02 经典课件25Adjustment Procedure for XRD-6000-岛津_第1页
02 经典课件25Adjustment Procedure for XRD-6000-岛津_第2页
02 经典课件25Adjustment Procedure for XRD-6000-岛津_第3页
02 经典课件25Adjustment Procedure for XRD-6000-岛津_第4页
02 经典课件25Adjustment Procedure for XRD-6000-岛津_第5页
已阅读5页,还剩43页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Adjustment Procedure for XRD-6000,Shimadzu Corporation Analytical & Measuring Instruments Division Surface Analysis Business Unit Sales Promotion Department June/2002,1. Turn on the XRD-6000 main unit and computer,Then Main window appears on the screen (Normally automatically opened when turn on the

2、 computer. If not opened, then double-click “XRD-6000” icon on the desktop),3. Click “Display & Setup” icon,4. Then following window is appeared.,5. Confirm that door alarm button turns “red” when door is opened. And click “close” button.,6. Then small window appears and ask to calibrate the goniome

3、ter.,7. Click “OK” button. Then goniometer goes to “zero” position automatically. Then ready for adjustment.,8. Confirm that goniometer is stopped at “zero” position.,9. Double-Click “xdbinProSv” file to start this program.,10. Then “Right Gonio System: Optical Adjustment Program (2)” window is appe

4、ared.,11. Select “Lower Range” of Adjust Button.,12. Set slits and Setting Jig on the Goniometer as stated in the window,DS=0.05mm Setting Jig RS=Nothing,13. Click “Start” button. After getting peak, then Result window is appeared.,14. Click “Upper” button. After getting peak then Result window is a

5、ppeared.,Right,Left,15. If the deference between both value are not within 5% of each, then adjust the goniometer height by turning wrench as shown in this picture.,16. Try “Lower Range” and “Upper Range” again till the difference become within 5% of each value.,17. Select “2-theta” of Adjust Button

6、.,18. Set slits and remove Setting Jig on the Goniometer as stated in the window.,DS=0.05mm RS=0.15mm,19. Click “Start” button. After getting peak then result window is appeared.,20. Just click “OK” button.,21. Click “Right Gonio Service” icon,22. Select “Theta” of Adjust Button.,23. Set slits and S

7、etting jig on the goniometer as stated in the window.,DS=0.05mm Setting jig RS=0.15mm,24. Click “Start” button. After getting peak then Result window is appeared.,25. Click “OK” Button. And calibrate the goniometer by clicking “Calibration” button.,26. Select “HV” of Adjust Button.,27. Set slits and

8、 Si standard sample on the goniometer as stated in the window.,DS=1deg Si Standard SS=1deg RS=0.3mm,28. Click “Start” button. After getting peak then Result window is appeared.,29. Click “OK” Button.,30. Select “PHA” of Adjust Button.,31. Click “Start” button. After getting peak then Result window i

9、s appeared.,32. Click “OK” Button.,Daily Adjustment for the goniometer is required just following 2 theta Adjustment. (If you changed some optional sample holder such as Rotational Sample stage, Auto Sample Changer etc, then perform “Theta Adjustment” followed from 22 to 25 as well.),Daily Adjustmen

10、t for XRD-6000,33. Select “2 theta” of Adjust Button.,34. Set slits and remove Jig on the Goniometer as stated in the window,DS=0.05mm RS=0.15mm,35. Click “Start” button. After getting peak then Result window is appeared.,Right,Left,36. If the the peak angle is not less than 0.002deg, then adjust th

11、e goniometer height by turning wrench as shown in this picture.,37. Try “2 Theta Adjustment” again till the peak angle becomes less than 0.002 deg.,Procedure for checking goniometer performance,1. Click “Right Gonio Condition” icon,2. Click “file open” button then “File open” window is appeared. And

12、 select “Kensa” file.,3. Double click “Kensa Si28443” condition.,4. Then “Standard Condition Edit” window is opened.,5. Confirm the all parameters stated in the “Test report”,6. Click “OK” button then “File & Sample Condition Edit” window is appeared.,7. Click “New” button and close this window.,8.

13、Click “Right Gonio Analysis” icon,9. Select “Kensa Si28443” condition and click “Append” button. Repeat selecting appropriate conditions.,10. After selecting all conditions then click “Start” button.,11. Then these condition file are transferred to “Right Gonio System Analysis & spool Program” window.,12. Click “Start” button.,13. Then measurement start and displayed the data on the screen,14. Click “Basic Process” icon,15.Click “XRD Data” icon.,16. Drag and drop the measured data on the “Basic Process” window.,17. Set “System Error Correc

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论