交通毕设外文文献.doc_第1页
交通毕设外文文献.doc_第2页
交通毕设外文文献.doc_第3页
交通毕设外文文献.doc_第4页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

city viaduct entrance ramp traffic character study autor:li yingshua,xu huithe rapid development of the automobile industry and the relative lag of the road construction have constituted a prominent contradiction all over the world,particularly, in most of large cities. to cope with it,elevated roads have been built in many cities both at home and abroad. however, traffic jams frequentlyappear on elevated roads immediately after the completion of their construction. the awkward situation mainly results from the planning bug or the unsuitable control, apart from drastic increase in transportation demand. elevated roads, ramps and ground roads areclosely interconnected in three-dimensional urban traffic networks.the mathematical modeling and numerical simulation were conducted for the sections of. elevated roads and for the interaction of elevated roadsand intersections on the ground. after having analyzed the complicated dynamic behavior on the elevated roads, some suggestions were put forward for the transportation planning and management. the contents of the dissertation are as follows:(1) by combining manpower survey with the video recording, a series of field measurements were conducted on several sections of the elevated road system in shanghai city and then the main characteristics of composed of the common language runtime (clr) and a unified set of class libraries. ations were established, which are suitable for the free flow and the congested flow respectively. and thus two important parameters, namely, the free flow speed and the jamming density, were determined. the fundamental diagram obtained from the measured data reveals three distinct traffic phases.(2) with the wuning of-framp of the inner ring elevated road in shanghai city as a representative case, meticulous observations were carried out on traffic flow at the intersection near the of-framp. and it was found that the squeezing effect of right-turning vehicles from the intersecting main road on the straight motion of vehicles from the of-framp is the main reason of the existing traffic jam. a modified 1- d model. with the modified model, numerical simulation was performed with special attention to the disturbing effect of right-turning vehicles. the results agree quite well with the observed data. the analysis shows that the squeezing effect, which exacerbates with the increasing number of right-turning vehicles, is the principal cause of congested traffic at certain intersec tions. the inappropriate design and construction of ramps in front of busy crossings enhances the congestion. thus, installing the right-turning traffic lights may be a promising way of solving the problem.(3) there exist severe problems in the transportation on elevated road system in shanghai city, such as frequent congestions or jams on the elevated roads and their ramps. for this reason, measures of controlling the on-ramp traffic with timing signals were suggested in this dissertation. the reasonable timing scheme was recommended for signal controlling. on the basis of an anisotropic hydrodynamic traffic model developed by our research group, a ramp-effect term was introduced in the motion equation and traffic flows on the elevated road sections near the on-ramp were numerically simulated. the results show that signaling control of on-ramp is helpful for the improvement of traffic on the elevated roads. we also found the best timing scheme after comparison among six choices of signaling period.(4) the gear-alternating regulation was first actualized at the interfluent location of on-ramps in shanghai elevated roads, which was theoretically studied in this dissertation. different traffic flow models were established for the cases with and without the alternate running rule based on the fi cellular automaton traffic model. with the models, the traffic behavior at the interfluent location of on-ramp was investigated and some results were concluded. when there are many inflowing vehicles on the elevated road and ramp, the traffic situation on the elevated road with the alternating regulation is much better than that without the regulation; when there are less inflowing vehicles, the elevated road situation keeps unvaried on the whole in the two cases. the vehicles on the elevated road and the on-ramp are easily to move forward with 1: 1 pro-portion in congestion or free flow states and often with 2: 1 proportion in the medium-speed flow.(5) the weaving areas often turned into the bottleneck on the elevated roads. on the basis of the ns cellular automaton traffic model, the weaving section with one-lane main road was simulated and analyzed.for the free traffic flow, weaving operations almost has no influence on the system, even with the weaving length being increased. on the other hand, when the traffic flow is in congested state, weaving conflicts have negative effects on the system. the traffic situation will be improved with the increase of weaving length. our simulation results suggest that the length of weaving sections need not to be inappropriately increased, and a proper medium value can be chosen to get an optimal traffic situation.finally, the prospect was briefly reviewed for the future advances in the research of urban traffic flows in china.city expressway on-ramp control are mainly local single ramp independent control and a handful of ramp coordination control, the current game.the department of ramp control most research only for independent ramp control research.investigate. many city expressway ramp was very close, a lot of ramp.the distance is only 200 300 m, the ramp in the operation of traffic.flow interference is very serious, in this case on the relative.the entrance ramp for independent control is not reasonable. in this paper shanghai city expressway actual testing data, the 2 main near.distance ( distance of less than 450 m ) entrance ramp traffic flow characteristics in study.based on bus enter or exit operation mechanism,the realistic traffic capacity model of bus stop is established combined with reduced loading areas of bus stop,and then,the standard design mode of bus bay stop is worked out and according to the different road grade of main trunk road,sub trunk road and branch road,model and sizes of bus bay stop set at the intersections and road sections are made integrated designs the design mode has been applied in the suzhou industrial park,which can provide essential reference for urban road design,especially the bus stoptraffic control means is: focus on the elevated road itself from macroscopical angle measures, for articulation section microscopic insufficient consideration. because the present our country real time traffic information collection.technology needs to be further improved, by means of avoiding ramp traffic control regional congestion queuing and the validity of the restricted. in view of the exit ramp.link road and traffic flow characteristics, traffic management has taken a different turn through means of organization, including lane function division, ban and other methods, to hold block queuing and the improvement effect was more timely. but in view of different exit ramp connecting sections, how to adopt the different traffic organization,at present there is no systematic theoretical analysis and research. how to make a continuous flow with stop to organic join, make full use of resources, make the system of the optimal, for elevated road and ground road system construction and operation a special significance.ramp presence becomes limiting articulation section inlet tract operation important factor, according to the traffic demand and supply balance principle, should ensure that the exit ramp connecting the highway capacity and the ramp and the ground to flow to match, make traffic can timely discharge, system is maintained in a relatively stable state. to ban the articulation section, traffic operation mode and the general intersection similarity, this does not do the special analysistraffic control measures that is by setting the signal lamp, the conflict points distribution of traffic flow in different time periods, so as to achieve at the same elevation pavement to eliminate conflict point; stereo cross measure that is by setting the engineering facilities, the conflicting traffic arrangement in different elevation on the road, in order to achieve various time range to eliminate the conflict point; roundabout measures that is by setting the large center island, interwoven into the ring road and vehicle running around the island, will intersect the traffic stream is converted to interlaced stream, at various time within the same elevation on the road to eliminate the conflict points, far leading circuitous measures its practice is actually the conflict is converted to interlaced, disappear in addition to conflict point.city road in intersection traffic flow, has been generally take the measures to eliminate, reduce conflict point. according to interweave, confluent, diverting traffic impact on the relatively few studies and countermeasures. if the city road traffic volume is not within the time period or region, interweave, shunt, the effect of relatively in acceptable condition, study its impact on traffic and countermeasure of urgency is not obvious, but as the city increase of traffic, especially the city expressway construction, it is necessary to interweave shunt, confluence, the implications for further study, and research to improve the flow of traffic improvement measures. based on the characteristics of city road network, its characteristic is generally more developed road network, the relatively small spacing, a lot of old urban road network distance between 200 to about 600 m, mixed traffic flow on road network traffic capacity influence is increasingly serious, with the city expressway construction, elevated expressway in the city built the use of existing road width layout, avoid a large number of residents, this mode of construction in large city, typical example is the shanghai inner ring viaduct. with the elevated expressway construction, to contact the rapid transit and ground slow traffic, according to the traffic needs to set up the ramp traffic conversion, but according to now run the examples, more traffic problems in the ramp and ground traffic conversion between. in view of the above problems, the article on the city road network space is smaller under the conditions of mixed flow of traffic capacity and the effect of improving measure to undertake preliminary discuss

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论