已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
12.6 19.2 25.1 783 ? OTIS - OECC ? ELEVATION PARAMETERS OF BUFFER CAR SIDECWT SIDE HEIGHT 600600 STROKE 210210 ? ? ? ? (1.75m/s) (1.75 m/s) RS=1700 OPH 2100* ? CH 2300* (CH+2)* 2 OHMIN=(CH+1750)*=4050 ? PARAP 900 ? 900 CARRUNBY=180 600 BHcwt=600 BCcwt=180 62 THE LAST GUIDE RAIL BRACKET POSITION THE FIRST GUIDE RAIL BRACKET POSITION 2350300 ? BOTTOM LEVEL TOP LEVEL 700? DRIVE CONTROLLERARO Hdrive (200) 1300 (300) 850200 ? CWTFH*=3045 SENSOR 73 Car_stand=641 K=6200 ? ? ADD A CARSIDE RAIL BRACKET 1100 PIT LADDER ? ? CAR AXIS ? ? ? =400 ? Perimeter beam for suspending equipment(By customer) 400 ? VENTILATION 400 198 526 =206 (366) 279 ? 699 38#-3,49#,51#,53#-3,58#-2, 59#-2,60#-3,61#62#,65#, 75#-3,76#-1,77#-2 ? HALL DOOR CUTOUT ? OTHERS HALL DOOR CUTOUT OP 800 OPH= 2100 OPH+130=2230 ? TOP LEVELE HALL DOOR CUTOUT OP+260=1060 D D 290 1600 VIEW D-D 1600 WALLTHK 120 D-D 20 105 =35 ? Grouting by others 1200 100 ? OP+260=1060 OP=800 OPH+130=2230 OPH=2100 Finished Floor ? Finished Floor ? A 1200 1030 1650 100 95 85 95 85 CTC=218 CTC=218 CTC=218 ? DETAIL Y 2.0T MACHINE 4x32KN CSB 2.0T MACHINE 3x43KN CSB 2.6T MACHINE 4x43KN CSB ? ? ? ? ? ? ? ? 50 ? STANDARD ? DETAIL X ?(?) GROUTING AFTER INSTALLATION (BY OTHERS) THKLD=75 3 ? STANDARD LINE ? FINISHED FLOOR =400 ? Perimeter beam for suspending equipment(By customer) 400 ? VENTILATION 400 198 526 =206 (366) 279 ? 699 50#,52#,58#-1,59#-1, 76#-2,77#-1 ? HALL DOOR CUTOUT ? OTHERS HALL DOOR CUTOUT OP 800 OPH= 2100 OPH+130=2230 ? TOP LEVELE HALL DOOR CUTOUT OP+260=1060 D D 290 1600 VIEW D-D 1600 WALLTHK 120 D-D 20 105 =35 ? Grouting by others 1200 100 ? OP+260=1060 OP=800 OPH+130=2230 OPH=2100 Finished Floor ? Finished Floor ? A 1200 1030 1650 100 95 85 95 85 CTC=218 CTC=218 CTC=218 ? DETAIL Y 2.0T MACHINE 4x32KN CSB 2.0T MACHINE 3x43KN CSB 2.6T MACHINE 4x43KN CSB ? ? ? ? ? ? ? ? 50 ? STANDARD ? DETAIL X ?(?) GROUTING AFTER INSTALLATION (BY OTHERS) THKLD=75 3 ? STANDARD LINE ? FINISHED FLOOR =206 ? CAR AXIS ? ? ? =400 ? Perimeter beam for suspending equipment(By customer) 400 ? VENTILATION 400 526 (366) ? ELEVATION (1.0 m/s) CW=1400 OP=800 HW=2000 HW1=1090HW2=910 HD=1860 CD=1300 DF=CD/2+350=1000 L7=210L6=390 CARDBG=1480+2 -0 CWTDBG=800+3 -0 157 75 25 56 CTC=218 62 62 OP+260=1060 185 E PARTS 56 48 L1 L3 L2 L4 290 HB C.C.C.C. T.C. H.W. PRS L.S. SEE DETAIL X ? “X“ ? E&I CW-46=1354 ? HOISTWAY PLAN HD=1860 DF+100=1100 48 185 machine center CW/2+130=830 Gov. center CW/2+88=788 CWT DEH CW/2+295.5=995.5 CAR DEH CW/2+89=789 CTC=218 HW1=1090HW2=910 HW=2000 L1 L3 L2 L4 ? TOP HOISTWAY PLAN CTCR=942 CWTDBG=800+3 05656 CTC 218 PESI PES(REFERENCE WWJSSS 5.3 A) ? U V L1 L3 L2 L4 PIT PLAN ? E PARTS 380560 CTCR=CW/2+152+CWTHK/2=942 CWTHK=180 20 30 58 1480 HW=2000 HW1=1090HW2=910 DF+100=1100 HD=1860 185 ? ? 265 300 CTC=218 CTC=218 CTC=218 ? 2.0T MACHINE 4x32KN CSB 2.0T MACHINE 3x43KN CSB 2.6T MACHINE 4x43KN CSB SEE DETAIL Y ? 1640 88 157 75 25 46 OP=800 OP+260=1060 ? HALL DOOR CUTOUT ? OTHERS HALL DOOR CUTOUT OP 800 OPH= 2100 OPH+130=2230 ? TOP LEVELE HALL DOOR CUTOUT OP+260=1060 D D 290 1600 VIEW D-D 1600 WALLTHK 120 D-D 20 105 =35 ? Grouting by others 1200 100 ? OP+260=1060 OP=800 OPH+130=2230 OPH=2100 Finished Floor ? Finished Floor ? A 1200 1030 1650 100 95 85 95 85 ? ? ? ? ? ? ? ? 50 ? STANDARD ? DETAIL X ?(?) GROUTING AFTER INSTALLATION (BY OTHERS) THKLD=75 3 ? STANDARD LINE ? FINISHED FLOOR =206 ? CAR AXIS ? ? ? =400 ? Perimeter beam for suspending equipment(By customer) 400 ? VENTILATION 400 526 (366) ? ELEVATION (1.0 m/s) CW=1400 OP=800 HW=2000 HW2=1090HW1=910 HD=1860 CD=1300 DF=CD/2+350=1000 L6=210L7=390 CARDBG=1480+2 -0 CWTDBG=800+3 -0 157 75 25 56 CTC=218 62 62 OP+260=1060 185 56 48 L1 L3 L2 L4 290 HB C.C.C.C. T.C. H.W. PRS L.S. SEE DETAIL X ?“X“ ? E&I CW-46=1354 ? HOISTWAY PLAN HD=1860 DF+100=1100 48 185 machine center CW/2+130=830 Gov. center CW/2+88=788 CWT DEH CW/2+295.5=995.5 CAR DEH CW/2+89=789 CTC=218 HW2=1090HW1=910 HW=2000 L1 L3 L2 L4 ? TOP HOISTWAY PLAN CTCR=942 CWTDBG=800+3 05656 CTC 218 PESI PES(REFERENCE WWJSSS 5.3 A) ? U V L1 L3 L2 L4 PIT PLAN ? 380560 CTCR=CW/2+152+CWTHK/2=942 CWTHK=180 20 30 58 1480 HW=2000 HW2=1090HW1=910 DF+100=1100 HD=1860 185 ? ? 265 300 CTC=218 CTC=218 CTC=218 ? 2.0T MACHINE 4x32KN CSB 2.0T MACHINE 3x43KN CSB 2.6T MACHINE 4x43KN CSB SEE DETAIL Y ? 1640 88 157 75 25 46 OP=800 OP+260=1060 ? HALL DOOR CUTOUT ? OTHERS HALL DOOR CUTOUT OP 800 OPH= 2100 OPH+130=2230 ? TOP LEVELE HALL DOOR CUTOUT OP+260=1060 D D 290 1600 VIEW D-D 1600 WALLTHK 120 D-D 20 105 =35 ? Grouting by others 1200 100 ? OP+260=1060 OP=800 OPH+130=2230 OPH=2100 Finished Floor ? Finished Fl
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年江西冶金职业技术学院单招职业适应性测试必刷测试卷附答案
- 2026年山西省临汾市单招职业倾向性考试题库新版
- 2025福建莆田市忠湄轮渡有限责任公司招聘4人笔试历年参考题库附带答案详解
- 2025浙江绍兴市城发阿波罗科技有限公司项目制产业人员第五批招聘13人笔试历年常考点试题专练附带答案详解试卷2套
- 2025浙江吴上兴鲜(湖州)农产品贸易有限公司招聘笔试历年参考题库附带答案详解
- 2025广东中山桂兴公司招聘工作人员笔试及人员笔试历年备考题库附带答案详解试卷2套
- 2025山东东营金茂铝业高科技有限公司招聘22人笔试历年典型考点题库附带答案详解试卷2套
- 2025四川省医致祥商贸有限公司配送员招聘1人笔试历年备考题库附带答案详解试卷2套
- 2025中华联合财产保险股份有限公司社会招聘笔试历年典型考点题库附带答案详解试卷2套
- 2025年及未来5年中国建筑装饰材料行业市场调查研究及投资前景预测报告
- tisax信息安全管理
- 旋风除尘器结构与性能
- 《血管活性药物静脉输注护理》标准解读
- 危急值的报告制度与流程
- 《孤独的小螃蟹》阅读测试(含答案)
- 家庭经济困难认定和家庭经济状况核对授权书暨具体资助项目申请表表(义务)
- 钙钛矿太阳能电池文献总结报告
- 四大管道焊接施工方案
- 宠物犬鉴赏与疾病防治知到章节答案智慧树2023年石河子大学
- 餐饮连锁企业运营管理手册
- T-GDC 126-2021 汽车零部件仓储安全管理规范
评论
0/150
提交评论