




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
PMP认证考试试题精选四61. At what point inthe project is there the most risk of project failure? A. Close out B. Development C. Implementation D. Concept ANS: D Reference: PMBOK 2.1.2 62. Phase exits, kill points and stage gates are used for what purpose? A. Planning the next stage in the project B. Communicating milestones to stakeholders C. Determining if the project should continue into the next phase D. Measuring earned value ANS: c Reference: PMBOK 2.1.1 63. A complex project will fit best in what type of organization? A. Functional B. Cross-functional C. Matrix D. Balanced ANS: c Reference: PMBOK 2.3.1 64. Which knowledge area involves organizational theory as a tool/technique? A. Communications Management B. Cost Management C. Risk Management D. Human Resource Management ANS: D Reference: PMBOK 9.1.2.3 65. Human Resource Managenrnt is tightly linked to which other knowledge area? A. Cost Management B. Risk Management C. Communications Management D. Time Management ANS: c Reference: PMBOK 9.1 66. Which of the following is not considered a constraint in Organizational Planning? A. Recruitment practices B. Collective bargaining agreenrnts C. Preferences of the project management team D. Expected staff assignments ANS: A Reference: PMBOK 9.1.1.3 67. Outputs from Organizational Planning include all of the following except: A. Staffing Management Plan B. Organization Chart C. Project Team Directory D. Role and Responsibility Matrix ANS: c Reference: PMBOK 9.1.3 68. Inputs to Staff Acquisition include all of the following except: A. Staffing Management Plan B. Resource Histogram C. Staffing pool description D. Recruitment practices ANS: B Reference: PMBOK 9.2.1 69. Which of the following is not an input to Team Development? A. Project Plan B. Staffing Management Plan C. Performance Reports D. Reward and recognition systems ANS: D Reference: PMBOK 9.3.1 70. Cost Budgeting is defined as: A. The estimated total cost of the project when done B. Allocating the cost estimates to the individual work items C. Estimating the cost of the resources needed to complete project activities D. The sum of the approved cost estimates ANS: B Reference: PMBOK 7.3 71. The cost baseline is an output of what process? A. Cost planning B. Cost estimating C. Cost budgeting D. Cost control ANS: c Reference: PMBOK 7.3.3.1 72. The time phased budget that is used to measure and monitor cost performance is: A. The project budget B. The cost budget C. The cost baseline D. The cost estimate ANS: c Reference: PMBOK 7.3.3.1 73. Which knowledge area does not provide input into cost budgeting? A. Time B. Quality C. Scope D. Cost ANS: B Reference: PMBOK 7.3.1 74. At the beginning of a project you are asked for an order of magnitude budget. What type of budget estimate are you likely to use? A. Analogous B. Parametric modeling C. Bottom-up D. Detailed ANS: A Reference: PMBOK 7.3.2.1 75. The major process groups of project management are: A. Planning, control, initiation, closing, execution B. Monitoring, start up, execution, close out, planning C. Conceptual, demonstration, validation, development, production D. Feasibility, planning, design, production, close out ANS: A Reference: PMBOK 3.2 76. Project Stakeholder are: A. Anybody who is actively working on the project B. Individuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or successful project completion C. The plan sponsor, project manager, team members, client D. The customer ANS: B Reference: PMBOK 2.2 77. The Project Life Cycle: A. Defines the Product Life Cycle B. Has distinct phases that are the same for all projects C. Defines what work should be done in each phase D. Has gates that must be completed before moving onto the next phase of the project ANS: c Reference: PMBOK 2.1.3 1996 PMBOK 2.1.2 2000 78. In planning your resources for a new building project you are working with an engineering firm, a construction management firm and a general contractor. You are mindful that the general contractor will have to manage several sub-contractors over the next 9 months and that the structural and civil engineers will need to communicate frequently. You must select the best reporting relationships among the parties. This is an example of: A. Staffing requirements B. Communication planning C. Project interface planning D. Staffing management plan ANS: c Reference: PMBOK 9.1.1.1 79. As a Project Manager you havejust completed a 9-month project where you had accountability for the schedule, budget, team members and quality of the end product. You are up for your annual review and expect a bonus based on your perfonmnce What is not an area that you would expect to be rewarded for? A. Meeting 95% of your milestones on time B. Finding a way to use Jr. Level Engineers to complete tasks that Sr. Level Engineers were scheduled for C. Inspiring the team to work overtime due to an oversight in the scope plan D. Developing project managenrnt skills in a Jr. Project Manager who was assigned to the project ANS: c Reference: PMBOK 9.3.2.3 80. You have inherited a project that is in trouble. The team members are spread out inS states, the schedule is behind by 20%, the former project manager alienated the team and there is no conmunication plan. The first issue you must work on is building a cohesive team to get the project back on track. Which of the following is not a technique that you would use in team development: A.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 农业生态种植技术成果转化机制创新创业项目商业计划书
- 养鸡场智能养殖系统创新创业项目商业计划书
- 全国电力安全知识培训课件
- 公司春节平安大检查方案
- 二零二五年度北京车牌买卖全程服务合同
- 2025版建筑业企业工程验收人员劳动合同范本
- 二零二五版新能源项目三方合作协议合同
- 2025版BIM技术支持下的建筑工程项目管理服务合同
- 二零二五年度房产租赁合同-含家具家电租赁与装修设计
- 二零二五年度商铺买卖及租赁合同
- 第一章《空间向量与立体几何》单元综合检测卷(基础A卷)(解析版)
- 设计思维方法与表达(高职艺术设计)PPT完整全套教学课件
- 非麻醉患者镇静镇痛原则
- 港口陆域设施
- 模板施工方案技术交底
- 摊铺机使用说明rp953e-903e操作手册
- GB/T 1871.1-1995磷矿石和磷精矿中五氧化二磷含量的测定磷钼酸喹啉重量法和容量法
- GB/T 13880-1992半挂牵引车牵引座的安装
- GB 6675.12-2014玩具安全第12部分:玩具滑板车
- 食物中毒的急救治课件
- 电厂内业资料表格
评论
0/150
提交评论