




已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Thanks for using our productsBefore operating it, please read this manual thoroughlyContents1、Use and Outline(1)2、Technical Specification(2)3、Installing & Operation instruction(2)4、Attention(7)PART Use and OutlineWTZK02 Series Transformer Temperature Controller (BWY02 Series Transformer Temperature Controller), be applicable to measure the temperature of transformer oil or other liquid, airs and steam. And when the temperature that measured is reached or exceeded the initial value it will send out the contact-point signal. It is suitable for taking measurement and control of oil temperature in transformer that over 500KVA.The outline show in figure 1.The maximum depth inserted 260Figure 1 WTZK-02 Series Transformer Temperature Controller Outline DrawingPART TECHNICAL SPECIFICATION1. Measuring Scope: 0100(or 20120)2. Indicative Accuracy: 1.5grade3. Switch Quantity and Function3.1 Switch Quantity: 23.1 Setting Accuracy: 33.2 Switch Difference: 62 (3.3 Rated Power: AC220V/1.5A4. Bulb Dimension: 141505. Installing Dimension of Bulb: Male Thread M2726. Installing Dimension of Gauge: 3 Apertures 6 144210(Figure 1)7. The switch setting in the opening state, Standard perset value of switch: First limit: 55(close) Second limit: 80(close)If users need to change the value of set points, please take off the meter cover, and follow the temperature setting process to work(show in Installing & Operation instruction 4),after this close the cover.PART INSTALLING & OPERATION INSTRUCTION1. Installation of WTZK-02Directly fix the thermoregulalator on the board using 3 bolts(M6),link the capillary between the thermoregulator and the convertor. the capillary must be fixed in each alternation 300mm to avoid be damaged. And the left capillary must be rolled to 300mm annularity and using the same fixed type.2. Installation of bulbYou must adjust the input current to suitable value according the output current of the current transformer (Ih), ,then filling the hot transformer oil to the seat hole on the transformer, loose the fix bolts of the convertor. And separate the convertor and the joint.Place the bulb insert into the joint till the transformer oil overflow from the seat hole, then adjust the direction of the convertor, screw down the fix bolt to ensure the oil in the seat hole are totally separate from the outside(details see drawing 2).PipeHollowing boltBulbOilPaddingTransformer shellSealed matCapillaryTie-in Transformer oil level lineInstalling SeatFigure 2 Connection Of Bulb3. Wiring (1) Screwing loose the setting bolt, pull out plug. Show in figure 3Sealed boltSealedloopMatPlugSealed matThe cable sealed loopMeterFigure 3(2)connect the cable line as follows, show in figure 4The cable sealed loopConnection polePlug shell WTZK-02TemperatureControllerConnectionDrawingThe cable setting boltMeterConnection lableFigure 4(3) According to the (1) to recover, and screw down the cable setting bolt. 4. The temperature enactment procedure,show in figure 5(5)When the pointer indicate 60,the K1 works immediately.The red recording pointer(3)Multimeter(3)5(1)Turn-on the meter widdershinsEnactment knob K1 Instruction:(1)If the temperature of K1 is 60,fixes the meter vertically, turn-on the meter widdershins. Liquid temperature 60(2) Turn to move to set the knob(4) K1 to 60 scale line.(3)Connect the multi-meter to the meter, than output K1.160mm(4) Put the bulb in the liquid which temperature is larger than 60,and be sure that the inserting depth160mm. (5) Look the pointer , when the pointerFigure 5 nicety at 60 scale line moment, turn-on the multimeter of K1 lead ,at the same time show that work. (6) Look at the (5) item, if something difference between multimeter and meter, adjusting the enactment knob, repeat the (4)、(5) item till in-phase. (7) Close the cover, screw down it clockwise. (Notice:When cover it,should be let the red recording pointer on the indicating pointers top right corner.)(8) Turn the knob of the center of the glass widdershins, make the red recording pointer close to the indicating pointer.PART ATTENTION1.The temperature which display during the store or transportation is not the exactly temperature, verifying must according to JJG310-2002.2、In the process of wiring and installing the thermoregulator, please handle it with care and operate strictly to the instructions。3. If reset the temperature, fixes the instrument on the instrument Board first, then according to the process to work. 4. All the water in the seat bole must be cleaned before filling the transformer oil into it, and must sealing t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 项目招聘人员合同范本
- 进口铁路运输合同范本
- 黄石鄂州签订合同协议
- 装修水电保养合同范本
- 转让出售油罐合同范本
- 维护保养合同转包协议
- 酒店住宿租赁合同协议
- 过期红糖购销合同范本
- 购货退货合同范本模板
- 美团买菜分拣合同范本
- 2025年秋人教版(2024)初中数学八年级第一学期教学计划及教学进度表
- 2025年全国计算机等级考试三级网络技术模拟题及答案
- 软件行业基础知识培训课件
- GB 46039-2025混凝土外加剂安全技术规范
- 传染病医院质量控制检查标准表
- 卷烟零售户培训课件
- 刑事诉讼法案例课件
- 2025年杭州市上城区九堡街道社区卫生服务中心招聘编外4人笔试备考试题及答案解析
- 2025年煤矿从业人员安全培训考试题库及答案
- 医院净化空调系统基本知识
- 内蒙锡林郭勒盟卫生系统招聘考试(护理学专业知识)题含答案2024年
评论
0/150
提交评论