠度满足要求⑧穿墙螺杆的验算N<[N]=fA=17.8t=178KNN=57.06×0.45×0.45=11.56KN由于N=11.56KN<[N]=178KN所以穿墙螺杆的强度满足要求(二)、框架梁模板支设要素及计算书框架梁模板支设要素(1).梁邦模板、梁底模板采用900×1800×12木工板(2).梁底木楞采用45×90木方间距﹫200(3).梁底横担采用Φ48×3.0钢管,横担的间距@480(4).梁侧立杆采用Φ48×3.0钢管,此立杆的纵向间距@960(5).梁底顶撑立杆采用Φ48×3.0钢管,顶撑立杆纵向间距@960(6).梁底支撑系统:①框架柱边线外扩300设立杆(若两框架柱截面有大小,按截面较大者为标准,若按小截面框架柱为准,遇大截面框架柱时,大截面框架柱的立杆应外扩)②按两柱立杆的纵向距离布置梁侧立杆,其间距小于1.0m(按柱网尺寸8.5m,柱截面700×700,设定其立杆间距0.96m)③梁底顶杆纵向间距0.96m④梁支撑系统纵横向水平杆步距小于1.8m梁板搭设计算书(按梁600×1100断面尺寸计算)(1).荷载计算(沿木方纵向线荷载)①钢筋砼梁:q1=0.2×1.1×25=5.5KN/m②模板自重:q2=8×(0.6+1.1×2)×0.012÷0.6×0.2=0.896KN/m③振动砼时活载和施工荷载:q3=(1+2)×0.2=0.6KN/m荷载组合:q=1.2(q1+q2)+1.4×q3=1.2×(5.5+0.896)+1.4×0.6=8.52KN/m(2).木方的抗弯强度验算(按三跨连续梁计算,梁跨l0=480)Mmax=ql2=×8.52×(480)2=196300.8N.mmσ===3.23N/mm2因σ=3.23N/mm2<[f]=13.0N/mm2木方的抗弯强度满足要求(3)木方抗剪强度验算Qmax=0.6ql=0.6×8.52×480=2454NT=3Q/2bh<[T]T=3×2454/2×45×90=0.91N/mm2因T=0.91N/mm2<[T]=1.3N/mm2木方的抗剪强度满足要求(4)木方的挠度验算μ==0.677×=0.12mm[μ]===1.92mm因μ=0.12mm<[μ]=1.92mm则木方的挠度满足要求(5)梁底小横担钢管抗弯强度验算梁底小横担的荷载由木方传至P=0.45q=0.45×8.52=3.83KNMmax=0.333×3.83×0.48=0.61KN.mσ==120N/mm2<[f]=205N/mm2钢管的强度满足要求(6)梁底小横担支座反力计算RA=RC=0.833×P=0.833×3.83=3.19KNRB=2.666P=2.666×3.83=10.21KN由于中间支座的反力RB=10.21KN<[R]=8KN该支座抗滑移采用双扣件(7)梁底小横担挠度验算μ=2.508×=0.42mm[μ]==1.2mmμ=0.42mm<[μ]=1.2mm梁底小横担的挠度满足要求(8)梁底立杆稳定性验算l0=K1·K2(h+2a)=1.163×1.007×(1.8+0.2)=2.34mλ=l0/i==148据λ=148查表ψ=0.347σ==69.40N/mm2<[f]=205N/mm2立杆的稳定性满足要求(9)梁底大横杆抗弯强度验算大横杆所受荷载由小横担传至P=3.19KNMmax=0.175×3.19×0.96=0.54KN.mσ===106N/mm2<[f]=205N/mm2大横杆抗弯强度满足要求(10)梁底大横杆跨中挠度验算μ=1.18×=1.18×=1.1mm[μ]==2.4mmμ<[μ]则大横杆的挠度满足要求(11)大横杆的支座反力计算R=2.68×3.19×0.96=8.2KN由于R>[R]=8KN则大横杆采用双扣件(12)立杆的稳定性验算l0=(1.8+0.1×2)=2.0mλ=l0/i==127据λ=127查表ψ=0.451σ===42.88N/mm2λ<[f]=205N/mm2则立杆的稳定性满足要求(三)、现浇板模板支设要素及计算书1.现浇板模板支设要素(1).立杆采用Φ48×3.0钢管,纵横向间距@850(2).板底横担采用Φ48×3.0钢管,间距@850(或纵向或横向)(3).板底木方采用45×90间距@300(4).模板采用δ=12木工板(5).现浇板顶撑立杆的纵横向水平杆步距1800。2.现浇板模板支设计算书(现浇板按200厚计算)(1).荷载计算(计算单元取850)现浇板自重:q1=0.85×0.2×25=4.25KN/m施工活载:q2=0.85×(1+2)=2.55KN/m荷载组合:q=1.2q1+1.4q2=1.2×4.25+1.4×2.55=8.67KN/m(2).木模板抗弯强度验算Mmax=ql2=×8.67×(300)2=78030N.mmW=bh2=×850×(12)2=20400mm3σ===3.83N/mm2因σ=3.83N/mm2<[f]=15N/mm2则模板的强度满足要求(3).木模板挠度验算μ=<[μ]I=bh3=×850×(12)3=122400mm4μ==0.65mm[μ]===1.2因μ<[μ],则木模板的挠度满足要求(4).木方所承受荷载计算钢筋砼自重:q1=0.3×0.2×25=1.5KN/m木模板自重:q2=0.3×0.12=0.29KN/m施工活载:q3=(1+2)×0.3=0.9KN/m荷载组合:q=1.2(q1+q2)+1.4q3=1.2×(1.5+0.29)+1.4×0.9=3.41KN/m(5).木方抗弯强度验算Mmax=ql2=×3.41×(850)2=246373N.mmσ===4.06N/mm2因σ=4.06N/mm2<[f]=13N/mm2则木方的强度满足要求(6).木方的挠度验算μ=0.677=0.677×=0.46mm[μ]==3.4m由于μ<[μ],则木方的挠度满足要求(7).钢管楞的抗弯强度验算钢管荷载由木方传至P=0.85×3.41=2.90KNMmax=0.336PL=0.336×2.9×0.85=0.83KN.mσ===163.39N/mm2<[f]=205N/mm2则钢管的强度满足要求(8).钢管的挠度验算μ=2.2×=2.2×=0.15mm[μ]===2.13mμ=0.15m<[μ]=2.13m则钢管的挠度满足要求(9).钢管楞的支座反力计算R=3.63×2.9×0.85=8.9KN因R=8.9KN>[R]=8KN,则扣件采用双扣件(10).钢管支撑立杆稳定性验算l0=(1.8+0.1×2)=2.0mλ=l0/i==127据λ=127,查表ψ=0.451σ===46.54N/mm2σ=46.54N/mm2<[f]=205N/mm2则钢管支撑立杆的稳定性满足要求四、模板支设要求1.剪力墙及框架柱模板支设要求:(1).剪力墙、框柱钢筋隐蔽工程验收合格后方可进行封板。为了保证模板支设工作的顺利,模板支设前首先对剪力墙及框架柱钢筋骨架进行校正,校正时要进行临时撑拉.(2).剪力墙、框架柱模的木方间距小于等于150mm,Φ14螺杆的间距小于等于450mm,外楞采用双钢管,外楞间距小于等于450mm.(3).地下室外墙底部有先后浇筑砼墙,新、旧砼墙交界处用预埋螺杆拉紧模板并用海绵胶带封闭模板与墙体的空隙.(4).触地的剪力墙、框架柱模板检查合格后,根部要进行封闭处理.用1:2水泥砂浆封堵空隙,在适当位置增设Φ20涉水孔.(5).由于剪力墙、框架柱较高,为防止模板胀裂,要求离底部1.8m以下采用双螺帽.(6).剪力墙、框架柱模板的阳角的外楞钢管要用扣件扣紧,阴角的模板处增设木方,其木方要用外楞钢管抵紧.(7).为防止剪力墙、框架柱模板产生弯曲、扭曲变形,在其构件模板的中间部位要与排架的支撑系统固定.(8).梁板柱节点处的模板不宜太碎,并要求固定牢固,梁柱节点模板要求方正.(9).模板在砼浇筑前一天浇水湿润.(10).木方与外楞之间的空隙要用木楔顶紧。2.框架梁模板支设要求:(1).梁底模的木方间距小于200mm.(2).梁底木方搁置在钢管横楞上和附加的钢管横楞上,横冷的间距小于500mm.(3).梁底横楞搁置在大横楞上或直接与梁支撑立杆用扣件扣紧.(4).在梁底横楞的中间设置顶撑立杆.(5).梁底顶撑与梁侧支撑设置成排架系统:纵横向水平杆的步距约1.8m左右.(6).梁模支撑系统在梁侧离地20cm处,必须设置扫地杆.(7).为防止梁侧模变形,宜采用螺杆固定梁侧模,或在梁两侧模中间采用短木方,将侧模抵紧在支撑立杆上.(必须双侧顶紧)(8).梁侧支撑立杆按两端框架柱外扩300设置,并按设计的间距进行布设.(9).主次梁交接处的梁侧支撑立杆应按较大梁立杆间距设置成井架,并在其中间增加梁底顶撑,作为框架梁支撑系统的支座.(10).梁模板支设时要按设计要求进行提拱(1/1000~3/1000)3.现浇板模板支设要求(1).板底木方的间距@300.(2).木方搁置在钢管上,钢管的间距@850.(3).钢管横楞采用钢管立杆作支撑,钢管支撑立杆的间距@850.(4).钢管立杆离地200mm处设置扫地杆,纵横向水平杆的步距约1.8m左右.4.模板支设的其他注意事项:(1).工艺流程:①弹出柱外边线、梁中心线,特别是主次梁交叉处中心线→②主次梁交叉处形成井架,框架柱处形成井架→③确定立杆间距(设置扫地杆,并将立杆固定)→④按照步距先将X向水平杆与立杆进行固定,搭设过程中必须校正Y向(X向)的立杆垂直度→⑤按照步距再将Y向水平杆与立杆进行固定,搭设过程中必须校正X向立杆垂直度→⑥设置边跨、中间跨水平剪刀撑或支形撑→⑦逐步向上搭设→⑧梁底部大横杆与梁侧立杆支撑扣紧(双扣件)梁起拱→⑨设置梁底横楞钢管并与大横杆绑牢→⑩设置梁底顶撑立杆并与水平杆绑牢→eq\o\ac(○,11)设置梁底模以及支撑系统的竖向剪刀撑(现浇板支撑系统的搭设参照此方法)(每跨中间部位设置)(2).剪力墙模板支设时,应注意墙板上后浇带模板的支设,要求后浇带内的模板(网片)能抗砼冲击不漏浆不跑模.(3).要求模板接缝严密不漏浆.(4).梁柱节点处模板方正,并且固定牢固.(5).考虑方便拆模,现浇板模板搁置在梁模、柱模之上.(6).考虑模板的周转使用,后浇带模板系统及其支撑系统要有独立性.(7).竖向构件底部的侧压力大,底部1.8m以下的模板固定螺杆采用双螺帽.(8).砼浇筑时,模板提前一天浇水湿润,竖向构件模板要有泄水孔.(9).模板支撑系统的扣件要经验收后方可浇筑砼(用力矩扳手抽检扣件螺帽拧紧力矩),并清除模板内垃圾.(10).严禁振捣砼时,振动棒对钢筋或模板过振.(11).钢管的接头不允许在统一位置,应错开500mm。相邻立杆接头不应设在同步内,同步内隔根立杆的接头应错开500,各接头中心至各节点宜大于1/3步距.(12).竖向剪刀撑必须触地.(13).钢管支撑在500厚C30砼底板上,对于虚空的立杆底部应垫实.(14).模板支撑架体沿边跨每一跨(跨度为8.4m)中间设置连续的竖向(X向和Y向)斜撑,斜撑必须触地。隔跨设置水平剪力撑(扫地杆处、顶层必须设置、中间隔步设置)。(15)砼浇筑时,不宜将固定泵与支撑架体相连,应先浇砼柱和浇剪力墙,再浇梁板。六、模板施工的安全技术措施:模板工程作业高度在2m和2m以上时,应根据高空作业安全技术规范的要求进行操作和防护,在4m以上或二层及二层以上周围应设安全网和防护栏杆。支模应按规定的作业程序进行,模板未固定前不得进行下一道工序。严禁在连接件和支撑件上攀登上下,并严禁在上下统一垂直面安装、拆模板。支设高度在3m以上的柱模板,四周应设斜撑,并应设立操作平台,低于3m的可用马凳操作。支设悬挑形式的模板时,应有稳定的立足点。支设临空构筑物模板时,应搭设支架。模板上有预留洞时,应在安装后将洞盖住。混凝土板拆模后形成的临边后洞口,应按规定进行防护。操作人员上下通行时,不许攀登模板或脚手架,不许在墙顶、独立梁及其他狭窄而无防护栏的模板面上行走。模板支撑不能固定在脚手架或门窗上,避免发生倒塌或模板位移。在模板上施工时,堆物不宜过多,不宜集中一处,大模板的堆放应有防倾覆措施。(8)、拆模安全注意事项:①拆除时模板必须随拆随清理,以避免钉子扎脚或阻碍交通发生事故。②拆模时不能采取猛撬,以免模板大面积塌落砸伤施工人员。③模板拆除时严禁高空抛掷。④拆除的模板在楼层上不得集中堆放。⑤拆模时,地面上设警戒区,有专人看护。七、模板拆除的技术要求:模板拆除时构件砼强度等级满足要求(参考以下表格)现浇结构承重模板拆除时所需砼强度项次构件类型结构跨度按砼达到设计强度标准值的百分率%1板≤250>2、≤875>81002梁、板、壳≤875>81003悬臂构件≤275>2100非承重模板应在砼强度能保证构件不缺棱掉角方可拆除。承重模板拆除执行,先支后拆的原则,并按照项目部书面通知规定的时间方可拆除。已拆除模板及其支撑的砼构件,应在砼强度达到设计标准值后,才允许承受全部使用荷载,达不到标准值时,应加设临时支撑。八、模板工程的应急预案:高处坠落和物体打击事故应急救援预案一旦发生高处坠落和物体打击事故后,项目部应立即组织人员进行抢救,并电话通知公司应急反应组织机构,同时迅速呼叫医务人员前来现场进行抢救。迅速排除致命和致伤因素:如搬开压在身上的重物;清除伤病员口鼻内的泥砂、呕吐物、血块或其他异物,保持呼吸道通畅等。检查伤员的生命体征:检查伤病员呼吸、心跳、脉搏情况。如有呼吸心跳停止,应就地立刻进行心脏按摩和人工呼吸。止血:有创伤出血者,应迅速包扎止血,材料就地取材,可用加压包扎、上止血带或指压止血等。同时尽快送往医院。观察受伤人员摔伤及骨折部位,看其是否昏迷;注意摔伤及骨折部位的保护,避免不正确的抬运,使骨折错位而造成二次伤害。车辆一到立即就近送往医院。由事故调查组进行事故调查,责任分析并形成调查报告上报上级主管部门。总结经验教训,教育职工。2、触电事故应急救援预案如果发生触电事故时首先断开电源。项目部应立即组织人员进行抢救,并电话通知公司应急反应组织机构,同时迅速呼叫医务人员前来现场进行抢救。如果电源开关在较远处,则可用绝缘材料(如木条等)把触电者与电源分离。高压线路触电:马上通知供电部门停电,如一时无法通知供电部门停电则可抛掷导电体(如裸导线),让线路短路跳闸,再把触电者拖离电源。触电者脱离电源后马上进行抢救,同时通知110送往最近的医院。由事故调查组进行事故调查,责任分析并形成调查报告上报上级主管部门。总结经验教训,教育职工。3、机械伤害应急救援预案一旦发生机械伤害事故后,项目部应立即切断电源并组织人员进行抢救,并电话通知公司应急反应组织机构,同时迅速呼叫医务人员前来现场进行抢救。对伤员进行必要的处理,如止血:有创伤出血者,应迅速包扎止血,材料就地取材,可用加压包扎、上止血带或指压止血等。同时尽快送往医院。车辆一到立即就近送往医院。事故调查组进行事故调查,责任分析并形成调查报告上报上级主管部门。总结经验教训,教育职工。4、模板、脚手架坍塌一旦发生模板、脚手架坍塌事故,现场抢救组应首先进行疏散,清点人员,确定有无人员失踪、受伤。了解事发前该区域施工人员情况,作业人数,如有施工人员失踪或被压埋,立即组织有效的挖掘、移除工作。挖掘、移除应采用人工挖掘、移除,禁止采用机械挖掘、移除,防止及机械对被埋人员造成伤害。人工挖掘、移除尽量避免使用尖锐性工具。抢救挖掘、移除人员应分班组,合理按照工作面安排人力,及时换班,保障抢救挖掘、移除人员体力,保证在最短时间内将被压埋人员抢救出来。如有人员失踪、受伤,安全保卫组应立即报警。并做好救助车辆引导。在专业医疗人员到达前由现场伤员抢救组对受伤人员进行简单救助。争分夺秒抢
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- T/CPFIA 0013-2024含聚谷氨酸水溶肥料
- T/CACE 0107-2023钢铁冶金渣基无机胶凝材料
- T/CI 492-2024数字孪生灌区水量监测设施建设规程
- 2025关于客房销售合同2篇
- T/ZSESS 006.1-2023环保共性产业园建设和管理规范第1部分:总则
- 汽车车牌识别系统设计
- 电视剧职员聘用合同3篇
- 风电机组课程设计
- 幼儿呼吸观察方法与指导
- 小年的祝福语
- 王春武-农药干悬浮剂(DF)项目研究与开发
- 幼儿启蒙12电子狗机器人课件
- 《好的数学:数的故事》读书笔记模板
- 2023国家开放大学:《人文英语1》形考答案解析5-8unit
- 土溶洞处理监理实施细则
- 道路危险货物运输安全标准化手册
- 名校版初中物理“公式+考点+方法技巧”大汇编
- 医院消毒供应中心CSSD专科知识《CSSD器械消毒与干燥方式的正确选择》精美培训课件
- 杠杆(CA1340自动车床)加工工艺及夹具设计
- NB-T 10316-2019 风电场动态无功补偿装置并网性能测试规范
- GB/T 9444-2019铸钢铸铁件磁粉检测
评论
0/150
提交评论