



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
quality control of construction enterprises the construction quality is the life of the building works, the social focus of attention. the project in the construction process in order to ensure the quality of the project, strict quality management, which will play an important role in co-ordinating the construction process, to promote enterprise technological progress and optimization of building construction management. the construction quality of the product is related to the interests of the masses and public safety. therefore, construction companies must be responsible to the state and the people, the future generations. spirit, earnestly enhance the quality of sense of responsibility, from all aspects of the construction process, all aspects of the implementation of the responsibility for quality to ensure the quality of the construction project.first ,a quality management 1.a quality management system is not perfect. the current construction project quality management system is gradually reforming the old system based on perfect, with the imprint of the era of planned economic system marked more or less, there is still a witch hunt, political status of the doors . the resulting partial closure of the management and internal supervision system, it is difficult to implement a strict and impartial quality supervision, is not conducive to the establishment of an effective constraint mechanism. some government departments, law enforcement ineffective, resulting in industry, local protectionism, departmental protectionism can not be effectively curb, which often results in the protection of a backward, so that the quality of the project to be greatly affected. 2. the construction enterprise awareness of the law is weak. construction law of the peoples republic of china and its relevant laws and regulations and technical standards promulgated and implemented, not only clear the responsibilities and obligations of the construction enterprises, but also a clear operating procedures and specifications of construction enterprises in the engineering, quality management. some construction companies due to weak legal consciousness, the legal concept of weakening in the construction activities, violation of rules, not according to the drawings, do not follow the order of construction, improper technical measures, and even cut corners, and the resulting poor quality, and quality accidents have occurred. 3.the market access control is lax. market access system is not only conducive to the orderly management of the construction market, but also to participate in the construction of the parties to be controlled from the overall quality is to ensure that an important part of the quality of the project can not be ignored. some localities and departments, the market access system for management oversight false qualification of ability or low ability of highly qualified irregularities in the construction enterprise, or the existence of undocumented construction, by the permit to sell photos, ultra provisions of the contract, or engage in private transactions to evade market management, etc., will inevitably pose a serious threat to the quality of construction projects, thus affecting the effectiveness of the quality supervision and management of construction projects. 4, the construction and management issues. many engineering quality problems are often caused by the construction and management. for example: not familiar with the drawings, blind construction drawings without a hearing, and the hasty construction; not according to the drawings. of the hinged steel access liangzuo cheng simply supported continuous beam, etc., do not regulate the construction of the related construction and acceptance. such as in-situ concrete structure according to the provisions of the location and method of any facilities to work sewing, etc.; construction in accordance with the relevant operational procedures; lack of basic knowledge of the structure, construction and reckless. such as prefabricated reinforced concrete beam upside down installation.second, to improve the quality of the project to be strict six off 1, strictly control market access. the government should better market access. to a rigorous examination of the construction enterprises have the necessary qualifications of registered capital, specialized technical personnel, technical equipment in line with national requirements. must have the appropriate level of qualification and performance with the construction requirements to have sufficient technical capacity and the level of equipment, and engaged in construction activities within the scope of license in the level of qualification and put an end to the illegal immigrant, leapfrog contract engineering. strict engineering materials procurement. engineering materials of engineering construction material conditions and quality of the material is the basis of the quality of the project. therefore, the quality of procurement and use of engineering materials must meet the standard requirements. approach the material and equipment to rigorous testing. engineering materials to enter the site. must have product certification, quality assurance, and should meet the design requirements; need to retest testing of building materials must be qualified by the re-examination in order to use; project the use of imported materials are required to meet appropriate quality standards and holds a commodity inspection issued by the commodity inspection authorities certificates. should also pay attention to the design, construction process on the reasonable selection of materials, components and parts, semi-finished and can not mix. 2. engineering drawings off. the construction of a project is first of all construction drawings, design, design of a direct impact on the overall quality of the project. so be sure to selection and qualification of design units, but also to design funding. under the conditions of market economy, market competition, of course, can not be a little less design funding to hire individuals, or personal design in order to avoid quality problems in the design, but also pay attention to some design units in order to design fees overcharged intentionally increase the amount of material and improve project cost, and good construction design drawings off to prevent causing the project not yet built, quality issues from the womb. 3, project quality supervision and customs. establish and improve project quality supervision and to inform the system to enhance the transparency of the supervision and law enforcement, project quality supervision and truly become the sunshine supervision. the establishment of the predictability, service quality monitoring mode to achieve the organic combination of services and law enforcement. the establishment of the acts of supervision and physical supervision of both the supervision and operation mechanism, and an extension of the quality acts to the parties to the project construction supervision to achieve from a single physical supervision. change the mode of supervision, based on day-to-day supervision will be random checks as project quality supervision and inspection of the main ways. in order to ensure the effectiveness and authority of government supervision, the supervisory authority should continue to improve the quality and level of supervision of the supervision team. 4.engineering, quality control off. schedule control, we must implement in order to ensure that the total duration of the target segment control, dynamic control. during project implementation should be based on the situation after the change, the premise does not affect the total schedule, on schedule in a timely manner to amend, adjust. material supply and payment of progress payments in a timely manner to ensure the quality of the project. 5. quality control, strict material quality. materials to meet national standards (including environmental standards) and design requirements, strict implementation of the materials and acceptance system. to ensure the quality of the main structure. the quality of the main structure related to the overall project quality and safety, related to each of the lives and safety, therefore, must ensure that the quality of the main structure. great importance decorative quality. decorated stage in the construction, we must overcome quality defects, improve the detail treatment to be jumped in the decorative standards, must be innovative and features. grasp the key parts of the construction. 6, project completion and acceptance of customs. completion and acceptance, is the last building on the basis of a program is the final check of the engineering design, quality summary. when the acceptance, it is necessary to strictly enforce the country, issued by the army engineering acceptance criteria itemized acceptance assessment. acceptance of quality concrete can be taken to see measured. view, focusing on the view on the data and the original records are complete, whether or not to meet the acceptance criteria; mortar and stick concrete test block, component strength meets the design specifications; indoor and outdoor decoration is up to standard, whether the roof leaks, toilet, kitchen water seepage, the balcony down the pan of water, plumbing, sanitary facilities joints to take the water, the ground floor, roof cracking and other quality defects. measured, field measurement, measured on the basis of engineering, the main project, structure, influential parts and special technical requirements.third, the increased management around the clock next to the supervisor for every site management requirements to achieve five ground: that is, the eye ground, often arrive at the scene of the construction, see more of the construction drawings, familiar with the design which are important parts; hand diligence, and found that often a mind to deal with what issues should have a record; tuiqin, often to the scene around; mouth ground for the construction team often prone to quality problems often reminded, the construction team should always jiaodi; brain ground familiar with the drawings, use their brains to think of measures to ensure the quality of the project. required to do the work, the depth strict, quasi, small and real. next to the important parts of or have special requirements for the site during construction, the supervising engineer shall be 24 hours valet supervisor, identify problems in time. the test block extraction, production to meet the requirements, or even personally sampling; workers operating standard measurement of supervision after the feeding stage material. found that the quality problem, promptly notify the construction team rectification and eliminate hidden
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 铁塔基站维护安全知识培训课件
- 知识产权金融专题培训课件
- 空域资源动态分配-洞察及研究
- 钻戒基础知识培训内容
- 钻头基本知识培训内容
- 钻井安全生产培训课件
- 知识产权法律培训通知课件
- 知识产权检察培训课程课件
- 2025年宠物智能设备应用测试题及答案
- 知识产权基础培训内容课件
- 中电联理论试卷A(无答案)
- 钢质防火门安装施工方法
- 红岩优秀读后感800字5篇
- 优化物理教学策略的思考(黄恕伯)
- GB/T 26358-2022旅游度假区等级划分
- GB/T 25146-2010工业设备化学清洗质量验收规范
- GB/T 14825-1993农药可湿性粉剂悬浮率测定方法
- GB/T 12008.7-2010塑料聚醚多元醇第7部分:黏度的测定
- 文化政策与法规(第一课)
- 最全最好的血液净化课件资料
- 寻找消失的滇缅路:松山战痕课件
评论
0/150
提交评论