全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
PMP认证考试试题精选四61. At what point inthe project is there the most risk of project failure? A. Close out B. Development C. Implementation D. Concept ANS: D Reference: PMBOK 2.1.2 62. Phase exits, kill points and stage gates are used for what purpose? A. Planning the next stage in the project B. Communicating milestones to stakeholders C. Determining if the project should continue into the next phase D. Measuring earned value ANS: c Reference: PMBOK 2.1.1 63. A complex project will fit best in what type of organization? A. Functional B. Cross-functional C. Matrix D. Balanced ANS: c Reference: PMBOK 2.3.1 64. Which knowledge area involves organizational theory as a tool/technique? A. Communications Management B. Cost Management C. Risk Management D. Human Resource Management ANS: D Reference: PMBOK 9.1.2.3 65. Human Resource Managenrnt is tightly linked to which other knowledge area? A. Cost Management B. Risk Management C. Communications Management D. Time Management ANS: c Reference: PMBOK 9.1 66. Which of the following is not considered a constraint in Organizational Planning? A. Recruitment practices B. Collective bargaining agreenrnts C. Preferences of the project management team D. Expected staff assignments ANS: A Reference: PMBOK 9.1.1.3 67. Outputs from Organizational Planning include all of the following except: A. Staffing Management Plan B. Organization Chart C. Project Team Directory D. Role and Responsibility Matrix ANS: c Reference: PMBOK 9.1.3 68. Inputs to Staff Acquisition include all of the following except: A. Staffing Management Plan B. Resource Histogram C. Staffing pool description D. Recruitment practices ANS: B Reference: PMBOK 9.2.1 69. Which of the following is not an input to Team Development? A. Project Plan B. Staffing Management Plan C. Performance Reports D. Reward and recognition systems ANS: D Reference: PMBOK 9.3.1 70. Cost Budgeting is defined as: A. The estimated total cost of the project when done B. Allocating the cost estimates to the individual work items C. Estimating the cost of the resources needed to complete project activities D. The sum of the approved cost estimates ANS: B Reference: PMBOK 7.3 71. The cost baseline is an output of what process? A. Cost planning B. Cost estimating C. Cost budgeting D. Cost control ANS: c Reference: PMBOK 7.3.3.1 72. The time phased budget that is used to measure and monitor cost performance is: A. The project budget B. The cost budget C. The cost baseline D. The cost estimate ANS: c Reference: PMBOK 7.3.3.1 73. Which knowledge area does not provide input into cost budgeting? A. Time B. Quality C. Scope D. Cost ANS: B Reference: PMBOK 7.3.1 74. At the beginning of a project you are asked for an order of magnitude budget. What type of budget estimate are you likely to use? A. Analogous B. Parametric modeling C. Bottom-up D. Detailed ANS: A Reference: PMBOK 7.3.2.1 75. The major process groups of project management are: A. Planning, control, initiation, closing, execution B. Monitoring, start up, execution, close out, planning C. Conceptual, demonstration, validation, development, production D. Feasibility, planning, design, production, close out ANS: A Reference: PMBOK 3.2 76. Project Stakeholder are: A. Anybody who is actively working on the project B. Individuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or successful project completion C. The plan sponsor, project manager, team members, client D. The customer ANS: B Reference: PMBOK 2.2 77. The Project Life Cycle: A. Defines the Product Life Cycle B. Has distinct phases that are the same for all projects C. Defines what work should be done in each phase D. Has gates that must be completed before moving onto the next phase of the project ANS: c Reference: PMBOK 2.1.3 1996 PMBOK 2.1.2 2000 78. In planning your resources for a new building project you are working with an engineering firm, a construction management firm and a general contractor. You are mindful that the general contractor will have to manage several sub-contractors over the next 9 months and that the structural and civil engineers will need to communicate frequently. You must select the best reporting relationships among the parties. This is an example of: A. Staffing requirements B. Communication planning C. Project interface planning D. Staffing management plan ANS: c Reference: PMBOK 9.1.1.1 79. As a Project Manager you havejust completed a 9-month project where you had accountability for the schedule, budget, team members and quality of the end product. You are up for your annual review and expect a bonus based on your perfonmnce What is not an area that you would expect to be rewarded for? A. Meeting 95% of your milestones on time B. Finding a way to use Jr. Level Engineers to complete tasks that Sr. Level Engineers were scheduled for C. Inspiring the team to work overtime due to an oversight in the scope plan D. Developing project managenrnt skills in a Jr. Project Manager who was assigned to the project ANS: c Reference: PMBOK 9.3.2.3 80. You have inherited a project that is in trouble. The team members are spread out inS states, the schedule is behind by 20%, the former project manager alienated the team and there is no conmunication plan. The first issue you must work on is building a cohesive team to get the project back on track. Which of the following is not a technique that you would use in team development: A.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年辽宁公安司法管理干部学院辅导员招聘备考题库附答案
- 2026年曹妃甸职业技术学院单招职业适应性测试题库附答案
- 2026年新疆天山职业技术大学单招职业倾向性考试模拟测试卷附答案
- 2026年闽北职业技术学院单招职业倾向性考试题库附答案
- 2026年云南旅游职业学院单招职业技能考试题库附答案
- 2026年辽宁建筑职业学院单招(计算机)测试备考题库必考题
- 2026年山西铁道职业技术学院单招(计算机)考试参考题库必考题
- 2026年黑龙江公安警官职业学院辅导员招聘备考题库附答案
- 2026年吉林工程职业学院单招职业适应性考试题库附答案
- 2026年大连职业技术学院单招职业适应性考试模拟测试卷附答案
- 国家开放大学2025年秋《思想道德与法治》终考大作业试卷1参考答案
- GB 14930.2-2025食品安全国家标准消毒剂
- 节日主题班会课件 国家公祭日新
- 棉花栽培学课件 第三节 棉花栽培的生物学基础2
- 渝建竣表格新表2优质资料
- GB 20286-2006公共场所阻燃制品及组件燃烧性能要求和标识
- DB11 2075-2022 建筑工程减隔震技术规程
- 麦克斯韦方程组市公开课获奖课件
- 金坛区苏科版五年级上册劳动《11创意时钟(一)》课件
- 沥青路面施工旁站监理记录表多篇
- 白内障的术前检查及术后预测
评论
0/150
提交评论