项目经理教程第九周.ppt_第1页
项目经理教程第九周.ppt_第2页
项目经理教程第九周.ppt_第3页
项目经理教程第九周.ppt_第4页
项目经理教程第九周.ppt_第5页
已阅读5页,还剩89页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Project Management 9. Performance Management,Week 9,Performance management,Once you have selected a project,Once you have selected a project And planned it,Once you have selected a project And planned it And hired the team,Once you have selected a project And planned it And hired the team And started the work,Once you have selected a project And planned it And hired the team And started the work How do you stay on track?,How do you even know if you are progressing to plan?,Gray & Larson, 2006, Ch 13.,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,What is a Project Monitoring System?,It involves determining what data to collect, how, when an who will collect the data; analysis of the data; and reporting progress,Monitoring System,Gather,Analyse,Report,You need to know what information is needed to satisfy you and your stakeholders.,Think about the Information System Structure,What data are collected?,current status of project (schedule and cost),remaining cost to compete project,date that project will be complete,potential problems to be addressed now,out-of-control activities requiring intervention,Cost and/or schedule overruns & their reasons,Forecasting overruns at time of completion,What data are collected?,Collecting data and analysis who will collect project data? how will data be collected? when will the data be collected? who will compile and analyze the data? who will receive the reports? how will the reports be transmitted? when will the reports be distributed?,Photo by germanium,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Progress Report Format,Progress since last report Current status of project Schedule Cost Scope Problems and issues since last report Actions and resolution of earlier problems New variances and problems identified Corrective action planned,How long should a project status report be?,1 page,/en-us/templates/TC011417231033.aspx,/idbusiness/statusreport.htm,.au/info_status_report.php,More info,/profcomm/writing/samples/stat_samp_s1.htm,/knowhow/subsets/sample-templates/StatusReports.doc,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Project Control Process,The process of comparing actual performance against plan to identify deviations, evaluate courses of action, and take appropriate corrective action,Pensiero,Project Control Steps,Set and baseline a plan,Measuring progress and performance,Comparing the plan to the facts,Taking Action,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Monitoring Time Performance,Monitoring Time Performance,Tools used to catch negative variances from plan and communicate project schedule status:,Monitoring Time Performance,Tools used to catch negative variances from plan and communicate project schedule status: Tracking and baseline Gantt charts show expected, actual, and trend data for event duration performance,Figure 13.1 Baseline Gantt Chart (Gray & Larson, 2006, p414),Time,A Gantt Chart,Monitoring Time Performance,Tools used to catch negative variances from plan and communicate project schedule status: Tracking and baseline Gantt charts show expected, actual, and trend data for event duration performance Control charts plot the difference in scheduled time on the critical path with the actual point on the critical path,Figure 13.2 Project Schedule Control Chart (Gray & Larson, 2006, p415),A Control Chart,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Monitoring Systems Disparities,Picture by Pensiero,Time-Phase Baseline Plan,Picture by Pensiero,Corrects the failure of most monitoring systems to connect a projects actual performance to its schedule and forecast budget,Picture by Pensiero,Systems that measure only cost variances do not identify resource and project cost problems associated with falling behind or progressing ahead of schedule,Picture by Pensiero,Earned Value Cost/Schedule System An integrated project management system based on the earned value concept that uses a time-phased budget baseline to compare actual and planned schedule and costs,Picture by airgap,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Earned Value Management,What is Earned Value Management (EVM)?,What is Earned Value Management (EVM)? A project performance measurement technique that integrates scope, time, and cost data.,What is Earned Value Management (EVM)? A project performance measurement technique that integrates scope, time, and cost data. Given a baseline (original plan plus approved changes), you can determine how well the project is meeting its goals. You must enter actual information periodically to use EVM.,What is Earned Value Management (EVM)? A project performance measurement technique that integrates scope, time, and cost data. Given a baseline (original plan plus approved changes), you can determine how well the project is meeting its goals. You must enter actual information periodically to use EVM.,Terms to learn,PV,AC,EV,Planned Value,Actual Cost,Earned Value,CV,Cost Variance,SV,Schedule Variance,CPI,Cost Performance Indicator,SPI,Schedule Performance Indicator,(Also called the budget) This is that portion of the approved total cost estimate planned to be spent on an activity during a given period,PV,Planned Value,The total of direct and indirect costs incurred in finishing work on an activity during a given period,AC,Actual Cost,An estimate of the value of the physical work actually completed,EV,Earned Value,Earned value minus the actual cost. Shows the difference between the estimated cost of an activity and the actual cost of that activity,TABLE 13.1,CV,Cost Variance,Earned value minus the planned value. Shows the difference between the schedule completion of an activity and the actual completion of that activity,TABLE 13.1,SV,Schedule Variance,The ratio of earned value to actual cost and can be used to estimate the projected cost of completing the project. If the CPI is equal to 1 or 100% then the planned and actual costs are equal, or the costs are as budgeted. If the CPI is less than 1 or less than 100%, the project is over budget. If the CPI is greater than 1 or more than 100%, the project is under budget,CPI,Cost Performance Indicator,The ratio of earned value to planned value and can be used to estimate the projected time to complete the project. Similar to the CPI, an SPI of 1 or 100% means the project is on schedule. If the SPI is greater than 1 or 100% then the project is ahead of schedule. If the SPI is less than 1 or 100%, the project is behind schedule,SPI,Schedule Performance Indicator,TABLE 13.1,Quick EVM quiz,What can we say if CPI 1,Quick EVM quiz,What can we say if CPI 1,If the CPI is greater than 1 or more than 100%, the project is under budget,Quick EVM quiz,What is EV minus AC?,Quick EVM quiz,What is EV minus AC?,EV AC = SV Earned Value (what was done) Minus Actual Cost (what has been paid) = Schedule Variance,Scenario Example,“Purchasing & Installing Web Server” Duration 1 week, Budget $10,000.,Scenario Example,“Purchasing & Installing Web Server” Duration 1 week, Budget $10,000. PV Planned Value for that activity for that week = $10,000 AC Actual Cost suppose it actually took 2 weeks and cost $20,000. Assume $15,000 were incurred in week 1, and $5,000 in week 2. These costs are the actual costs for that activity each week EV Earned Value earned value after one week is $7,500. (10,000 * 75%) Example: CP829_Lecture_Week9_EarnedValue.xls,Scenario Example,Earned Value Chart for Project after 5-Months,Max Wideman,Rules for Earned Value Numbers,Negative numbers for cost and schedule variance indicate problems in those areas The project is costing more than planned or taking longer than planned CPI and SPI less than 100% indicate problems,Table 13.3 Interpretation of Indexes (Gray & Larson, 2006, p429),An alternative,Source: /release_burndown,Week 2 lecture,So, what do you do when your plan changes?,There are methods used to revise estimates of future project costs,EVM allows experts in the field to change original baseline durations and costs because new information tells them the original estimates are not accurate EVM uses actual costs-to-date plus an efficiency index to project final costs in large projects where the original budget is unreliable,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Developing an Integrated Cost/Schedule System,Compute,Calculate,Collect,Schedule,Resource plan,WBS,Budget,Plan,Monitor,Define the work using a WBS Scope Work packages Deliverables Organization units Resources Budgets,Develop work and resource schedules Schedule resource to activities Time-phase work packages into a network,Photo by shimonkey,Develop a time-phased budget using work packages included in an activity. Accumulate budgets (PV),At the work package level, collect the actual costs for the work performed (AC),Multiply percent complete times original budget (EV),Compute the schedule variance (EV-PV) and the cost variance (EV-AC),Figure 13.3 Project Management Information Systems Overview (Gray & Larson, 2006, p419),Integrated Cost/ Schedules,What is a Project Monitoring System Examples of Progress Reports What is the Project Control Process and why is it useful? How do I Monitor Time Performance The shortcomings of monitoring Systems Earned Value Management a silver bullet? Integrated Cost/Schedule System Project Baselines,Project Baselines,Week 4 lecture,a Baseline is an anchor point for measuring performance,Photo by _Robert C_ flickr,a planned cost and expected schedule against which actual cost and schedule are measured,Gold by ,a basis for cash flows and awarding progress payments,Photo by quaziefoto flickr,a summation of time-phased budgets (cost accounts as summed work packages) along a project timeline,Picture by Network Osaka flickr,What Costs Are Included in Baselines? Labor Equipment Materials Project direct overhead costs (DOC),Figure 13.14 Scope Changes to a Baseline (Gray & Larson

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论