国外著名酒店工程部操作程序(英文版)_第1页
国外著名酒店工程部操作程序(英文版)_第2页
国外著名酒店工程部操作程序(英文版)_第3页
国外著名酒店工程部操作程序(英文版)_第4页
国外著名酒店工程部操作程序(英文版)_第5页
已阅读5页,还剩14页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING DOOR STOPS STANDARD: DOOR STOPS ARE SRCURE AND STOPPING FURNITURE DAMAGE.PROCEDURE:1 Check door stop is securely fixed to wall or floor.2. Check the rubber on the stop is in good condition and located correctly.3 Check the door stop is located at the correct height and position to stop the door before it hits any other item.4 Check and repair any damage on the back of the door where the stop hits it .5 Reolace any door, stop thowing signs of rust.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING RAKIO CONTROLSSTANDARD: RADIO CONTROLS ARE OPERATING AND IN GOOD ORDER.=PROCEDURE: 1 Check radio knobs operate freely and lock out when another is depressed.2 Check line indicator globes are operating .3 Check engraving is colour infilled and clear.4 Check all stations are and tuned.5 Check volume control is secure and operating volume levels are correct.6 Check cover plate is not scratched or marked and is securely fixed to the wall .7 Check volume control in the batheoom operates correctly and is secure.8 Check sound reproduction from speaker is clear and speakers are not damaged.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING TOILETLET FLUSH STANDARD: TO ENSURE CORRECT OPERATION AND WATER CONSERVATIONPROCEDURE1 Depress flush button and time the flush cycle, this should not exceed 7 seconds or be less than 4 seconds.2 After the flush ensure system shuts of water supply to the bowl and starts refilling the cistern tank.3 Check the thank refill shuts off tightly, 25 mm blow the overflow pipe by removing the lid and watching the water inlet and level.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING A GUESTROOM CLOCK STANDARD: CLOCK WILL BE CHECKED AND SET AT THE CORRECT TIME EACH KEN FIX VISIT PROCEDURE:Each guestroom is equipped with an analog clock located on the bedside conetrol panel or between each bed.The clock is to be adjusted to the correct time on each visit by turning the knob in the centre of the clock either clockwise or anti clockwise. This will turn the minute hand and engage the hour hand each revolution to tick over the hour . When time is correctly set release centre adjust button and watch for one minute to ensure the clock ticks over one minute.Check the alarm off/on switch is turned in the off position. To check the alarm operation depress the centre adjust dnob and set the alarm to go off I minute ahead of the time indicated on the clock. Switch the alarm, switch to on and wait for alarm to sound, when alarm has sounded switch the alarm off. STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING ARTWORKSTANDARD: ENSURE ARTWORK IS IN GOOD CONDITION AND SECURELY MOUNTED TO WALL=PROCEDURE:1. Check artwork is securely mounted and fixed to wall.2. Check artwork is mounted square and level, adjust if necessary.3. Repair any scratches, marks or damage on artwork frame.4. Ensure artwork is sitting flush in frame and free of wrinkles5. Check glass for scratches of cracks and replace as necessary.6. Report any damage to artwork print to the Chief EngineerSTANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING OF VENTS STANDARD: MAINTAIN AIR CONDITIONING VENTS FREE OF DUST AND CLEAN.=PROCEDURE:Return air filters will not remove all dust particles from the air, this combined with the static build up grills caused by air flowing continuously across grills in one direction, will cause dust build up on the grills. This is to be cleaned off with a dry cloth during each Ken Fix It visit.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECK CEILING FAN STANDARD: CEILING FAN AND RELATED SWITCH GEAR OPERATE CORRECTLY AND THE MOTOR IS KEPT FREE OF DUST BUILD UP.=PROCEDURE:1. Check the ceiling fan blades are tightly fixed to the boss. 2. Check paintwork is in good condition.3. Isolate fan and clean motor vents and top blades.4. Check .directional switch is in the correct setting, fan should operate clockwise when looking up at it .5. Check switch on bedside panel operates correctly in all three positions.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: WINDOW SHUTTERS CHECKSTANDARD: WINDOW SHUTTERS WILL OPERATE FREELY AND BE MAINTAINED IN GOOD CONDITION.=PROCEDURE:On each Ken Fix It visit the window shutter operation is to be checked to ensure they open and close freely and .correctly ,check open shut arms are secure and all louvres are connected tightly. Check window shutters are secure and flush to window frame recess. Check paintwork is unmarked and touch on when necessary.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: ROOM BALCONY CHECK STANDARD: BALCONY TO BE CHECKED AND REPAIR AS PER PROCEDURE.=PROCEDURE:There are two types of balcony installed in the hotel guest rooms, one screened and sealed concrete on the ground floor and a wooden slat balcony on the first floor, both are covered under this procedure.1. GROUND FLOOR :a) Check for chips and cracks and fill as necessary.2. FIRST FLOOR :a) Check for wood splinters sand out as necessary. b) Check for protruding nails and repair as necessary.c) Check wood stain is even and in good condition.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING SHELVESSTANDARD: MAINTAIN SHELVES IN A SAFE AND DEFECT FREE CONDITION.=PROCEDURE:All shelves are to be checked to ensure the support studs and rails are securely fixed and are supporting the shelves evenly.Check for and repair any chips, scratches, splinters or paint stains.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: HAIRDRYER CHECKINGSTANDARD: ENSURE HAIRDRYER IS OPERATING CORRECTLY AND SAFELY.=PROCEDURE:1. Check hairdryer is firmly mounted to the wall.2. Check outside appearance for scratches, dents and burn marks.3. Remove hairdryer hand piece from the holder and check the flexible hose is free of holes, splits and deterioration.4. Looking into the handpiece, air out area, check for any build up of hair or flammable material, remove if present.5. Start the dryer and check volume and heat output of the air is consistent with a new dryer.6. Check the cycle is operating satisfactorily.7. Turn off and replace hand piece in provided socket.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECK PRIVACY LOCKSSTANDARD: MAINTAIN SECURE OPERATIONAL PRIVACY LOCKS.=PROCEDURE:Each main guestroom door is equipped with a concealed privacy (security) lock. This is an important guest amenity for safety and security.Each Ken-Fix-It visit will ensure it is freely and securely operating.1. Check lock in switch activates holding clamp.2. Firmly jar door back while chain is engaged to ensure hold down bolts are secure.3. Release lock in switch to ensure holding clamp releases.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECK SECURITY VIEWERSSTANDARD: SECURITY VIEWERS ARE TIGHT, IN GOOD CONDITION AND INSTALLED IN THE CORRECT WAY.=PROCEDURE:1. Check inside and outside condition of security viewers, replace if chipped or damaged in any way.2. Checking locking nuts are tight.3. Check glass is installed the correct way i .e . view from inside to outside.4. Make sure glass is not scratched, cracked or broken, replace if necessary.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECK ROOM SIGNAGESTANDARD: SIGNAGE TO BE FIRMLY FIXED IN GHE CORRECT LOCATION AND IN GOOD CONDITION.=PROCEDURE:At each Ken Fix It visit room signage is to be checked to ensure it is properly fixed and legible. Any damage signs are to be repaired or replaced. Room signage consists of the following:1. Room number (located outside entrance)2. Telephone information (located on phone)3. Safety notice (located behind batheoom door)4. Liability notice (as above )5. Voltage indication (bathroom shaver outlet)STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING HEAD BOARDSSTANDARD: HEAD BOARDS ARE IN GOOD CONDITION AT ALL TIMES.=PROCEDURE:Boards are fixed to the wall and located at the end of the bed.1. Ensure Headboards is securely fixed.2. Check and repair any areas where the material seams are pulling away from the wooden frame.3. Check wooden frame for any splinters and on chips and repair as necessary.4. Check timber stain is in good condition.5. Check overall condition is appealing.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING TOILET SEATSSTANDARD: TOILET SEATS ARE SECURELY FIXED AND IN GOOD CONDITION.=PROCEDURE:1. Check toilet seat and cover are free from any defects.2. Check the fixing bolts for the hinge are securely in place. If adjustments are required refer to attached installation information.3. Close the lid and ensure it sits flush on the pan rim.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING TOILET PANSSTANDARD: TOILET PANS ARE DEFECT FREE AND SECURELY FIXED TO THE FLOOR.=PROCEDURE:1. Check water seal is not leaking where cistern pipe penetrates toilet pan.2. Check toilet pan for any cracks or chips and report any damage to the Assistant Engineer so the room can be put out of order and rectification work carried out.3. Check the bottom of the pan is grouted evenly and crack free to the floor. Repair if necessary.4. Check hold down bolts in the base are not rusting.5. Flush the toilet and check the water flows evenly around pan and out through the S Trap.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING TOILET PAPER HOLDERSSTANDARD: TOILET PAPER HOLDERS TO BE IN GOOD OPERABLE CONDITION.=PROCEDURE:1. Check screws holding the toilet paper holder frame are tight and secure.2. Check roller release arms operates freely.3. Check roller turns freely when in position.4. Check chrome i

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论