全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
bc1556f0b91a71758f83598ae5b9aa91.pdf.docFIRST CONCURRENT EVALUATION OF FOREST DEVELOPMENT AGENCY PROJECTS SANCTIONED UNDER NATIONAL AFFORESTATION PROGRAMME (NAP) SCHEMETERMS AND CONDITIONS FOR SELECTED AGENCIES1. The commencement of the evaluation of the project will be reckoned from the date of receipt of first instalment.2. The grant shall be utilized only for the purpose for which it has been sanctioned, and shall not be diverted for any other purpose.3. No part of the grant shall be utilized for purchase of equipment and establishment of a permanent nature.4. The grantee shall furnish regular periodical reports about the progress of the project and such other reports and statements as may be prescribed or called for by the Government from time to time.5. The grantee shall be open to inspection by an officer of the Central/State Government or any other person nominated by the Central/State Government.6. The grantee shall endeavor to maintain standards of services and those of administrative, financial and procedural nature.7. The grantee shall maintain its account for the financial year corresponding to that of the Central Government.8. The expenditure accounts of the grant duly audited shall be maintained properly and separately as distinct from expenditure accounts of other activities and submitted to the Government. They shall always be open to check by an officer of the Central/State Government of their representatives. They shall always be open to a test check by the Comptroller of Auditor General of India at his discretion.9. When the Central Government have reasons to believe that the sanctioned money is not being utilized for the approved purpose, the payment of grants may be stopped and the earlier grants recovered with interest. In such a case the defaulting organization shall have to refund the grant together with interest.10. The evaluation work shall be completed within four months of the date of commencement. The final report in the prescribed format available at Ministrys website (www.enfor.nic.in/naeb/nap/naeb.htm) in six printed copies will be submitted along with a soft copy on a CD/DVD. The release of the final installment would be subject to the timely completion of the evaluation and submission of the report.11. The funds will be released in three installments as follows :a. 40% as 1st installment on receipt of acceptance letter and bond from evaluator.b. 30% as 2nd installment on receipt of final report.c. 30% as 3rd installment on acceptance of final report.12. All costs are included in the remuneration. The remuneration fixed for the evaluation is final and cannot be enhanced under any circumstances. NAEB will not take any liabilities accruing in the course of the evaluation.Sampling Design :-13. The evaluator will compile information of socio-economic profile and forest/afforestation details of all NAP JFMCs in the FDA, and randomly select statistically significant number of JFMCs for in-depth study based on a stratified-random sample. The whole design should be statistically sound, so that there is least human-bias. The sampling design shall be described in detail, in addition to the information in the prescribed format for evaluation report.Consultation with FDA official :-14. Before the start and on the conclusion of the field study, the evaluator will hold elaborate discussions with the chairperson and chief executive officer of the FDA, and record the summary of discussions along with the time of the meetings in the Evaluation Report to be submitted to NAEB.Grading of the Project :-15. The evaluator will provide a clear consistent, concise and coherent justification for assigning scores (1-10) for the various parameters listed for grading the FDA Project.Interactive Meetings :-16. The evaluator, if requested by NAEB (or, an agency on behalf of NAEB) in this regard, shall present the findings of the Evaluation Report in a workshop/seminar/meeting organized for this purpose. Travel expenses and sitting fee as per scale/rates prescribed by NAEB will be paid to the evaluator. In the event of the evaluator failing to attend the meeting/workshop/seminar to present their Report without cogent and sufficient reasons, NAEB will withhold future payment, if any, for the Evaluati
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 特种轮胎全自动生产线投资项目分析报告
- 纸花工艺品投资建设项目建议书
- 雨衣套装投资项目可行性研究报告
- 中考语文复习名家名篇文学智慧呈现
- 中考语文复习复习之常见错误指导
- 中考复习文化常识与人们心灵走向
- 中考语文复习考点图解详解
- 2024年海南省中职教师技能大赛-电子商务运营 赛项规程
- 中考语文复习古诗词背诵方法
- 中考语文复习影视作品视角探讨
- 蜱虫的预防与治疗
- 多多买菜可行性分析报告
- 提升医院内科诊疗水平提高内科医疗服务
- 医疗器械生产过程中的标识管理培训
- 医院维稳综治演练计划书
- 农耕研学基地可行性方案
- 小学综合实践活动《我是小小发明家》-完整版课件
- 机场大巴线路可行性报告
- 《太仓港口文化》课件
- 公司年度诉讼案件分析报告
- 野外生存安全教育培训课件如何预防野生动物伤害和草木中毒
评论
0/150
提交评论