版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Control Phase 30-Jul-03,Six Sigma Green Belt,Project Description,Project Title: The coil resistance of X15-150 Green Belt: JB Zhu Department: BEL ME Champion / Manager: BH Koh / KS Park End customer: Seagate,Project Description,Problem Statement: The resistance of X15-150 coil is close to upper limi
2、t per winding result, and customer complained three times the resistance out spec. days. Goal/Objective Statement: Currently, the resistance of X15-150LP coil is close to upper limit. But, since we built small quantity samples every lot, so the readings of resistance are consistent and the Cpk is go
3、od. So I will study the mean at the first stage instead of the Cpk, the target is to make the mean of each winding match the spec. mean. For long term target, it is to make the Ppk greater than 1.5 and the resistance match the spec. mean. Other Benefits: 1. Improve the DPPM and prevent scrap. 2. Imp
4、rove the process capability and eliminate customer complain.,Team Member,NameOrganization JB ZhuME Actuator and coil - Leader/Data analysis CL YangME Actuator - Actuator ME JX GuoME Actuator - Coil Post Zhi Ping LiME Coil - Coil winding LY YangME Coil - Measurement,Update Trend Chart,Below is the la
5、test trend chart. This trend chart is based on the coils are all wound by 0.201mm wire. The target of last time is 5.814, per the baseline which is 5.863 this time, the target does not met. Per this trend chart, update the target as 5.82.,Project Timeline,PhaseDeliverablesPlan Due DateActual Complet
6、e Date DTrend Chart April 2, 2003April 04, 2003 + MFishboneMarch 31, 2003March 29, 2003 GR&RApril 01, 2003April 02, 2003 FMEAApril 08, 2003April 07, 2003 + ATrend ChartApril 30, 2003May 5, 2003 Multi-VariMay 7, 2003May 10, 2003 Hypothesis TestsMay 7, 2003May 10, 2003 ANOVAMay 8, 2003May 12, 2003 + I
7、DOE PlanJune 16, 2003June 16, 2003 DOE AnalysisJune 23, 2003June 23, 2003 Revise SettingTBD + CUpdate Trend ChartJuly 28, 2003July 28, 2003 Process Control PlansJuly 29, 2003July 29, 2003 +,Improve phase result,Recall the result from Improve Phase The KPIVs found from Improve phase are: Coil ID & Wi
8、nding Tension Revised setting 0.201mm wire with 2.5N winding tension Reconfirmation run result. Because we have no 0.200 mm wire on hand so we use 0.201mm wire, and the winding tension is 2.5N to reconfirm the setting. 5.8013-0.2270*0.201+0.119*2.5-0.0167*0.201*2.5=6.044 But the actual resistance is
9、 5.689, that suggest the equation is not adequate, there may be other noise factor which will also affect on the coil resistance.,Process Control Plan,Since number of turns is fixed factor, and the wire ID is determined per each lot wire, so the winding tension is the main KPIV will be monitored in
10、future. Current, the technician tests the winding tension every shift. For wire replacement and program adjustment, will also test the winding tension. Current does not monitor the wire ID per each spool, there is just IQC audit each lot. The technician who is responsible for the product will also r
11、esponsible for the monitoring and take action.,Control Chart,Conclusion,Per the control chart at last page, the UCL is 5.901 and the LCL is 5.826. The coil resistance are all measured at coil winding level. Because the coil leads cant be cut at the right length at coil winding level, there must rema
12、in about 20mm for each lead for coil post process convenience. So the actual resistance will be less than the measured value. Will consider to have a compensation next time when make the trend chart.,Issues / Barriers,The experiments are limited by the wire, the special ID wire must be ordered specially, so the cost will increase largely. And the lead time will be too lo
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026-黑龙江中国邮政预算核算招聘考试参考题库-含答案
- 2026-湖南小学教师宣传新媒体招聘考试参考题库-含答案
- 2026-吉林退役军人服务中心招聘考试参考题库-含答案
- 2026浙江舟山市普陀区东港街道社区卫生服务中心招聘编外医务人员1人考试备考题库及答案解析
- 中国民生银行长沙分行2027届校园招聘笔试参考题库及答案解析
- 2026年偏关县教师招聘考试备考题库及答案解析
- 2026浙医健衢州医院招聘常山养老管家1人考试参考题库及答案解析
- 2026济南泉商调解中心公开招聘司法助理笔试参考题库及答案解析
- 中国银行股份有限公司2027全球校园招聘考试备考题库及答案解析
- 2026年叶县教师招聘笔试备考题库及答案解析
- 2026年建行信息技术类笔必背题库【夺冠】附答案详解
- 风电工程安全技术规程
- 2.5 跨学科实践:制作隔音房间模型 课件(内嵌视频)2025-2026学年人教版物理八年级上册
- 《濒危野生动植物种国际贸易公约》附录中文版2026
- 杭州雷峰塔图文课件
- 秦始皇陵课件
- 船舶维修作业安全管理规范
- 女童保护课件
- 宠物超声教学课件
- DB14∕T 3151-2024 公路钢波纹管涵洞施工技术规程
- 人工智能导论知到智慧树章节测试课后答案2024年秋天津大学
评论
0/150
提交评论