


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CONTRACT合同 Contract No 合同号: AG11-01644/46/47-01 Date日期: Sept. 08, 2012 Page页数: 3/3The Buyers:Dongying ABO New Energy Technology Co., Ltd. 东营奥博新能源科技有限公司The Sellers:Herbert Arnold GmbH & Co. KGThe Buyers agree to buy and the Sellers agree to sell the following goods on terms and conditions as set forth below:买卖双方同意按下列条款由卖方售出下列商品:1. Item, Description, Quantity, Unit Price and Amount 项目、商品名称、数量、单价和总价Item项目Description 商品名称Quantity数量Unit Price (EUR)单价 (欧元)Amount (EUR)总价 (欧元)1Cracking-off Machine,71/61.29 自动热割设备1 setEURO 4651778.00EURO 4651778.002Pumpnipple Fusing Machine, 3080/1200/450排气尾管焊接设备1 setEURO 1331665.96EURO 1331665.963Forming machine, NC56/162/KGT玻璃-金属封接设备1 setsEURO 4074538.83EURO 4074538.83Sum EURO10057982.79CIF Dongying2. Time of Shipment: 12 months after receipt of prepayment. 装运期限: 收到预付款后12个月3. Port of loading: Europe 装运口岸: 欧洲港口 4. Port of Destination:Dongying 目的口岸: 东营 5. Terms of Payment: 付款方式:(1)Prepayment: 30% by T/T within 30 days after contract confirmation预付款: 合同确认后30天内电汇30%预付款(2)Balance payment: Balance by irrevocable L/C payable at sight telegraphically, which has to be opened 3 months before the shipment date余款:开立不可撤消的即期信用证,货物出运前的3个月前电开。Beneficiary: Herbert Arnold GmbH & Co. KGWeilstrasse 6, D-35781 Weilburg, GermanyTel: 0049 6471 9394-0Fax: 0049 6471 2065Re: T/T (关于:电汇)银行帐号和信息: Bank nameKreissparkasse Weilburg Address: Odersbacher Weg 1, D-35781 Weilburg, GermanyBIC: HELADEF 1 WEIIBAN: DE 58 511 519 190 100 081 082Account no.: 100 081 082Bank code: 511 519 196Others 其它(1)If the buyers can not make T/T and open L/C in time, the shipment will have to be delayed accordingly. 如果没有按时电汇付款和开立信用证,交货期将相应地延长。(2)The sellers will provide about 1020 days commissioning, and the buyers will pay the transportation cost in Qingdao and all accommodation etc for 3-7 sellers engineers (including 37 standard rooms in hotel and all foods etc) in Qingdao. Details are according to actual the number of sellers commissioning engineers and actual schedule, the buyers will pay all transportation and accommodation for commissioning engineers in Qingdao. 卖方提供1020天左右的安装调试,买方提供37位卖方工程师在青岛的交通费用及膳宿费用等(包括37个宾馆标准间和食物)。具体根据实际安装调试工程师数量和日程,买方支付卖方安装调试工程师全部本地交通和食宿费用等。7Warranty 保质期:1 year from day of acceptance but starting latest 100 days after day of shipment from Germany whichever comes first. 自验收起(但不晚于德国装期开始100天)1年内。8.The seller has to inform the buyer to visit sellers site for equipment acceptance 30 days before the seller finish equipment production. The buyer has to provide the seller with enough quantity raw materials which the seller will suggest for acceptance test. After equipment acceptance, the buyer will make signature for acceptance and the seller will arrange shipment immediately. 卖方完成设备加工,提前30天通知买方前往卖方验货。买方提供由卖方建议需要的足够数量原材料给卖方用于验收试验。经验货合格后,买方人员签字后卖方立即安排发货。9. All concerned quotation information belongs to the contract attachment, whichshall have the same legal force with the Contract.所有有关报价内容属于本合同附件,与本合同具有同等的法律效力。10.All disputes shall be finally settled under the Rules of Arbitration and Conciliation of the International Arbitral Centre (VIAC) of the Austrian Federal Economic Chamber in Vienna by one arbitrator appointed in accordance with these rules. The language to be used in the arbitral proceedings shall be English.所有争议最终通过维也纳奥地利联邦经济委员会的国际仲裁中心(VIAC)的仲裁和调解规则解决。根据这些规则任命的仲裁方。语言使用英语。11.Both parties hereto may revise or supplement through negotiation matters not mentioned herein, complementation agreement has same legal efficiency same as the contract.本合同未尽事宜,经本合同双方协商一致后,可以签订补充协议,补充协议与本合同具有同等法律效力。12.The contract is closed under the rules of United Nations Convention on Contracts for the International Sale of Goods, CISG).本合同适用于为国际货物销售合同的联合国公约规则。13.本合同一式二份,双方各执一份,双方签章后即具有法律效力。This contract is in duplicate, each side holds one original. After signature, the contract is of legal effect.Sellers Buyers卖方 买方Herbert Arnold GmbH & Co. KG Dongying ABO New Energy Technology Co., Ltd. 东营奥博新能源科技有限公司Weilstrasse 6,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 机车冲刺测试题及答案
- 关汉卿考试题及答案
- 二建考试题真题及答案
- 税务智税考试试题及答案
- 中医康复理疗考试试题及答案
- 家电公司过失责任追究办法
- 云南省昆明市官渡区六校2026届化学高三上期末考试试题含解析
- 农业发展集团筹建方案(3篇)
- 高层小区沉降观测方案(3篇)
- 餐厅选址运营方案模板(3篇)
- 抗诉申请书模板
- 2025至2030年中国建筑结构胶粘剂数据监测研究报告
- 2025年中国儿童型开喉剑喷雾剂市场调查研究报告
- 地效翼船研发制造项目申请备案可行性研究报告
- 心境情感障碍的护理查房
- 《紧急停止按钮操作培训》课件
- 广东职业技能等级证书养老护理员高级养老护理员评分记录表
- 学校食堂6T管理培训
- DZT0181-1997水文测井工作规范
- 腰椎间盘突出症课件(共100张课件)
- 《专业导论》课程教学大纲
评论
0/150
提交评论