GB50300-2001建筑工程施工质量验收统一标准(英文版)_第1页
GB50300-2001建筑工程施工质量验收统一标准(英文版)_第2页
GB50300-2001建筑工程施工质量验收统一标准(英文版)_第3页
GB50300-2001建筑工程施工质量验收统一标准(英文版)_第4页
GB50300-2001建筑工程施工质量验收统一标准(英文版)_第5页
已阅读5页,还剩44页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1 UDC GBGB 中华人民共和国国家标准中华人民共和国国家标准 National Standard of the Peoples Republic of China P GB 50300-2001 建筑工程施工质量验收统一标准建筑工程施工质量验收统一标准 Unified standard for constructional quality acceptance of building engineering Issued on:2001-07-20 Implemented as of:2002-01-01 The Ministry of Construction of the PRC Jointly Issued by The State Bureau of Quality and Technical Supervision 本英文版为内部资料,仅供参考,以中文 版为准。 The Chinese version of standards has precedence to their English translations which are only for internal reference. GB 503002001 1 Notice of Issuing the National Standard “Unified standard for constructional quality acceptance of building engineering” Jian Biao 2001 No. 157 Relevant departments of the State Council, construction departments of provinces and autonomous regions, construction committees of municipalities directly under the Central Government, construction committees of cities directly under State planning, Xinjiang Construction Troops, all related institutes, As per the “Notice of Issuing the 1998 Formulation and Amendment Plan for National Standards on Engineering Construction (second batch)” (Jian Biao 1998 No. 244), the “Unified standard for constructional quality acceptance of building engineering”, which was revised jointly by appropriate organizations with the Ministry of Construction playing the leading role, and subject to the joint review of relevant departments, has been approved to become a national standard with the code number GB 50300-2001, to be implemented as of January 1, 2002. In this standard, articles 3.0.3, 5.0.4, 5.0.7, 6.0.3, 6.0.4 and 6.0.7 are mandatory articles, which must be executed in a strict manner. The former GBJ 300-88 “Unified standard for quality inspection and assessment of building and installation engineering” shall be annulled at the same time. The Ministry of Construction shall be responsible for the administration of this standard, the Chinese Building Science Research Institute shall be responsible for the specific interpretation, and the Standard and Ration Research Institute of the Ministry of Construction shall organize the publishing and issuance by the Chinese Building Industry Publishing House. The Ministry of Construction of the Peoples Republic of China July 20, 2001 GB 503002001 2 PREFACE This standard is compiled pursuant to the “Notice of Issuing the 1998 Formulation and Amendment Plan for National Standards on Engineering Construction (second batch)” (Jian Biao 1998 No. 244) of the Ministry of Construction, by the Chinese Research Institute of Building Science with joint efforts of appropriate organizations including the Project Construction Quality Supervision Division of the Chinese Building Industry Association. During compilation of this standard, the compilation group made extensive investigation and study, summed up the practical experience of our country in the construction quality acceptance of building engineering, adhered to the guiding ideology of “separate acceptance and assessment, strengthen acceptance, improve measures and perform in-process control”, and widely solicited comments from appropriate organizations. The draft was reviewed and finalized in October 2000 by the Ministry of Construction. This compilation is to combine the codes for construction and acceptance of building engineering and the standards for inspection and assessment of engineering quality to form a new system of engineering quality acceptance codes, aiming to unify the acceptance methods, quality standards and procedures. This standard defines the unified guidelines for the compilation of construction acceptance codes for each discipline of building engineering, and the quality standards, contents and procedures for unit works. Construction site quality management and quality control requirements are added for building engineering. The sampling scheme requirement is proposed for the quality inspection of inspection lots. The standard has defined the division of sub-unit and sub-portioned works in the construction quality acceptance of building engineering, and the witness sampling and sample testing in relation to safety and major utilization functions of building engineering. The codes for acceptance of construction quality for each discipline in construction works must be applied in combination with this standard. This standard will likely be subject to partial revision, the information and content of which will be published in the “Standardization for Project Construction” magazine. In this standard, articles highlighted in bold letters are mandatory articles, which must be executed in a strict manner. In order to improve the quality of this standard, all users of this standard are requested to pay attention to accumulating data and summing up experience in the course of executing the standard. In case of need for revision and supplement identified, please send your comments and appropriate data to the National Center of Quality Supervision and Inspection of Building Engineering at the Chinese Research Institute of Building Science (address: 30 East Sanhuan Road, Beijing, 100013) for reference in the future w w w . b z f x w . c o m GB 503002001 3 revision. Principal compilation organization: Chinese Research Institute of Building Science Participating organizations: Project Construction Quality Supervision Division of the Chinese Building Industry Association National Center of Quality Supervision and Inspection of Building Engineering Beijing Municipal Quality Supervision Division of Building Engineering Beijing Municipal Construction Group Company Limited Tianjin Municipal Quality Supervision and Administration Division of Building Engineering Shanghai Municipal Quality Supervision Division of Construction Projects Shenzhen Quality Supervision and Inspection Division of Construction Projects Sichuan Huashi Group Corporation Shaanxi Building Engineering Corporation The PLA Engineering Qua;ity Supervision Division Main draftspersons: WU songqin GAO Xiaowang HE Xinhua BAI Shengxiang XU Youlin GE Hengyue LIU Guoqi WANG Huiming ZHU Mingde YANG Nanfang LI Zixin ZHANG Hongxun LIU Jian The Ministry of Construction July 2001 w w w . b z f x w . c o m GB 503002001 4 CONTENTS 1. General Provisions5 2. Glossary5 3. Basic Provisions7 4. Division for Quality Acceptance of Building Engineering9 5. Quality Acceptance of Building Engineering10 6. Procedures and Organizations for Building Engineering Quality Acceptance11 Appendix A Inspection Records for Quality Management at Construction Site13 Appendix B Division of Portioned (Sub-portioned) Works and Itemized Works of Building Engineering14 Appendix C Division of Exterior Works21 Appendix D Quality Acceptance Records for Inspection Lots22 Appendix E Quality Acceptance Records for Itemized Works23 Appendix F Quality Acceptance Records for Portioned (Sub-portioned) Works24 Appendix G Final Quality Acceptance Records for Unit (Sub-unit) Works25 Explanation of Wording in This Standard30 GB 503002001 5 1 General Provisions 1.0.1 This standard is formulated with a view to strengthen the quality management of building engineering, unify the quality acceptance of building engineering, and guarantee the engineering quality. 1.0.2 This standard is applicable to the acceptance of construction quality of building engineering, and serves as a unified guideline for the development of codes for project construction quality acceptance by each discipline in construction projects. 1.0.3 This standard is developed in accordance with the current laws, regulations and administrative standards of the state, and relevant technical standards. The codes for acceptance of construction quality for each discipline in construction works must be applied in combination with this standard. 2 Glossary 2.0.1 building engineering Various technical work and completed physical works in terms of planning, survey, design, construction and completion carried out for newly built, rebuilt or expanded house buildings and auxiliary structure facilities. 2.0.2 quality of building engineering Summary of characteristics reflecting compliance of the building engineering with relevant standards or contractual agreements, including all its explicit or implicit capabilities in respect of safety, functionality, durability performance and environmental protection. 2.0.3 acceptance Based on the self quality inspection and assessment of building engineering by the construction contractor, participating units of building activities to jointly conduct sampling quality re-validation of the inspection lot, item, portion and unit works, and make confirmation in written form in accordance with pertinent standards as to whether GB 503002001 6 the building engineering has reached the acceptable level. 2.0.4 site acceptance Conducting inspection on the materials, components, accessories and equipment that enter the construction site in accordance with relevant standards, and making confirmation as to whether the products have reached the acceptable level. 2.0.5 inspection lot Objects for inspection consisting of samples in certain amount, which are produced under the same production conditions or summarized in the specified manner for inspection use. 2.0.6 inspection Activities conducted to measure, check and test the properties of the inspection item, and to compare the results with standard stipulations so as to determine whether each property is acceptable. 2.0.7 evidential testing Testing conducted under the supervision of the supervision unit or the owner, in which appropriate personnel of the construction contractor take samples at the site and send them to a testing unit with relevant qualification. 2.0.8 handing over inspection Activity in which both the accepting party and the party that has completed the construction make confirmation by joint inspection as to whether the construction can be proceeded with. 2.0.9 dominant item An inspection item in building engineering that plays a decisive role in safety, health, environmental protection and public interest. 2.0.10 general item An inspection item other than dominant items. 2.0.11 sampling inspection An inspection in which a certain number of samples are randomly taken by the GB 503002001 7 inspection lot from the inspection items of materials, components, accessories and equipment that enter the site or of building engineering, according to the specified sampling scheme. 2.0.12 sampling scheme Quantity and method determined according to the characteristics of the inspection item. 2.0.13 counting inspection An inspection method by which, in the samples taken, certain property of each individual is recorded or the number of defects in each individual is calculated. 2.0.14 quantitative inspection An inspection method by which, in the samples for sampling inspection, certain quantitative property of each individual is measured. 2.0.15 quality of appearance Visual quality of engineering revealed by means of observation and necessary measuring. 2.0.16 repair To take corrective measures for any part of engineering that is not in conformity with standards. 2.0.17 rework Measures of re-fabrication and re-construction taken for non-conforming engineering parts. 3 Basic Provisions 3.0.1 Quality management at the construction site shall be accompanied or supported by relevant construction technical standards, complete quality management system, construction quality inspection system and comprehensive construction quality level assessment system. GB 503002001 8 For quality management at the construction site, inspection and records can be made according to the requirement of Appendix A. 3.0.2 Construction quality control for building engineering shall be exercised in accordance with the following stipulations: 1. Main materials, half finished products, finished products, building components and accessories, apparatuses and equipment to be used in building engineering shall be subject to site inspection. Products involved in safety and functions shall be subject to re-inspection in compliance with acceptance codes of engineering quality of each discipline, and to the inspection and approval of supervision engineers (owners technical responsible personnel). 2. Each construction step shall be subject to quality control in accordance with the construction technical standards, and each construction step shall be inspected after its completion. 3. Hand-over inspection shall be conducted between interrelated disciplinary categories of work, with inspection records properly established. It is not allowed to proceed to the succeeding construction step until the preceding step has been inspected and approved by supervision engineers (owners technical responsible personnel). 3.0.3 The construction quality of building engineering shall be subject to acceptance inspection as required below: 1. The construction quality of building engineering shall be in compliance with the stipulations of this standard and acceptance codes of relevant disciplines. 2. Construction of building engineering shall meet the requirements of the engineering survey and design documents. 3. All the members participating in the quality acceptance of building engineering shall possess appropriate qualifications. 4. Acceptance inspection of engineering quality shall be conducted on the basis of the construction contractors own inspection and assessment. 5. Before concealing of concealed works, the construction contractor shall notify relevant units to carry out the acceptance inspection, and establish acceptance documents. 6. Test coupons, test pieces and relevant materials involved in structural GB 503002001 9 safety shall be subject to witness sampling test as required. 7. The quality of inspection lots shall be subject to acceptance according to dominant items and general items. 8. Important portioned works involved in structural safety and utilization functions shall be subject to sample testing. 9. Units undertaking the witness sampling test and structural safety test shall possess respective qualifications. 10. The appearance quality of engineering shall be subject to site inspection by acceptance personnel and confirmed jointly. 3.0.4 The sampling scheme for the quality inspection of inspection lots shall be chosen from the following according to the characteristics of inspection items: 1. Sampling schemes of measuring, counting, or measuring-counting. 2. Single sampling, double sampling and multiple sampling schemes. 3. According to the situation of production continuity and production control stability, the adjusted sampling scheme may also be adopted. 4. For important inspection items, when a simple and quick inspection method is adopted, the full quantity inspection scheme can be selected. 5. Inspection schemes that are proved effective by practical experience. 3.0.5 During formulation of the sampling scheme for inspection lots, the production partys risk (probability for erroneous judgment ) and the utilization partys risk (probability for neglecting judgment ) can be specified as follows: 1. Dominant item: both and corresponding to the acceptable quality level should not exceed 5%. 2. General item: corresponding to the acceptable quality level, should not exceed 5% and should not exceed 10%. GB 503002001 10 4 Division for Quality Acceptance of Building Engineering 4.0.1 In the quality acceptance, the building engineering shall be divided into unit (sub-unit) works, portioned (sub-portioned) works, itemized works and inspection lot. 4.0.2 Division of unit works shall be defined according to the following principles: 1. A building or structure that possesses independent construction conditions and is capable of forming independent utilization functions shall be taken as a unit work. 2. For a unit work with a large building scale, the part that is capable of forming independent utilization functions can be taken as sub-unit work. 4.0.3 Division of portioned works shall be defined according to the following principles: 1. Division of portioned works shall be defined according to the disciplinary nature and locations in building. 2. When the portioned work is large or complex, it can be divided into several sub-portioned works according to the category of materials, characteristics of construction, construction procedures, disciplinary system and classification. 4.0.4 Itemized works shall be divided according to their major labor category, material, construction process and equipment classification. Portioned (sub-portioned) works and itemized works of building engineering can be divided in accordance with Appendix B of this standard. 4.0.5 Itemized works may consist of one or several inspection lots, and the inspection lots may be divided according to the floor, construction section and deformation joint considering the requirements of construction and quality control as well as disciplinary acceptance. 4.0.6 Exterior works may be divided into unit (sub-unit) works according to the disciplinary category and the engineering scale. Exterior unit (sub-unit) works and portioned works may be divided in accordance with Appendix C of this standard. GB 503002001 11 5 Quality Acceptance of Building Engineering 5.0.1 The acceptable quality of inspection lots shall be in compliance with the following: 1. The quality of dominant items and general items is deemed acceptable by sample testing. 2. Complete construction operation basis and quality inspection records are available. 5.0.2 The successful quality acceptance of itemized works shall be in compliance with the following: 1. All the inspection lots contained in the itemized works are in compliance with the stipulation

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论