版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 , , | ,01 Dust Silo 02 Pipe Rack 03 Desalination Building 04 Gas Turbine Building 05 Water Treatment 06 Conclusion,01 Dust Silo,Dust Silo Pipe Rack Desalination Building Gas Turbine Building Water Treatment Conclusion,Dust Silo,Revision, ?,Silo ?, ,Silo ,Silo ?,Dust Silo,Dust Silo,Revision, Project
2、 Revision ,Before,After,MESH MODELING & ANALYSIS, ,midas Plant 3D Shape Model,Auto Meshed Model,Before,After, Mesh Shape Model,02 PIPE RACK,Dust Silo Pipe Rack Desalination Building Gas Turbine Building Water Treatment Conclusion,PIPE RACK, INPUT, ,Pipe Rack ,PIPE RACK, Point Point Numbering,Load Ta
3、ble Input (Data , ),Excel Data, , ,PIPE RACK, , , , , , & , ,03 Desalination Building,Dust Silo Pipe Rack Desalination Building Gas Turbine Building Water Treatment Conclusion,Desalination Building, , ,Desalination Building, , Plate , Plan ,Wheel Load (Max & Min),Crane Girder &Reaction,Crane Girder
4、Detail ,Back Girder Detail ,Back Truss Modeling & ,Step 1,Load Combination & Design & Reporting,Step 2,Step 3,Step 4,Step 5,Step 6,Desalination Building,Crane Analysis & Design,Crane Girder Design Sheet,Back Girder Design Sheet,Reaction Force , , , ,Crane Back Truss, , , ,/ & ,Crane Modeling,Auto An
5、alysis & Design,Auto Design & Reporting,Step 1,Step 2, , , ,Step 3, ,Desalination Building,Crane Analysis & Design, , ,/ & ,Crane Modeling,Auto Analysis & Design,Auto Design & Reporting,Step 1,Step 2, , , ,Step 3, ,Desalination Building,Crane Analysis & Design, , ,/ & ,Crane Modeling,Auto Analysis &
6、 Design,Auto Design & Reporting,Step 1,Step 2, , , ,Step 3, ,Desalination Building,Crane Analysis & Design, , ,/ & ,Crane Modeling,Auto Analysis & Design,Auto Design & Reporting,Step 1,Step 2, , , ,Step 3, ,Desalination Building,Crane Analysis & Design, , , ,/ & ,Crane Modeling,Auto Analysis & Desig
7、n,Auto Design & Reporting,Step 1,Step 2, , , ,Step 3, ,Desalination Building,Crane Analysis & Design, , , ,04 GAS TURBINE BUILDING,Dust Silo Pipe Rack Desalination Building Gas Turbine Building Water Treatment Conclusion,GAS TURBINE BUILDING, ,GAS TURBINE BUILDING, , , , , , , ,Design Check, ,GAS TU
8、RBINE BUILDING, , , ,SW,GAS TURBINE BUILDING,Steel Member Design Detail Report KSSC-LSD09,Steel Member Design Detail Report,midas Plant,Code ,GAS TURBINE BUILDING,RC Member Design Detail Report ACI 318-11,RC Member Design Detail Report,midas Plant,GAS TURBINE BUILDING, Code, , ,05 WATER TREATMENT,Du
9、st Silo Pipe Rack Desalination Building Gas Turbine Building Water Treatment Conclusion,WATER TREATMENT, Opening ?,Opening ,WATER TREATMENT,Opening Modeling & Drawing,Opening & Mesh Modeling,Opening ,WATER TREATMENT,Modify of Plate Result & Auto Design, Plate ,Auto Design,Plate Result, , Plate ,06 CONCLUSION,Dust Silo Pipe Rack Desalination Building Gas Turbine Building Water Treatment Conclusion,CONCLUSION,Modeling & Revisio
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 做玻璃隔断施工方案(3篇)
- 室内槽钢油漆施工方案(3篇)
- 教育会员营销方案(3篇)
- 车场坡道施工方案范本(3篇)
- 道口栅栏刷漆施工方案(3篇)
- 铁皮场地围墙施工方案(3篇)
- 电子废弃物回收利用
- 深市A股公司治理结构对投资效率的影响:基于实证分析的洞察
- 深圳SJ建筑设计公司成本控制优化研究:策略与实践
- 深入剖析LED幻影阵列效应:原理、特性与应用探索
- DB65-T 4842-2024 旅游公路工程技术规范
- DB3303T084-2025孤独症儿童康复机构建设与管理规范
- 《商业空间设计探讨》课件
- CNAS-CL08-2006 评价和报告测试结果与规定限量符合性的要求
- 《傅里叶变换详解》课件
- 健康体检中心标准化操作手册
- JTS-131-2012水运工程测量规范
- DZ∕T0312-2018 非金属矿行业绿色矿山建设规范(正式版)
- 第三章-5空间数据的内插方法
- 路基路面压实度检测-路基路面压实度检测
- 等效声级计算表
评论
0/150
提交评论