全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
合同范本/建设工程合同 agreement of bot project this agreement is made and entered into by and between the government of_(hereinafter called b) represented by_(hereinafter called a) and _corporation, a company duly organized and existing under the laws of the peoples republic of china with its principal office at_(hereinafter called c). whereas, a and c concluded the memorandum concerning _project on the _and c had been given exclusive right from b to carry out investigation and implement _project (hereinafter called the project) by way of joint financing between c and b (so called bot). whereas, the loan agreement, guarantee agreement, letter of guarantee, etc. shall constitute integral components of this agreement. the projects installed capacity is _. now therefore, the parties hereby agree as follows: 1. definition and interpretation project means the planning, feasibility study, design and engineering, construction, equipping, completion, testing, commissioning and operation of the infrastructure project. project cost means the cost specified in clause 3. operation period means the period specified in clause 10.1 from the starting date of commercial operation of the infrastructure pletion date means the day upon which c certifies that the infrastructure project has successfully completed its testing and can start operation period. force majeure shall have the meaning specified in clause 16. project scope means the scope of supply and services of c in connection with the execution of the project as described in annex 2. site means the site for the infrastructure project including _, special roads, and other areas for construction as specified in annex 2. transfer date means the day following the last day of the operation period. new company means the company to be established between c and _entity as specified in clause 5. investment agreement means the agreement on mutual encouragement and protection of investment between the government of thepeoplesrepublic of china and the government of the _. exclusive right means the special power granted to c or new company in the memorandum, agreement and its annex. day means the solar calendar day. 2. the project 2.1 the project shall be named as _. 2.2 the infrastructure project is intended to be located at _. the exact locat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年养老护理员技能考核预测题库
- 心理学基础与应用2026年心理测试题库
- 2026年思政教育综合知识题库
- 2026年双减政策核心要义应知应会知识竞赛题库
- 2026年经济师岗位职业能力评估题目集
- 2026年市级品牌营销推广知识题库
- 2026年工作纪律常见问题知识竞赛
- 2026年环境监测技术与数据处理试题集
- 2026年急救知识普及竞赛试题及答案心肺复苏操作要点
- 2026年省级自然博物馆招聘笔试考点预测与解析
- 2025年北京市公务员笔试真题及答案
- 2026四川省遂宁经创投资集团有限公司招聘工作人员24名笔试模拟试题及答案解析
- 2026年广东省肇庆中学自主招生考试物理试卷真题(含答案详解)
- 2025年四川省党政领导干部政治理论水平考试(理论测试)历年参考题库含答案详解
- 驻定点屠宰场官方兽医工作制度
- 危重患者早期活动与康复护理
- 中国主动脉夹层诊疗指南(2025版)
- 高中英语教招题目及答案
- 叉车培训资料大全
- 福建省部分地市2026届高中毕业班第一次质量检测英语试题及答案
- 2026年时事政治测试题库及答案【有一套】
评论
0/150
提交评论