版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
ICS27.100
F24
RecordNo.42617-2014
DL
StandardsforElectricPowerIndustryofthePeople’s
RepublicofChina
DL/T1257-2013
Drum-Screen
ReleasedonNovember28,2013ImplementedonApril1,2014
ReleasedbyNationalEnergyAdministration
DL/T1257-2013
II
DL/T1257-2013
Drum-Screen
1.Scope
Thestandardhasstipulatedtheclassification,technicalrequirement,inspectionmethods,and
inspectionrules,etc.fordrum-screens.
Thestandardappliestothedesign,manufacturingandacceptanceofdrum-screensthat
removesuspendedsolidsfromwaterbyrotatingscreen.
2.NormativeReferencesNormativecitationdocuments(缺“文件”一词
的翻译)
Thefollowingdocumentsareindispensabletothestandard.Foralldatedreferences,the
versionswithonlythedatespecifiedapplytothestandard.Forallundatedreferences,thelatest
version(includingallmodificationlists)appliestothestandard.
GB/T9439GreyIronCastings
GB/T11352CarbonSteelCastingsforGeneralEngineeringPurpose
GB/T13384GeneralSpecificationsforPackingofMechanicalandElectricalProduct
GB50205CodeforAcceptanceofConstructionQualityofSteelStructures
JB/T4385.1GeneralSpecificationsforOpenDieForgingsonHammer
JB/T8098MethodsofMeasuringandEvaluatingNoiseofPumps
3.BasicRequirementforProductClassification
3.1Classification
Drum-screenshallbeclassifiedbasedonthedesignandmethodofwaterintake,whichshall
beasfollows:
a)Lightdesignlightdesigncategory(缺“类别”一词的翻译):theextreme
designwaterleveldifferencebetweentheinsideandoutsideofdrum-screenshallnotbemorethan
1.0m.
b)Mediumdesign:theextremedesignwaterleveldifferencebetweentheinsideandoutside
ofdrum-screenshallnotbemorethan1.5m.
c)Heavydesign:theextremedesignwaterleveldifferencebetweentheinsideandoutsideof
drum-screenshallnotbemorethan2.0m.
d)Singlesidedwaterintake:watershallflowintothedrum-screenfromonesideofit.
e)Doublesidedwaterintake:watershallflowintothedrum-screenfrombothsidesofit.
f)Waterintakefrominsidethescreen:watershallflowinfrominsidethedrum-screenand
flowoutwardafterbeingfilteredthroughmeshes.
g)Waterintakefromoutsidethescreen:watershallflowinfromoutsidethedrum-screenand
flowinwardafterbeingfilteredthroughmeshes.
3.2ModelLabeling
SeeFig.1forthemodellabelingandconnotationofdrum-screen.
1
DL/T1257-2013
ScreenNominalDiameter(m)xNominalWidth(m)
Single(Double)SidedWaterIntakeorDischarge
WaterIntakefromInside(Outside)
Initialletterof“screen”inChinesePinyin
Initialletterof“drum”inChinesePinyin
Fig.1Drum-ScreenModelLabeling
3.3StructuralForm
SeeFig.2fortheschematicdiagramofstructuralformofdrum-screen(GWNSmodelas
example).
1—Rinsingsystem;2—Maintenanceplatform;3—Actuator;4—Lubricatingsystem;5—Drum
skeleton;6—Mainshaftassembly;7—Sealingdevice;8—Cathodicproductionprotection
system;9—Controldevice
Fig.2SchematicDiagramofStructuralFormofGWNSDrum-Screen
3.4BasicParameters
2
DL/T1257-2013
a)Diameter:therangeofdiameterofthecircleoutsidetheframeworkofdrum-screenis
2200mm-2800mm.
b)Width:therangeofwidthofwaterchamberofdrum-screenis800mm-7000mm.
c)Meshdiameter:thedimensionsofmesharedeterminedbasedonthesizeofsmallest
contaminanttobefilteredbythedrum-screen,andtherangeincludes0.5mmx0.5mm,1mmx
1mm,2mmx2mm,3mmx3mm,4mmx4mm,6.43mmx6.43mm,φ3mm,φ4.2mm,φ5mm,
φ6mmandφ8mm.
d)Differenceofwaterlevelbetweeninsideandoutsidethescreen(Δh).
Lowspeed:Δhshallbelessthan100mm;
Mediumspeed:Δhshallbelessthan200mmbutnotlessthan100mm;
Highspeed:Δhshallnotbemorethan200mm;
Alarm:Δhshallnotbelessthan300mm.
e)Linearspeedofscreenboard.
1)Doublespeeddrum-screen:
Lowspeed:5m/min(errorbeing±20%);
Highspeed:15m/min(errorbeing±20%).
2)Triplespeeddrum-screen:
Lowspeed:2.5m/min(errorbeing±20%)
Mediumspeed:10m/min(errorbeing±20%)
Highspeed:20m/min(errorbeing±20%)
f)Maximumallowableflowvelocitythroughthescreenis0.6m/s.
g)Rinsinghydraulicpressure:0.17MPa-0.3MPa.
Note:theparametersarerecommendedbasicparameters.Asfornon-standarddesign,user
requirementshallprevail.
4.TechnicalRequirement
4.1Thedrum-screenshallmeetthestandardandbemanufacturedaccordingtothedrawingsand
technicaldocumentsbyestablishedprocedures.
4.2TheironcastingsshallcomplywithGB/T9439.
4.3ThesteelcastingsshallcomplywithGB/T11352.
4.4TheforgingsshallcomplywithJB/T4385.1.
4.5TheweldmentsshallcomplywithGB50205.
4.6Theantisepticpainttreatmentonthedrum-screenshallcomplywiththeprovisionsonsteel
structurepaintinginGB50205.
4.7Partsofthesamespecificationshallbetotallyinterchangeable.
4.8Auto-controlofthedrum-screenisrealizedviathewaterleveldifference.Theregulardesignis
doublespeedortriplespeed:ingeneral,whenthewaterleveldifferenceislessthan100mm,it
runsinlowspeed;whenthewaterleveldifferenceisnotlessthan100mmbutlessthan200mm,it
runsinlowormediumspeed;whenthewaterleveldifferenceisnotlessthan200mm,itrunsin
highspeed;whenthewaterleveldifferencereaches300mm,thealarmgoesoff.
4.9Drum-screenwithadiameterofmorethan3mshallbedetachable.
4.10Materialsusedinseawaterorpoorwaterqualityenvironmentshallbeproperlychosenbased
onthechlorideionconcentration.Whendrum-screenmadeofcarbonsteelisused,antiseptic
3
DL/T1257-2013
paintingshallbemadeandcathodicprotectiontechnologywillbeadopted.
4.11Thedesignclassificationoflight,mediumandheavyandsafetyparametersofthemainbody
aredeterminedbasedonuser’swaterquality,workingsystemandotherrequirements.
4.12Therangeofbackwashwatervolumeforthedrum-screenisdeterminedas22m3/h~245m3/h
andtherangeofhydraulicpressure0.17MPa~0.3MPabasedonuser’swaterquality,working
systemandotherrequirements.
4.13Themotorprotectionclass,insulationclassandotherrequirementsaredeterminedbasedon
whethertheuserequipmentislaidoutindoorsoroutdoors.
4.14Alloilandwaterpipesshallbewashedcleanandkeptunblockedwithoutleakage.
4.15Thetransmissionsshallbeabletorotateflexiblyandconvenientlywithoutjammingafter
assembly.
4.16Thelengthofparalleldeviationbetweenthecenterlineofmainshaftandthehorizontalplane
shallnotbemorethan0.1mmevery1000mmafterthedrum-screenisinstalled.
4.17Thetoothcrestrunoutofbiggearringshallnotbemorethan1/4ofgearmoduleafterthe
drum-screenisinstalled.
4.18Therunoutonbothend-facesofthedrum-screenshallnotbemorethan0.0005D(D
representsthenominaldiameterofthedrum-screen).
4.19Rawmaterials,purchasedpartsandoutsourcedpartsshallbeaccompaniedbythequality
certificatesfromthemanufacturer.Asforimportedparts,certificateoforiginandinspectionreport
arealsorequired.
4.20Therunningnoiseofthedrum-screen(includingthemotor)shallnotbehigherthan85dB
(A).
5.InspectionMethods
5.1TheironcastingsshallbeinspectedaccordingtoGB/T9439.
5.2ThesteelcastingsshallbeinspectedaccordingtoGB/T11352.
5.3TheforgingsshallbeinspectedaccordingtoJB/T4385.
5.4TheweldmentsshallbeinspectedaccordingtoGB50205.
5.5Theantisepticpaintingtreatmentofdrum-screenshallbeinspectedaccordingtoGB50205.
5.6ThewaterlevelrecorderinArticle4.8ofthestandardshallbeinspectedaccordingtorelevant
standardsofthemanufacturer.
5.7Articles4.16,4.17and4.18ofthestandardhadbetterbeinspectedbytheregularmethodsfor
universalmeasuringinstruments.
5.8Thedrum-screenshallbeassembledandgothroughverticalno-loadtestbeforeleavingfactory.
Thetransmissionsystemshallcomplywiththestandard.Theradialrunoutshallbemeasured
accordingtoArticle4.17ofthestandard.TheaxialrunoutshallbemeasuredaccordingtoArticle
4.18ofthestandard.
5.9ThepurchasedpartsandoutsourcedpartsinArticle4.19ofthestandardincludingautomatic
backwashfilterandwasherpumpshallbeinspectedaccordingtorelevantstandardsofthe
manufacturer.
5.10Themainshaftsealofthedrum-screenshallgothroughtightnesstestinthefactoryandthe
leakageshallnotbemorethan0.2L/day.
5.11Therunningnoiseofthedrum-screen(includingthemotor)shallbemeasuredaccordingto
JB/T8098.
5
DL/T1257-2013
6.InspectionRules
6.1EachproductshallpasstheinspectionconductedbytheQCdepartmentofthemanufacturing
plantandbeaccompaniedbyproductqualitycertificatebeforeleavingfactory.
6.2Productsshallbeassembledinthemanufacturingplantbeforeleavingfactory.Meanwhile,one
productshallbepickedfromeachbatchforverticalno-loadtest.
6.3Productinanyofthefollowingsituationsshallgothroughtypetest:
a)Trialproduction,typeapprovalandidentificationofnewproduct;
b)Majorimprovementofstructure,processandmaterial;
c)Thequalitysupervisionauthoritymakesarequest.
7.Labeling,PackagingandTransportation
7.1Onerustproofnameplateshallbefixatedonnotablelocationofeachdrum-screen,atleast
includingthefollowingcontent:
a)Productnameandmodel;
b)Drum-screendiameterandwidth;
c)Completemachinequality;
d)Screenboardvelocity;
e)Ex-factorynumber;
f)Dateofmanufacture;
g)Nameofmanufacturingplant.
7.2TheproductpackageshallcomplywithGB/T13384.
7.3Accompanyingtechnicaldocumentsinclude:
a)Productqualitycertificate;
b)Packinglist;
c)Generaldrawing;
d)Basicdrawing;
e)Installationdrawing;
f)Installationandoperationmanual.
4
1
2
5
7
-
2
D
0
L
1
/
3
T
People’sRepublicofChina
StandardsforElectricPowerIndustry
Drum-Screen
DL/T1257-2013
*
PublishedandReleasedbyChinaElectricPowerPress
(100005,19BeijingStationWestStreet,DongchengDistrict,Beijinghttp://www.cepp.sgcc.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 高三化学教学设计:硫及其化合物转化关系的一轮复习策略
- 小学四年级英语教学设计:Unit 6 From farm to table Part C Project 跨学科实践探究
- 小学四年级心理健康教学设计:认识自我悦纳自我
- 高一地理选择性必修1第1-2单元阶段综合实践教学设计
- 小镇青年崛起:智能按摩枕下沉市场渗透率提升与价格带分析
- 第一单元考察探究-主题活动四《自主选题》教学设计-2026-2027学年内蒙古版小学综合实践活动三年级上册
- 压力性损伤指南解读
- 催促完成项目进度的通知函(5篇)
- 航空货运物流运输管理信息化指南
- 客户订单2026年交付时间确认函7篇范本
- DB21T+1237-2026行业用水定额
- 刑事案件模拟庭审剧本范本
- 电影放映员岗前理论能力考核试卷含答案
- 2026年学校禁毒工作计划学校禁毒工作实施方案(5篇)
- 化肥产品生产许可证实施细则(一)(复肥产品部分)2025
- 初中学生家庭教育指南
- 管道运输流程
- 中国昆曲课件
- 生产工厂门卫管理制度
- 公文写作教学课件下载
- 3.2 《文学作为语言艺术的独特地位》(课件)中职高二语文(高教版2023拓展上册)
评论
0/150
提交评论