




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
PMP认证考试试题精选四61. At what point inthe project is there the most risk of project failure? A. Close out B. Development C. Implementation D. Concept ANS: D Reference: PMBOK 2.1.2 62. Phase exits, kill points and stage gates are used for what purpose? A. Planning the next stage in the project B. Communicating milestones to stakeholders C. Determining if the project should continue into the next phase D. Measuring earned value ANS: c Reference: PMBOK 2.1.1 63. A complex project will fit best in what type of organization? A. Functional B. Cross-functional C. Matrix D. Balanced ANS: c Reference: PMBOK 2.3.1 64. Which knowledge area involves organizational theory as a tool/technique? A. Communications Management B. Cost Management C. Risk Management D. Human Resource Management ANS: D Reference: PMBOK 9.1.2.3 65. Human Resource Managenrnt is tightly linked to which other knowledge area? A. Cost Management B. Risk Management C. Communications Management D. Time Management ANS: c Reference: PMBOK 9.1 66. Which of the following is not considered a constraint in Organizational Planning? A. Recruitment practices B. Collective bargaining agreenrnts C. Preferences of the project management team D. Expected staff assignments ANS: A Reference: PMBOK 9.1.1.3 67. Outputs from Organizational Planning include all of the following except: A. Staffing Management Plan B. Organization Chart C. Project Team Directory D. Role and Responsibility Matrix ANS: c Reference: PMBOK 9.1.3 68. Inputs to Staff Acquisition include all of the following except: A. Staffing Management Plan B. Resource Histogram C. Staffing pool description D. Recruitment practices ANS: B Reference: PMBOK 9.2.1 69. Which of the following is not an input to Team Development? A. Project Plan B. Staffing Management Plan C. Performance Reports D. Reward and recognition systems ANS: D Reference: PMBOK 9.3.1 70. Cost Budgeting is defined as: A. The estimated total cost of the project when done B. Allocating the cost estimates to the individual work items C. Estimating the cost of the resources needed to complete project activities D. The sum of the approved cost estimates ANS: B Reference: PMBOK 7.3 71. The cost baseline is an output of what process? A. Cost planning B. Cost estimating C. Cost budgeting D. Cost control ANS: c Reference: PMBOK 7.3.3.1 72. The time phased budget that is used to measure and monitor cost performance is: A. The project budget B. The cost budget C. The cost baseline D. The cost estimate ANS: c Reference: PMBOK 7.3.3.1 73. Which knowledge area does not provide input into cost budgeting? A. Time B. Quality C. Scope D. Cost ANS: B Reference: PMBOK 7.3.1 74. At the beginning of a project you are asked for an order of magnitude budget. What type of budget estimate are you likely to use? A. Analogous B. Parametric modeling C. Bottom-up D. Detailed ANS: A Reference: PMBOK 7.3.2.1 75. The major process groups of project management are: A. Planning, control, initiation, closing, execution B. Monitoring, start up, execution, close out, planning C. Conceptual, demonstration, validation, development, production D. Feasibility, planning, design, production, close out ANS: A Reference: PMBOK 3.2 76. Project Stakeholder are: A. Anybody who is actively working on the project B. Individuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or successful project completion C. The plan sponsor, project manager, team members, client D. The customer ANS: B Reference: PMBOK 2.2 77. The Project Life Cycle: A. Defines the Product Life Cycle B. Has distinct phases that are the same for all projects C. Defines what work should be done in each phase D. Has gates that must be completed before moving onto the next phase of the project ANS: c Reference: PMBOK 2.1.3 1996 PMBOK 2.1.2 2000 78. In planning your resources for a new building project you are working with an engineering firm, a construction management firm and a general contractor. You are mindful that the general contractor will have to manage several sub-contractors over the next 9 months and that the structural and civil engineers will need to communicate frequently. You must select the best reporting relationships among the parties. This is an example of: A. Staffing requirements B. Communication planning C. Project interface planning D. Staffing management plan ANS: c Reference: PMBOK 9.1.1.1 79. As a Project Manager you havejust completed a 9-month project where you had accountability for the schedule, budget, team members and quality of the end product. You are up for your annual review and expect a bonus based on your perfonmnce What is not an area that you would expect to be rewarded for? A. Meeting 95% of your milestones on time B. Finding a way to use Jr. Level Engineers to complete tasks that Sr. Level Engineers were scheduled for C. Inspiring the team to work overtime due to an oversight in the scope plan D. Developing project managenrnt skills in a Jr. Project Manager who was assigned to the project ANS: c Reference: PMBOK 9.3.2.3 80. You have inherited a project that is in trouble. The team members are spread out inS states, the schedule is behind by 20%, the former project manager alienated the team and there is no conmunication plan. The first issue you must work on is building a cohesive team to get the project back on track. Which of the following is not a technique that you would use in team development: A.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 资本市场融资路径-洞察及研究
- 班级心理健康教育活动案例
- 电力行业安全生产教育课件
- 亮化消防工程施工方案
- 课程活动促销活动方案策划
- 管理咨询实战实效落地方案
- 宠物用品销售咨询方案范文
- 牙齿咨询问题设计方案
- 家居在线营销方案
- 黑龙江路面沥青施工方案
- 九师联盟2026届高三10月联考英语试卷(含答案)
- 餐饮托盘技能培训
- 眉山市发展和改革委员会市项目工作推进中心公开选调事业人员的考试参考题库及答案解析
- 遗传咨询考试题库及答案
- 2025湖南能源集团电投公司社招39人笔试模拟试题及答案解析
- 吉林省吉林市第四中学校2024-2025学年高一上学期9月第一次月考生物学试卷(含答案)
- 【益模科技】2025汽车零部件行业数字化转型白皮书
- 2024年齐齐哈尔医学院公开招聘辅导员笔试题含答案
- 6.我们神圣的国土《辽阔的国土》(教案)-部编版道德与法治五年级上册
- 胖东来服务管理办法
- 《义务教育数学课程标准(2022年版)》测试题+答案
评论
0/150
提交评论