

全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
合同范本/建设工程合同 agreement of bot project this agreement is made and entered into by and between the government of_(hereinafter called b) represented by_(hereinafter called a) and _corporation, a company duly organized and existing under the laws of the peoples republic of china with its principal office at_(hereinafter called c). whereas, a and c concluded the memorandum concerning _project on the _and c had been given exclusive right from b to carry out investigation and implement _project (hereinafter called the project) by way of joint financing between c and b (so called bot). whereas, the loan agreement, guarantee agreement, letter of guarantee, etc. shall constitute integral components of this agreement. the projects installed capacity is _. now therefore, the parties hereby agree as follows: 1. definition and interpretation project means the planning, feasibility study, design and engineering, construction, equipping, completion, testing, commissioning and operation of the infrastructure project. project cost means the cost specified in clause 3. operation period means the period specified in clause 10.1 from the starting date of commercial operation of the infrastructure pletion date means the day upon which c certifies that the infrastructure project has successfully completed its testing and can start operation period. force majeure shall have the meaning specified in clause 16. project scope means the scope of supply and services of c in connection with the execution of the project as described in annex 2. site means the site for the infrastructure project including _, special roads, and other areas for construction as specified in annex 2. transfer date means the day following the last day of the operation period. new company means the company to be established between c and _entity as specified in clause 5. investment agreement means the agreement on mutual encouragement and protection of investment between the government of thepeoplesrepublic of china and the government of the _. exclusive right means the special power granted to c or new company in the memorandum, agreement and its annex. day means the solar calendar day. 2. the project 2.1 the project shall be named as _. 2.2 the infrastructure project is intended to be located at _. the exact locat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2026学年辽宁省盘锦市三上数学期末达标检测试题含解析
- 2025-2026学年吉林省长春市汽车经济技术开发区第二实验联盟三上数学期末统考试题含解析
- 2025-2026学年安徽省阜阳市三上数学期末检测模拟试题含解析
- 2024年将乐县三年级数学第一学期期末调研试题含解析
- 2025年执业药师考试考生真实反应试题及答案
- 自考行政管理专业发展前景试题及答案
- 自考行政管理课程评价试题及答案
- 2025年主管护师考试真题试题及答案
- 校园语文考试试题及答案
- 护理操作的细节与试题及答案
- 2025年水利工程师职称考试试题及答案
- 2025年四川省成都市青羊区中考数学二诊试卷
- 法院出庭授权委托书
- 2025年山东出版集团有限公司山东出版传媒股份有限公司招聘(192名)笔试参考题库附带答案详解
- 2025年四川省宜宾市第二中学校九年级二诊考试数学试题(原卷版+解析版)
- 《会计基础与实务》课件-项目五 登记会计账簿
- 2025年时事政治考题及参考答案(350题)
- 人教版三年级下册数学面积应用题基础篇【含答案】
- 深圳某旅游口岸施工组织设计
- 物料管理入门练习作业答案
- 学生活动场地借用流程
评论
0/150
提交评论