




已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
the control system of the siam photon source weerapong pairsuwan and takehiko ishii, national synchrotron reseaech center, p.o. box 93, nakhon ratchasima 30000, thailand goro isoyama, institute of scientific and industrial research, osaka university, 8-1 mihogaoka, ibaraki, osaka 567-0047, japan tamotsu takeda and yoshifumi hayashi, fuchu works, toshiba corporation, 1 toshiba-cho, fuchu, tokyo 183-0057, japan yutaka hirata, isogo nuclear engineering center, toshiba corporation, 8 shinsugita, isogo-ku, yokohama 235-8523, japan abstract a new computer control system has been developed for the accelerator system for synchrotron radiation of the national synchrotron research center of thailand. the control system comprises some personal computers for control and several programmable logic controller for hardware interfaces and local controllers, connected with ethernet. outlines of the accelerator system and its operation are briefly introduced, and details of the control system are presented. 1introduction the siam photon project aims at establishing the first synchrotron radiation (sr) facility in thailand for promoting sciences and technologies using sr 1. the national synchrotron research center has been founded under the ministry of science, technology and environment, and the siam photon laboratory is being constructed in nakhon ratchasima, 250 km to the northeast bangkok. the accelerator system for the 1 gev sr source called the siam photon source, which was originally donated by the sortec corporation in japan 2, is now being reassembled at the siam photon laboratory. the storage ring will be remodelled to make the emittance of the electron beam lower and to accommodate four long straight sections for insertion devices 3, while the injector system will be assembled as it was in sortec. an exception is the control system. the sortec control system was fabricated more than 10 years ago using a mini-computer with a non-standard operating system and special interfaces, which were connected with rs232c lines 4. as hardware and software for the computer control system have changed considerably in these ten years, it is not practical to use the old system again. thus we decided to replace the control system including the interfaces. we reported on the design study of the new control system at the previous pcapac in tsukuba, japan 5. the control system has been fabricated by toshiba corporation. in this paper, we will first introduce the accelerator system briefly and then describe details of the control system of the siam photon source, which is ready to be installed and commissioned. 2accelerator system 2.1 general the accelerator system of the siam photon source comprises the 1 gev electron storage ring for the sr source and the 1 gev injector synchrotron equipped with the 40 mev linac as the pre-injector. figure 1 shows the ground plan of the accelerator system and the building. the storage ring is located on the first floor, while the injector is on the first basement. there is a 3 m high and 0.5 m thick concrete wall right outside of the storage ring for radiation shielding, separating the storage ring room and the experimental hall. the main power supplies for the synchrotron magnets are installed in the room on the first floor, called the electric substation (ess) room. the control room for the accelerator complex is located on the second floor and the outside of the experimental hall. the electron beam accelerated with the linac is injected via the low energy beam transport line (lbt) to the synchrotron. then it is accelerated to 1 gev in the synchrotron. the extracted electron beam from the synchrotron is transported via the high energy beam transport line (hbt) to the storage ring. the electron beam is steered from the first basement to the first floor in hbt, and injected in the storage ring from inside. the main parameters of the accelerator system are listed in table 1. 2.2 storage ring the magnet lattice of the storage ring is the double bend achromat and there are four 7 m long straight sections for installation of insertion devices. it is composed of eight bending magnets, four families of quadrupole magnets, two families of sextupole magnets, and horizontal and vertical steering magnets. the bending magnets are connected serially to a single power supply. the bending and the quadrupole magnets have correction coils each. there are an rf acceleration system consisting of an rf cavity, an rf amplifier and a low level controller, and an injection system consisting of a septum magnet and three perturbator magnets. some monitors and diagnostics tools are installed such as a beam current monitor, beam position monitors, vacuum gauges, and an rf knockout system. 2.3 injector the injector is composed of the linac, the synchrotron, lbt, and hbt. the linac has its hardware control system in the control room and it is possible to remotely operate the linac by exchanging some commands and status only. there are two bending magnets, eleven quadrupole magnets in lbt. three screen monitors, vacuum gauges, two slits for scraping the electron beam, and some monitors are also installed. in the synchrotron, there are 12 bending magnets and two families of quadrupole magnets. these magnets are excited by the large power supplies b, qf and qd in the ess room. excitation patterns of these magnets are given in the pattern memories for the power supplies. there are several horizontal and vertical steering magnets, and an rf accelerator system in the synchrotron. some monitors and diagnostics tools are also provided. a septum magnets and 4 perturbator magnets are used for injection, and a fast kicker magnet and a septum magnet are used for extraction of the electron beam. hbt comprises of two vertical bending magnets, two horizontal bending magnets, eight quadrupole magnets, and some horizontal and vertical steering magnets. monitors installed are some screen monitors, vacuum gauges and beam current monitors. 2.4operation at present it is expected that the accelerator system will be operated only in the daytime and the evening. the daily operation of the accelerator system will be made as follows. it will be started up in the morning and the beam will be injected in the storage ring. it will take several minutes to fill electrons in the storage ring. after electrons being filled in the storage ring, the operation mode of the storage ring will be changed for user experiments; the closed orbit may be corrected, the undulator gap will be changed. the injector will be set to the standby mode for a next injection. the electron beam in the storage ring will decay in several hours. this operation will be repeated a few times a day in the routine operation for user experiments. then the accelerator system is shut down in the evening. 3new control system there are several requirements for the new control system; it should provide an easy tool for routine operation for user experiments, and special and detailed operation of every device under control should be possible in machine study. the control system should be flexible for future extension not only of the accelerator system but also of the control system itself. the hardware including computers and interfaces will become old- fashioned quickly, so that it should be possible to replace table 1: main parameters of the accelerator complex linac energy40 mev rf frequency2.856 ghz beam current60-80 ma macropule width1.7 s energy spread (fwhm)1.3 % emittance0.7 m rad synchrotron energy1.0 gev circumference43.19 m beam current30 ma repetition rate1.25 hz rf frequency118 mhz harmonic number7 storage ring energy1.0 gev circumference81.3 m stored current (expected)500 ma magnet latticedba superperiodicity4 long straight sections7 m4 natural emittance74 nm rad rf frequency118 mhz harmonic number16 figure 1: ground plan of the accelerator system and the building. ycrt o eprmntal hall storage ring high energy beam transport lne low energy beam transport line injector linac electric substation control room it with new one without changing control software. considering these factors, we have decided to adopt a combination of personal computers (pc) for control computers and programmable logic controller (plc) for interfaces for the new control system of the accelerator complex. the characteristics of the control system are as follows; (i) it is a distributed control system, (ii) only general purpose components such as pcs and plcs are used, (iii) consequently it is easy to upgrade and expand, (iv) it is reliable since control of devices are mainly conducted by plcs, and (v) it is cost effective. 4hardware 4.1system structure the schematic diagram of hardware of the control system is shown in fig. 2. the control system consists of two pcs for control, which we called servers, three pcs for operator terminals, and five device control stations (dcs), each of which has a plc inside for interfaces. there is an additional dcs with a plc named global interlock system (gis), which is the interlock system for radiation safety. these pcs and plcs are connected with ethernet via a switching hub in the control room. the pcs and the plcs in the control room are connected with hard wires. the other plcs in the synchrotron, the electric substation and the storage rooms are connected with optical cables. a router is also connected to the hub and the control system is linked with lan in the laboratory. it is possible to access only the database server (acq-srv) from outside. the control server (cnt-srv) is connected with gpib or rs232c interface to the pattern memory defining excitation patterns of the main magnets in the synchrotron, a digital multi-meter for the stored beam current in the storage ring, and the timing controller for injection and extraction of the electron beam and so on. 4.2interfaces the five dcss are branches of the control system and they work as local controllers as well as interfaces. each contains a 16-port hub for connection to the network, a plc, and input and output (i/o) terminals for controlled devices. lbt-dcs and syn-dcs are installed in the synchrotron room, ess-dcs in the electric substation room, str-dcs in the storage ring room, and cnt-dcs together with gis in the control room. lbt-dcs consists of two racks, while str-dcs is separated to two components; one consists of three racks and the other two racks. the other dcss have a single rack. cnt-dcs and gis in the control room are assembled in a single rack. we adopted plcs made by rockwell automation / allen bradley named controllogix, since it is widely figure2: structure of the control system. control room ethernet (optical cable) data logger pattern memory digital multi-meter ts-1 ts-2 modem server desk ibm 互換機 ibm 37xx cnt-srv ibm 互換機 ibm 37xx acq-srv devices in cntdevices in gis gis-dcscnt-dcs gpib rs-232c hub operator desk printeropr-pc1opr-pc2opr-pc3 lan lan local router str room devices in str (i) status check before operation, (ii) operation of power on by a pulsed signal, (iii) confirmation of the status to change to power- on within a prefixed time. the second example is setting of the output current, (i) conversion of a numerical value, (ii) status check before operation, (iii) setting of an output figure 3: example of control panels on the operator pc. current, (iv) output of a strobe with 20 ms duration. the program for control is written in the standard ladder language for plc. the plcs execute two kinds of jobs in parallel; one is consecutive loops and the other is interruptions in every 20 ms. communications with the upper level controllers take place via registers in the plcs. when an operator pc orders operation to a device, the pc writes a command in a register of a plc through ethernet. the plc reads the command and executes it. it continuously reads status of the devices and writes in registers, so that the control pcs can obtain practically real-time information about the devices by reading the registers. a special function is provided, which enables to vary the output current of a power supply continuously or synchronously with other power supplies. this function will be used to accelerate the electron beam in the storage ring or to excite a super-conducting wiggler with the operation point kept constant in the tune diagram. a plc has a set of 100 registers for one numerical setting. if you write a initial value, a final value and an interval in the registers, the plc interpolates linearly between these two values and set the value in between to a power supply at every 100 ms. since 100 such values can be specified, any output variations which is a non-linear function of time can be approximated with a line graph. 5.2control software in pcs since practical control of individual devices is conducted by the plcs, the main role of the operator pcs is to provide the man-machine interface for control. operation of individual devices and reading status from them are made by directly writing commands in registers of the plcs and reading status or numerical values from them via ethernet. exceptions are the devices connected to cnt-srv using gpib or rs232c. how to exchange commands and data between the operator pcs and cnt- srv depends on devices. some data is transferred using a data file in cnt-srv and others via plcs. automatic operation of the accelerator system, which was be mentioned in chapter 2, is conducted by the plc in cnt- dcs. the procedure for automatic operation is programmed in the plc and an operator pc only triggers it. there are three sorts of control program running in the operator pcs; automatic operation, individual control, and monitors and utilities. automatic operation is used for routine operation of the accelerator system, such as start- up or shut-down. the accelerator system can be automatically operated by a single click of a button. individual control is used for display of operational status of the devices under control and for fine adjustment, which will be mainly used in machine study. monitors and utilities are programs used for measurements and displays of the beam current, vacuum, beam positions in the storage ring, setting of excitation patters of the main magnets of the synchrotron, and so on. two kinds of man-machine interfaces are provided for individual operation; one is a table format, with which a choice and operation of a device can be quickly made, and the other is a graphical user interface showing schematic drawing of the accelerator system. either one can be chosen depending on the purpose. an example of the control windows on an operator pc is shown in fig. 3. these man-machine interfaces are written with visual basic for applications and rs view 32 of the rockwell software. an operator pc reads only data displayed on the screen from plcs. the interval to read input data on a window and to write them in plcs, or read status from plcs can be independently set to each operator pc and the interruption time is now set at 0.3 s. if the response time is defined as the time between start of operation and the change of status due to the operation, twice the interruption time is the minimum response time of the control system. in the practical use, we plan to adjust the renewal time of the man-machine interface windows in order to optimise the response time and the network load. 6present status and plans the control system was completed and inspected for acceptance at the fuchu works of toshiba corporation at the beginning of september 2000. installation of the new control system will be commenced in january 2001, when re-assembling of the accelerator system will be in the final stage. commissioning of the control system will be completed in a few months. we have plans to install an undulator in a few years and a super-conducting wiggle in the next phase, and accordingly the control system will be upgraded progressively. references 1 w. pairsuwan and t. ishii, “the siam photon project”, proc. of apac 98, kek, tsukuba, japan, march 1998, p. 36. 2 m. kodaira, n. awaji, t. kishimoto, h. usami, and m. watanabe, “development of highly stable synchrotron radiation source at sortec”, jpn. j. appl. phys. 30 (1991) 3043. 3 p. kengkan, w. pairsuwan, g. isoyama, t. yamakawa and t. ishii, “magnet lattice for the siam photon source”, j. synchrotron rad. 5 (1998) 348. 4 m. takanaka, t. iida, a. komine, n. awaji, s. nakamura, m. ohno and e. toyoda, “control system of the 1 gev synchrotron radiation source at sortec”, proc. epac 90, 1990, vol. 1, p. 836. 5 w. pairsuwan, t. ishii, g. isoyama, t. yamakawa, y. hirata, t. takeda, and n. tsuzuki, “computer control system for the siam photon sourcet”, proc. of pcapac 99, kek, tsukuba, japan, january 1999, fr5. 我的大学我的大学爱爱情情观观 1 1、什么是大学、什么是大学爱爱情:情: 大学是一个相对宽松,时间自由,自己 支配的环境,也正因为这样,培植爱情之花 最肥沃的土地。大学生恋爱一直是大学校园 的热门话题,恋爱和学业也就自然成为了大 学生在校期间面对的两个主要问题。 恋爱关系处理得好、正确,健康,可以 成为学习和事业的催化剂,使人学习努力、 成绩上升;恋爱关系处理的不当,不健康, 可能分散精力、浪费时间、情绪波动、成绩 下降。因此,大学生的恋爱观必须树立在健 康之上,并且树立正确的恋爱观是十分有必 要的。因此我从下面几方面谈谈自己的对大 学爱情观。 2 2、什么是健康的、什么是健康的爱爱情:情: 1) 尊重对方,不显示对爱情的占有欲,不 把爱情放第一位,不痴情过分; 2) 理解对方,互相关心,互相支持,互相 鼓励,并以对方的幸福为自己的满足; 3)
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 部队培训安全保密协议课件
- 社区服务边缘智能应用-洞察及研究
- 湖北省黄石市大冶市2024-2025学年七年级下学期期末考试数学试卷(含答案)
- 安徽省黄山市2024-2025学年高二上学期期末质量检测物理试卷(含答案)
- 部门安全培训需求课件
- 遨游汉字王国课件
- 基于循环经济理念的分条带钢边角料高值化再利用工艺创新图谱
- 基于代谢组学的前列康片多靶点作用机制网络图谱构建
- 培养基配方迭代与专利壁垒下的中小企业研发困境
- 国际标准体系下高强浇注料出口认证壁垒突破与质量追溯体系重构
- 辅警综合知识和能力素质考试试题(含答案)
- 网络文明培训课件
- 2025年三类人员安全员C证继续教育题库及参考答案
- 急性肾小球肾炎
- 工程管理面试题目及答案
- DB65 T8038-2025 好住房建设技术标准
- 2025秋人教版(2024)八年级上册英语一学期教学计划
- 工贸企业企业安全检查表
- 2025年理赔专业技术职务任职资格考试(理赔员·车险理赔)历年参考题库含答案详解(5套)
- 2025年科创板开通考试试题及答案
- 脊柱骨折护理查房
评论
0/150
提交评论