下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Control Phase 30-Jul-03,Six Sigma Green Belt,Project Description,Project Title: The coil resistance of X15-150 Green Belt: JB Zhu Department: BEL ME Champion / Manager: BH Koh / KS Park End customer: Seagate,Project Description,Problem Statement: The resistance of X15-150 coil is close to upper limi
2、t per winding result, and customer complained three times the resistance out spec. days. Goal/Objective Statement: Currently, the resistance of X15-150LP coil is close to upper limit. But, since we built small quantity samples every lot, so the readings of resistance are consistent and the Cpk is go
3、od. So I will study the mean at the first stage instead of the Cpk, the target is to make the mean of each winding match the spec. mean. For long term target, it is to make the Ppk greater than 1.5 and the resistance match the spec. mean. Other Benefits: 1. Improve the DPPM and prevent scrap. 2. Imp
4、rove the process capability and eliminate customer complain.,Team Member,NameOrganization JB ZhuME Actuator and coil - Leader/Data analysis CL YangME Actuator - Actuator ME JX GuoME Actuator - Coil Post Zhi Ping LiME Coil - Coil winding LY YangME Coil - Measurement,Update Trend Chart,Below is the la
5、test trend chart. This trend chart is based on the coils are all wound by 0.201mm wire. The target of last time is 5.814, per the baseline which is 5.863 this time, the target does not met. Per this trend chart, update the target as 5.82.,Project Timeline,PhaseDeliverablesPlan Due DateActual Complet
6、e Date DTrend Chart April 2, 2003April 04, 2003 + MFishboneMarch 31, 2003March 29, 2003 GR&RApril 01, 2003April 02, 2003 FMEAApril 08, 2003April 07, 2003 + ATrend ChartApril 30, 2003May 5, 2003 Multi-VariMay 7, 2003May 10, 2003 Hypothesis TestsMay 7, 2003May 10, 2003 ANOVAMay 8, 2003May 12, 2003 + I
7、DOE PlanJune 16, 2003June 16, 2003 DOE AnalysisJune 23, 2003June 23, 2003 Revise SettingTBD + CUpdate Trend ChartJuly 28, 2003July 28, 2003 Process Control PlansJuly 29, 2003July 29, 2003 +,Improve phase result,Recall the result from Improve Phase The KPIVs found from Improve phase are: Coil ID & Wi
8、nding Tension Revised setting 0.201mm wire with 2.5N winding tension Reconfirmation run result. Because we have no 0.200 mm wire on hand so we use 0.201mm wire, and the winding tension is 2.5N to reconfirm the setting. 5.8013-0.2270*0.201+0.119*2.5-0.0167*0.201*2.5=6.044 But the actual resistance is
9、 5.689, that suggest the equation is not adequate, there may be other noise factor which will also affect on the coil resistance.,Process Control Plan,Since number of turns is fixed factor, and the wire ID is determined per each lot wire, so the winding tension is the main KPIV will be monitored in
10、future. Current, the technician tests the winding tension every shift. For wire replacement and program adjustment, will also test the winding tension. Current does not monitor the wire ID per each spool, there is just IQC audit each lot. The technician who is responsible for the product will also r
11、esponsible for the monitoring and take action.,Control Chart,Conclusion,Per the control chart at last page, the UCL is 5.901 and the LCL is 5.826. The coil resistance are all measured at coil winding level. Because the coil leads cant be cut at the right length at coil winding level, there must rema
12、in about 20mm for each lead for coil post process convenience. So the actual resistance will be less than the measured value. Will consider to have a compensation next time when make the trend chart.,Issues / Barriers,The experiments are limited by the wire, the special ID wire must be ordered specially, so the cost will increase largely. And the lead time will be too lo
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026浙江丽水市松阳县疾病预防控制中心招聘见习大学生2人考前冲刺试卷含答案详解【达标题】
- 2026福建龙岩上杭县下都中学招聘秋季编外教师人的笔试题库(综合题)附答案详解
- 2026广东茂名市高州市公益性岗位招聘11人(第一批)模拟试卷含答案详解(轻巧夺冠)
- 2026年医师资格考试《临床医学》培训试卷多选题
- 2026陕西省西安植物园(陕西省植物研究所)联合培养博士后人才招聘2人模拟试卷附完整答案详解(名师系列)
- 2026浙江宁波东方海纳人力资源服务有限公司招聘1人笔试题库附完整答案详解【必刷】
- 2026四川安和精密电子电器股份有限公司招聘工装设计工程师的1人模拟试卷【满分必刷】附答案详解
- 2026云南昆明呈贡区公共就业和人才服务中心公益性岗招聘1人备考题库及参考答案详解(突破训练)
- 2026杭州市上城区笕桥街道办事处编外招聘3人笔试题库含完整答案详解【必刷】
- 2026江西宜春市园林事务中心招聘1人模拟试卷及完整答案详解(考点梳理)
- 2025年山东省烟台市辅警招聘公安基础知识考试题库及答案
- 拉力试验机安全操作规程及维护手册
- 《装配式公路钢桥墩》
- (正式版)DB23∕T 221-2002 《规模化养蜂技术规程》
- 选煤厂安全规程培训课件
- BSL-1生物安全实验室备案审核表
- 基于STM32的室内花卉自动浇灌系统设计
- 韩语入门考试题库及答案
- 辽宁护士注册管理办法
- 学校保安保洁及宿管服务投标方案(技术方案)
- 中医针灸学(A1题型)历年真题试卷汇编2
评论
0/150
提交评论