35KV高压开关柜技术协议.doc_第1页
35KV高压开关柜技术协议.doc_第2页
35KV高压开关柜技术协议.doc_第3页
35KV高压开关柜技术协议.doc_第4页
35KV高压开关柜技术协议.doc_第5页
已阅读5页,还剩17页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas

2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve

3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record

4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a

5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne

6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site

7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c

8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins

9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an

10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co

11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article

12、 46th山西兆丰铝业有限责任公司氧化铝项目二期工程35KV高压开关柜技术协议甲 方:山西兆丰铝业有限责任公司氧化铝分公司 乙 方:乐星湖开电气(湖北)有限公司 设计院:东北大学设计研究院(有限公司)二一二年三月十日 总则1、本协议提出的是最低限度的技术要求,乙方应保证所供设备符合本协议和国家标准、工业标准的优质产品。2、经甲乙双方协商最终确定的技术协议书作为本设备合同一个附件,并与合同、投标文件有相同的法律效力。3、如果本技术协议与有关的标准规范中某些要求或标准规范之间的某些要求有冲突时,应按较高的规定执行。一、项目条件1.1 项目概况本工程厂址位于阳泉市境内东北部,一期已建成400kt/a

13、氧化铝,二期在一期厂内预留地扩建700kt/a氧化铝。总计规模为年产110万吨氧化铝。1.2 项目建设条件A、气象阳泉所在地区属温带大陆性季风气候。一年中四季分明,春季少雨多风,夏季炎热,雨量集中,秋季气候凉爽,冬季严寒少雪。根据阳泉市气象站1992年2002年之间的统计资料,其主要气象要素如下:1) 气温:极端最高气温40.2,极端最低气温-16.2。年平均气温11.3。年平均气压932.5hPa。2) 湿度:全年平均相对湿度53%,旱季最干月为25%,雨季最湿月为96%。3) 降水:最大年降雨量835.7mm,最小年降雨288.5mm。平均年降水量515.8mm。2) 蒸发:年平均蒸发量1

14、931.2mm。5) 冰冻:标准冻土深度为610mm冻结期为每年的11月至次年的3月。年平均有霜期200d,年最大积雪厚度236mm。6) 风:年平均风速2.5m/s最大风速22.0m/s,主导风向NW、WNW大风日数28.3d,年静风频率39%。B、地震根据中华人民共和国国家标准中国地震动参数区划图(GB18306-2001),工厂所在地区的地震动峰值加速度为0.05g,地震动反应谱特征周期为0.25S。根据该标准附录D,相对应的地震基本烈度为7度。(见晋震字(2002)13号文)C、地形、地貌阳泉市位于东经1131911323,北纬37223805,地处山西高原中部东侧,太行山西麓的山间盆

15、地之中。属山区丘陵地区,海拔均在600m 以上,市区西高东低,大部属黄土地带,部分地区有岩石出露。根据地貌成因及其形态特征,区内可划三个地貌单元:构造剥蚀中低山区、剥蚀堆积丘陵区、侵蚀堆积河谷阶地区。厂址位于阳泉市以东5km的太湖石矿区,矿区南部为采空区和排土场,北部为未开采矿区,东侧为正在改建中的207 国道,西侧为阳泉煤业(集团)有限责任公司下属的生产场地,东南部为规划中的阳泉市开发区。D、区域地质及构造本区域位于太行山断裂的西侧,沁水拗陷的东北边缘。地层主要为下古生界奥陶系石灰岩,上古生界石岩系砂页岩、石灰岩含煤层与二迭系砂页岩,新生界第四系中更新统红土,上更新统粉土、粉质粘土。阳泉位于

16、太阳山断裂的西侧,沁水拗陷的东北边缘,属于沁水拗陷的次一级构造单元。其构造形态主要受加里东运动的影响,形成地台型波浪式开阔褶皱,阳泉盆地由此形成。二、技术参数(1)额定技术要求1、额定电压:35kV2、最高运行电压:40.5kV3、额定频率:50Hz4、额定绝缘水平:符合(GB311.1-6-83)高电压输变电设备的绝缘配合5、额定电流:1600A(2)柜体及元器件技术要求:1、KYN37-40.5型交流金属封闭式移开式开关柜技术要求1.1 防护等级:IP4X1.2 操作机构型式:弹簧操作机构1.3 工作电源电压:DC220V,加热器电源:AC220V1.4 控制电压:DC220V1.5 开关

17、柜结构: 1.5.1开关柜为组装式,有坚固的框架式结构, 并具有良好的互换性、密封性,防护等级不低于IP4X,用平整的2mm敷铝锌板覆盖框架结构,使开关柜密封性能良好。1.5.2开关柜的前门为铰链门,且在开关“试验”位置时,也能关闭,开关柜背后有可拆卸的盖板(电缆小间后盖板能单独拆卸)。1.5.3 五防功能:开关柜具备完善的机械五防功能,确保不发生误操作。1.5.4 开关柜内设照明,灯泡电压为交流220V,在开关柜带电情况下可以安全更换灯泡。1.5.5 所有操作机构和辅助开关的接线除有特殊要求外,均采用相同接线。1.5.6 开关柜有良好的通风条件,如通风设有百叶窗或其他通风口,有防小动物进入的

18、措施,并符合有关标准。开关柜允许在-25的温度下运输及储存。1.5.7 开关内所配一次设备(含接地开关),都与断路器参数相配合,各元件的动、热稳定性满足要求。开关柜中的接地母线能满足该回路动热稳定的影响。1.5.8 所有用螺栓固定的主母线和分支母线接头,对铜导体作镀银处理,保证其温升不超过标准值。在长期使用期间,从标准环境温度到额定满负荷温度,固定螺栓的初始接触压力值不降低,每个连接点不少于两个螺栓并按有关标准执行。1.5.9 供方对母线的每个接点进行接触电阻测试,达到标准: 800-1000A20 u W、3000A10 uW以保证母线接触可靠。1.5.10 母线采用绝缘母线并在醒目的位置标

19、明相别的颜色,A、B、C相分别为黄、绿、红色。柜内母排均采用热缩套管作外包加强绝缘。1.5.11 高压开关柜中各组件及其支持绝缘件的绝缘爬电比距按凝露型考虑, 1.5.12 母线支承绝缘子的吸潮性能很低,在设备使用期间,不降低机构和介质强度。开关柜母线及电缆均配备带电显示装置。1.5.13 开关柜内各小室均隔离,为防止母线发生故障时波及临柜,在母线小室柜间加装母线绝缘套管。1.5.14对由于内部故障引起的隔离室压力升高,开关柜内具有单独的压力释放通道。1.5.15 柜内采用绝缘母线,并具有防潮和阻燃性能以及足够的介电强度,其对母线容量的影响由供方考虑。1.5.16 柜内相间、对地的空气间隙不小

20、于300mm。1.5.17 开关柜具有抗凝露措施的加热器和照明灯,温湿度控制器采用山西华电银河HD-WK系列。(灯泡采用防爆型)1.5.18 开关柜的外形平整美观,开关柜颜色为: 浅驼灰 。1.5.19 开关柜按配置接线图制作,见图纸。 1.5.20高压开关柜的铭牌应包括:卖方名称和商标、型号、名称和出厂序号、使用参数、防护等级、出厂日期。高压开关柜所安装的高压电器组件均应具有耐久和清晰的名牌。1.5.21 开关柜各小车的推进、抽出应灵活方便,相同用途的开关柜小车应有互换性。开关小车为抽出式,开关柜配套提供专用服务小车便于小车推进与拉出。2、KYN37-40.5开关柜内主要元件及其它要求2.1

21、真空断路器(湖北开关厂ZN91-40.5产品)技术要求:2.1.1真空灭弧室被整体浇注在高性能环氧树脂中(采用最先进的APG工艺)。2.1.2操作机构采用弹簧操作机构,要求可靠性高,结构简单,零部件少,机械寿命30000次以上。2.1.3真空断路器为移开小车式安装。2.2电流互感器(大连二互):电流互感器应满足系统短路动热稳定要求,电流互感器布置在电缆间隔内便于维护和检修。2.3电压互感器放在单独的间隔内,并配有一次熔断器,允许检查和进入开关柜内更换一次熔断器,为防止铁磁谐振过电压,要求二次加装微机消谐装置。 2.4过电压保护装置选用安徽赛普电气公司产品技术(功能)要求: 2.4.1装置额定电

22、压为50KV; 2.4.2保护对象为电站设备; 2.4.3采用放电间隙和氧化锌电阻串联结构; 2.4.4可以分相记录过电压次数; 2.4.5体积小、安装方便。 2.5智能操控装置选用南京亚电公司产品所用为显示及操作于一体的装置技术(功能)要求:2.5.1动态模拟图:分合闸显示,预分预合闸指示,接地显示,储能显示,工作位置显示,试验位置显示等;2.5.2 带6点无线测温;2.5.3三相带电显示;2.5.4操作功能:分合闸操作,储能操作,远方/就地操作,照明操作;2.5.5通讯功能:RS485接口具备远方通讯能力。2.6控制和转换开关分别采用相同外形与手把的组合开关,相同用途的开关把手操作方向一致

23、。2.7 表计、控制、信号和保护回路连接用线为铜芯绝缘线,最小截面不小于1.5mm2,控制小母线截面不小于6mm2。电压回路导线截面不小于2.5mm2。2.8电流互感器二次绕组至端子排的铜导线最小截面不小于4mm2,所有导线牢固加紧,设备端子均有标字牌。供电流互感器用的端子排设计成短接型,电流不小于20A(500V),并具有隔离板。2.9 柜内采用具有阻燃型端子,接线可靠、方便。电流回路用试验端子。不同回路(电流、电压、控制回路),正负电源之间有空端子。留有20%的备用端子。2.10 对外引接电缆均经过端子排,每个端子排只接一根导线(多根并接时,采用可联端子),导线均选用交联聚乙烯绝缘,电压不

24、小于500V的铜绞线。2.11 除断路器自身控制回路(如跳合闸、储能等)所有辅助接点外,另提供6常开,6常闭辅助接点供外部联锁用。这些辅助接点均引至开关柜内接线端子上。辅助接点的允许载流量不小于5A。2.12开关柜内电缆室和开关室各设一只电加热器,并由温湿度控制器进行控制。电源为交流220V,从柜顶交流小母线引入。2.13 开关柜内除配置主母线外,还设置小母线(套绝缘管),小母线初定数量为 20根(具体按二次配置的需要)。小母线采用6紫铜棒,并延伸至整列开关柜长度,小母线有单独的隔离小室。2.14 电气元件的壳体按要求应可靠接地。过门接地线截面不小于6mm2,电流、电压互感器二次接地线引至端子

25、排与柜内主接地可靠联结,其接地线截面不小于4mm2。2.15 设备厂家供货时应注明外协厂家产品证明。序号名称单位招标人要求值投标人响应一开关柜共用参数3额定电压kV40.540.54额定电流A160016005温升电流A1.1Ir1.1Ir6额定工频1min耐受电压(相对地)kV95957额定雷电冲击耐受电压峰值(1.250ms)(相对地)kV1851858额定短路开断电流kA31.531.59额定短路关合电流kA808010额定短时耐受电流及持续时间kA/s31.5/431.5/411额定峰值耐受电流kA808012辅助和控制回路短时工频耐受电压kV2213局部放电试验电压kV1.140.5

26、/1.140.5/单个绝缘件pC33电压互感器、电流互感器101014供电电源控制回路VDC220DC220辅助回路VAC 220AC 22015使用寿命年202016设备尺寸单台开关柜整体尺寸(深宽高)mm2600*1400*27002600*1400*27002600*1400*2700设备的最大运输尺寸(深宽高)3800*2100*290017防护等级柜体外壳IP4XIP4X隔室间IP2XIP2X18爬电距离瓷质材料(对地)mm729729有机材料(对地)81081019相间及相对地净距(空气绝缘)mm30030020丧失运行连续性类别LSC2LSC2二断路器参数1型号2灭弧室类型真空真

27、空3额定电流A160016004主回路电阻投标人提供505温升试验电流A1.1Ir1.1Ir6额定工频1min耐受电压断口kV118118对地9595额定雷电冲击耐受电压峰值(1.250ms)断口kV215215对地1851857额定短路开断电流交流分量有效值kA31.531.5时间常数ms4545开断次数次2020首相开断系数1.51.58额定短路关合电流kA80809额定短时耐受电流及持续时间kA/s31.5/431.5/410额定峰值耐受电流kA808011开断时间ms投标人提供90 12分闸时间ms0.0757013合闸时间ms0.099014重合闸无电流间隙时间ms30030015分

28、、合闸平均速度分闸速度ms1.11.61.11.6合闸速度1.11.61.11.616分闸不同期性ms2217合闸不同期性ms2218机械稳定性次真空断路器10000真空断路器1000019额定操作顺序O0.3sCO180sCOO0.3sCO180sCO20现场开合空载变压器能力空载变压器容量MVA10/20/31.510/20/31.5空载励磁电流A0.5150.515试验电压kV40.540.5操作顺序10O和10(CO)10O和10(CO)21现场开合空载线路充电电流试验试验电流A由实际线路长度决定由实际线路长度决定试验电压kV40.540.5试验条件线路原则上不得带有泄压设备,如电抗器

29、、避雷器、电磁式电压互感器等线路原则上不得带有泄压设备,如电抗器、避雷器、电磁式电压互感器等操作顺序10(O0.3sCO)10(O0.3sCO)2223容性电流开合试验(试验室)试验电流A线路:10,电缆:50,电容器组:400线路:10,电缆:50,电容器组:400试验电压kV1.440.5/1.440.5/C1级:LC1和CC1:24O,LC2和CC2:24CO;BC1:24O ,BC2:24COC1级/C2级C1级/C2级C1级:LC1和CC1:48O,LC2和CC2:24O和24CO;BC1:24O ,BC2:80CO24操动机构型式或型号弹簧弹簧操作方式三相机械联动三相机械联动电动机

30、电压VDC220 DC220 合闸操作电源额定操作电压VDC220 操作电压允许范围85%110%,30不得动作每相线圈数量只1每只线圈涌流A投标人提供/每只线圈稳态电流ADC220 V、2.5A或DC220 V、2.5A或分闸操作电源额定操作电压VDC220、DC220、操作电压允许范围65%110%,30不得动作65%110%,30不得动作每相线圈数量只11每只线圈涌电流A投标人提供/每只线圈稳态电流ADC220V、2.5ADC220V、2.5A备用辅助触点数量对1010开断能力DC220 V、2.5ADC220 V、2.5A检修周期年1515弹簧机构储能时间s2020三隔离开关参数1型式

31、/型号-2额定电流A200020003主回路电阻投标人提供/4温升试验电流A1.1Ir1.1Ir5额定工频1min耐受电压断口kV118118对地9595额定雷电冲击耐受电压峰值(1.250ms)断口kV215215对地1851856额定短时耐受电流及持续时间kA/s31.5/431.5/47额定峰值耐受电流kA80808分、合闸时间分闸时间ms投标人提供合闸时间投标人提供9分、合闸平均速度分闸速度ms投标人提供合闸速度投标人提供10机械稳定性次3000300011操动机构型式或型号手动手动操作方式三相机械联动三相机械联动备用辅助触点数量对1010开断能力DC220 V、2.5A或DC110

32、V、5ADC220 V、2.5A或DC110 V、5A四接地开关参数1额定短时耐受电流及持续时间kA/s31.5/431.5/42额定峰值耐受电流kA80803机械稳定性次300030004操动机构型式或型号手动手动备用辅助触点数量对88开断能力DC220 V、2.5A或DC110 V、5ADC220 V、2.5A或DC110 V、5A五电流互感器参数1型式或型号干式(环氧浇注式)干式(环氧浇注式)2布置型式外置外置3绕组1额定电流比A1000-1500/1(进线、母联)800/1(出线)1000-1500/1(进线、母联)800/1(出线)额定负荷VA3030准确级0.2S0.2S绕组2额定

33、电流比A1000-1500/1(进线、母联)800/1(出线)1000-1500/1(进线、母联)800/1(出线)额定负荷VA3030准确级10P3010P30绕组3额定电流比A1000-1500/1(进线、母联)800/1(出线)1000-1500/1(进线、母联)800/1(出线)额定负荷VA3030准确级0.2S0.2S绕组4额定电流比A1000-1500/1(进线、母联)800/1(出线)1000-1500/1(进线、母联)800/1(出线)额定负荷VA3030准确级0.50.5六电压互感器及熔断器参数1型式或型号2额定电压比KV35/:0.1/:0.1/335/:0.1/:0.1/

34、33准确级0.2/0.5/6P0.2/0.5/6P4接线级别Yo/Yo/YoYo/Yo/Yo5三相不平衡度V116低压绕组1min工频耐压kV337额定电压因数1.2倍连续,1.9倍8h1.2倍连续,1.9倍8h8熔断器型式RN2-35RN2-359熔断器的额定电流A0.5A0.5A10熔断器的额定短路开断电流KA31.531.5七避雷器参数型式1额定电压kV50502持续运行电压kV40.840.83标称放电电流kA5(峰值)5(峰值)4陡波冲击电流下残压峰值(5kA,1/3s)kV1541545雷电冲击电流下残压峰值(5kA,8/20s)kV1341346操作冲击电流下残压峰值(250A,

35、30/60s)kV1141147直流1mA参考电压kV7373875直流1mA参考电压下的泄漏电流A50509工频参考电压(有效值)kV投标人提供7010工频参考电流(峰值)mA投标人提供111持续电流全电流mA投标人提供800阻性电流A投标人提供30012长持续时间冲击耐受电流A400400134/10s大冲击耐受电流kA656514动作负载投标人提供通过15工频电压耐受时间特性投标人提供通过1.0Ur,2h;0.9Ur,24h16千伏额定电压吸收能力kJ/kV投标人提供/17压力释放能力kA/s27.2/0.227.2/0.2八母线参数1材质TMYTMY2额定电流A160016003额定短

36、时耐受电流及持续时间kA/s31.5/431.5/44额定峰值耐受电流kA80805导体截面mm23TMY-80*103TMY-80*10注:开关柜内部参数配置详见图纸,严格按图纸要求生产。三、原材料、元器件明细序号名称型号规格生产厂家产地1断路器ZN91-40.5乐星湖开湖北2电流互感器LDJ18-35大连二互大连3智能操控NYD-SSD南京亚电南京4过电压保护装置TBP-B-12安徽赛普5温湿度控制器HD-WK10华电银河山西四、供货清单1一般要求1.1 本条规定了合同设备的供货范围。乙方保证提供设备为全新的、先进的、成熟的、完整的和安全可靠的,且设备的技术经济性能符合要求。1.2 乙方应

37、提供详细供货清单,清单中依次说明型号、数量、产地、生产厂家等内容。对于属于整套设备运行和施工所必需的部件,即使本合同附件未列出和/或数目不足,乙方仍须在执行合同时补足。1.3 除有特别注明外,所列数量均为一面开关柜所需。1.4 开关柜设计满足设计图纸要求,在设计施工阶段满足设计院二次图要求。1.5 在供方厂内做整体并柜试验,需方参与验收。1.6 所需二次元件也属于本次供货范围。2 供货范围(不限于此)2.1供货范围开关柜主要参数单位数量1进线开关柜KYN37-40.5面12PT避雷器柜KYN37-40.5面13变压器出线开关柜KYN37-40.5面14母联隔离柜KYN37-40.5面15分段开

38、关柜KYN37-40.5面16并柜附件铜排等3TMY-80*10米约6米2.2随机提供正常使用备品备件序号工具名称规格型号原产地数量1分合闸线圈湖北2个2.3随机提供的安装及检修专用工具序号工具名称规格型号原产地数量1储能手柄湖北1把2操作手柄湖北1把五、结构/配置情况序号结构/配置名称单位型号结构/配置情况单台设备重量135KV开关柜面KYN37-40.5金属铠装移动式开关柜/2600*1400*27001500kg/台六、交货时间及地点交货时间:中标通知书下达后30天内交货。交货地点:山西兆丰铝业氧化铝分公司工地现场。发运货前将所供设备的合同号、名称、件数、及发运日期等以传真方式通知甲方。

39、乙方应保证所供设备安全运达目的地。七、质量保证7.1、质量保证期限质保期为设备投运后一年,在质保期由于设备质量问题厂家负责三包。注:质保期满后,乙方仍免费提供技术服务,对更换部件只收成本费用,并终身保证以合理价提供易损件。7.2、准备阶段乙方负责设计联络工作,具体组织、安排设计联络会议,提出设计联络会议纲要及所要解决的问题,配合买方设计单位按时完成设计工作。7.3、制造中的质量保证7.3.1 乙方保证提供的设备是专为本合同生产的全新的、未使用过的、采用的是最佳材料和第一流的工艺,并在各个方面符合合同规定的质量、规格和性能要求。7.3.2 乙方为生产本投标产品制定生产组织技术保证措施和质量保证措

40、施,内容如下:按IS09001要求对产品从设计、原料采购、热加工、冷加工、半成品、装配、测试、售后服务每个环节进行控制。7.4、调试阶段的质量保证7.4.1乙方现场服务人员的目的是使所供设备安全、正常投运。现场服务计划见下表。如果此人日数不能满足工程需要,乙方要追加人日数,且甲方无须为此支付任何额外费用。现场服务计划表序号技术服务内容计划人/天数派出人员构成备注职称人数1开箱时,对产品外观及数量进行检验和验收。2工程师1贵方技术人员现场配合2对使用单位的技术人员,设备操作人员和维护人员进行技术培训。2工程师1免费培训,并提供资料。3设备安装期间,进行现场指导安装2工程师2免费指导安装4安装完毕

41、后,现场通电调试及指导。2工程师1供电安装设计部门需在场5设备通电运行初期,进行技术协助。2工程师1免费保驾运行6在质保期内,更改损坏的元件配件。工程师2无偿更换7超过质保期,更换损坏的元件配件。工程师2收取一定的成本7.4.2 乙方现场服务人员具有下列资格:遵守法纪,遵守现场的各项规章和制度;有较强的责任感和事业心,按时到位;了解合同设备的设计,熟悉其结构,有相同或相近的现场工作经验,能够正确地进行现场指导;身体健康,适应现场工作的条件;乙方更换甲方认为不合格的投标方现场服务人员。7.4.3 乙方现场服务人员的职责乙方现场服务人员的任务主要包括设备催交、货物的开箱检验、设备质量问题的处理、指

42、导安装和调试、参加试运和性能验收试验。在安装和调试前,乙方技术服务人员向甲方进行技术交底,讲解和示范将要进行的程序和方法。经甲方确认和签证的工序如因乙方技术服务人员指导错误而发生问题,乙方负全部责任。乙方现场服务人员有权全权处理现场出现的一切技术和商务问题。如现场发生质量问题,乙方现场人员在甲方规定的时间内处理解决。如乙方委托甲方进行处理,乙方现场服务人员出委托书并承担相应的经济责任。乙方对其现场服务人员的一切行为负全部责任。乙方现场服务人员的正常来去和更换事先与甲方协商。八、员工培训承诺8.1为使合同设备能正常安装、调试、运行、维护及检修,乙方有责任提供相应的技术培训。培训内容与工程进度相一

43、致。8.2培训计划和内容如下,甲方为乙方培训人员提供设备、场地、资料等培训条件。序号技术服务内容受培训人员及天数培训教师构成备注职称人数14人3天工程师3我方提供此期间的食宿便利。免费培训,并提供有关资料。2货到现场后,我方可对使用单位的技术人员,设备操作人员和维护人员进行现场培训技术人员4人2天工程师2九、售后服务在保修期限内如出现质量问题,乙方在接到甲方要求服务的通知后,保证在12小时内赶到设备现场,24-38小时内修复设备,乙方服务人员每2000小时或每3个月定期对用户进行回访。乙方对其所供设备终身提供维修服务和备品备件的供与。十、技术资料及交付进度必要的文本文件应以Word.doc格式

44、提供;必要的图纸文件应以AutoCAD.dwg格式提供。技术协议草签后7天内提供以下资料。1.1 供方提供的资料使用国家法定单位制,语言为中文。1.2协议草签7 天内提供全部技术资料清单和交付进度。1.3 所提供的资料内容正确、准确、一致、清晰完整、满足招标和工程需要。 1.4提供资料的进度完全按照本规范的要求,分别按投标阶段,配合工程设计阶段,设备监造检验,施工调试试运、性能验收试验和运行维护等四个方面进行。1.5对于其他没有列入合同技术资料清单,只要是工程必须的文件资料,一经发现供方将及时免费提供。2、资料内容 序号资料名称数量交付进度1A. 使用说明书10份技术协议签订后 7 天内提供B

45、. 开关柜设备排列图、外形尺寸、安装尺寸、柜底控制电缆和电力电缆开孔图。C. 开关柜整体的总重量、最大运输尺寸和重量。D. 电流互感器和电压互感器的参数及特性。E. 测量、控制、保护及信号回路原理接线图2F. 所有表计、继电器、变送器及控制保护信号的型号、规格和产品样本10份合同签订后 7 天内提供G. 开关柜的动荷和静荷载3A. 电气一次接线图10份合同签订 7 天提供B. 电气二次原理接线图C. 柜内及板后接线图D. 出厂试验报告4装箱资料及招标文件要求的其它资料10份随柜发运十一、设备监造监造内容由乙方提供,且由甲方认可。十二、其它1、甲方对现场提供的使用条件和数据负责,乙方对提供设备的

46、质量和协议中的技术参数负责。2双方按此协议执行,未尽事宜,双方协商解决。3、本技术协议自合同签订之日起生效。4、本协议一式十份,两正八副,甲方一正六副,乙方一正一副,设计院一副。regular issuance system of internal and external accident cases, organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthe

47、ning the safety of staff, establishing the concept of legalization of production safety, establish a people-oriented concept, three do no harm (dont hurt yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class

48、: succession (started), combined with shift operation and tasks for better risk analysis, arranged security account considerations. After class: summarizing comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and com

49、pletes the record. 49th: safety day event organized by the monitor, safety help, workshop leaders and checking activities. Classes (groups) or rotating a safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the

50、 company, workshop and fewer security incidents, as well as the typical illegal team, analysis of operation environment, there may be a risk factor for the main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons learned from and the weakness in safety management, accident prevention measures in the study. Meeting was chaired by enterprise security responsibility, concerning the participation of Heads of Departmen

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论