




已阅读5页,还剩20页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Process Capability Analysis,Intelligent, Creative and Sustainable Solutions that Elevate Brands and Accelerate Performance Throughout the Global Retail Supply Chain,May 2015,Kenny,Operational ExcellencePanyu / China,Module Objectives,Understand Capability StudyShort Vs Long Term StudyUnderstand the Implication of Capability Study,Capability Analysis Aims to Answer.,ARE OUR CUSTOMERS EXPECTATIONS BEING MET? How are we doing? How well could we be doing? What can we expect tomorrow, next week? Which supplier is giving us the best quality?,Capability,A process is capable if it is able to produce a good quality product consistently,Specification,Lower and upper specification limits define the customers view of the spread acceptable of a product attribute or a process result.,Lower Specification Limit (LSL),Specification width or tolerance width,Upper Specification Limit (USL),Any products that build beyond the spec limits are considered scraps or reworks.,A Statistic Look of Capability Study,No Capable,Capable,Process Capability Indices,Cp Potential Capability Also called “process entitlement” or the “best” your process could ever hope to perform in the short-term,Total tolerance range just enough to cover +/- 3 sigma if Cp=1,For one sided specification, one sided Cp is defined,Since s always unknown, then,Cp = Cpk when the process is well centered.,Cpkuse the mean, not only the tolerance band to estimate capability therefore taking account of off-centredness. The term “min (Cpk(l), Cpk(u)” is stated as the shortest numerical distance between the mean and the nearest spec limit.,Process Capability Indices,Cpk = min Cpu, Cpl,Example,In semiconductor manufacturing, gate oxide might be specified for: Lower Spec Limit = 210 Angstroms Target thickness = 240 Angstroms Upper Spec Limit = 270 AngstromsIf we assume that the process data indicates that the mean thickness is actually 247 Angstroms with standard deviation of 5 angstroms.,Warm up Exercise : The Application of Cp & Cpk,3 suppliers being tested of the same products on one of the critical parameter. (3 factories worksheet) Whats the respectively Cp & Cpk for these 3 factories considered the spec of 26.533 ? Whats the best supplier that you would like to work with? Why? (Hint: Please estimate the defectives rate base on the normal curve characteristic)Is there the relationship in between the Cpk and defectives rate?,A,B,C,Repeat the exercise but with Minitab,3 suppliers being tested of the same products on one of the critical parameter. (3 factories worksheet) Whats the respectively Cp & Cpk for these 3 factories considered the spec of 26.533 ? Whats the best supplier that you would like to work with? Why? (Hint: Please estimate the defectives rate base on the normal curve characteristic)Is there the relationship in between the Cpk and defectives rate?,A,B,C,Whats the minimum Cpk requirements on each supplier ? Why?,0,1 2 3,-3 -2 -1,Standard Normal Distribution when m = 0 and s = 1.,Standard Normal Distribution,This transform converts any normal distribution into a “standard” normal distribution.,The Z Transformation,REAL World,Z World,Example : Compute the Z score of spec limits,2.25 sigma away from the mean on the left,2.75 sigma away from the mean on the right,-2.25,2.75,5,15,Estimate the defectives rate from the Z-score by Minitab,Find the probability of X < 5 (or Z < -2.25) using Minitab,CalcProbability DistributionsNormal,1 - 0.99702 = 0.00298,%Defective = (0.0122245+0.00298)*100% = 1.5205% DPPM = 15,205,Process Capability Study for Discrete Data,Example,Example,Long Term Process Capability :Total variation including shifts and driftsPp and Ppk,Short Term Process Capability :Only random or short-term variationCp and Cpk,Rational Sub-grouping & Long Term Capabilities Study,Long Term vs Short Term,Short Term,Short Term,Short Term,Short Term,Short Term,Short Term,Short Term,Long Term,To have good estimation of Short Term and Long Term, collect data in subgroup over time (cover all the foresee-able variations). Example : Worksheet : SubgroupUSL : 15LSL : 4,EXAMPLE (4),Long Term vs Short Term,StatQuality ToolsCapability AnalysisNormal,Long Term vs Short Term,Long Term vs Shor
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 公司春节职工活动方案
- 公司电影活动方案
- 公司每年活动方案
- 公司生态酒会活动方案
- 公司活动视频策划方案
- 公司爱心捐助活动方案
- 公司新闻策划方案
- 公司播音室活动方案
- 公司新入职活动策划方案
- 公司旅游节目策划方案
- GB/T 28728-2012溶液聚合苯乙烯-丁二烯橡胶(SSBR)微观结构的测定
- 小学《科学》期末测评方案
- GB 18613-2006中小型三相异步电动机能效限定值及能效等级
- 2023年湘西市(中小学、幼儿园)教师招聘笔试题库及答案解析
- 公司企业实习鉴定表格
- 锁骨下动脉窃血综合征 (2)PPT
- 大学毕业生离校退宿申请表模板
- 大班社会《爱发脾气的菲菲》课件
- 【海外华文文学】期末考试复习提纲
- 化工进展稿件编辑、排版体例格式
- 美丽乡村片区内监理规划范本
评论
0/150
提交评论