施耐德供应商管理流程_第1页
施耐德供应商管理流程_第2页
施耐德供应商管理流程_第3页
施耐德供应商管理流程_第4页
施耐德供应商管理流程_第5页
已阅读5页,还剩40页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Schneider Supplier Management,SAM,SQM,SPM,Supplier Approval Module (SAM),SSQM Process for Evaluating Suppliers,SAM: Process Flow,Request in SSRM!,Record in SSRM(VENUS)!,Record in SSRM(VENUS)!,Record in SSRM(VENUS)!,Technological & design audits,SSRM , Schneider Supplier Relationship Management,SAM: Supplier Assessment,Supplier Assessment Questionnaire Identify general strengths & weaknesses Commodity based Each location requires a new evaluation Identified experimented purchasing assessors designed by the commodity manager to do and complete After physical visit at supplier Scoring based on Objective Evidence Specific IF-THEN scoring Recommended or not!,Global Compact Sustainable Development,Global Compact,Global Compact : Global Compact Chart,Global Compact is a chart signed by the companies engaging them to respect 10 principles,Global Compact,SAM: Functional Audits,Detailed analysis of supplier Mandatory for quality & supply chain Made by certified auditors (experience + training) Objective Determine if supplier has the ability to meet our needs Identify functional strengths & weaknesses Identify improvement areas Identify General Capability Level Additional audits if needed Technological, design,Quality,Logistic,SAM: Team Decision,“Does Supplier have ability to meet our needs?” All functions must agree Each has Veto authority Not Consensus voting If “Approved” - Team approves If “Rejected” - Team rejects If “Conditional Approved” - Improvement plan is required If “Conditional Rejected” - Improvement plan and 2nd audit are required,Green 绿色 Yellow 黄色 Orange 橙色 Red 红色,Decision for SAM color (Quality) SAM 审核颜色确定 (质量),Green: 0 reject, 0 condition, Total Score =18,Original: 2 rejects, 4 conditions Total Score =10,Red: 3 rejects, 5 conditions Total Score 10,Yellow: 0 reject, 2 conditions Total Score =15,SAM,SAM,Decision of SAM audit,Red supplier: Not start or stop business Orange supplier: not start or no new business given, improvement within 6 months. Yellow supplier: Within one year, must move to Green. If not move to orange Green supplier: Key supplier are reviewed once per 1 - 2 years (normally),Commodity Manager to decide If “NO” - the process is stopped If “YES”: =S= to list all weak/improvement points (Request for action plan) Supplier to fill in the actions to RAP =S= to Review & Approve the RAP Supplier to implement the RAP,SAM: Decision to Improve,SAM: Improvement Plan,Must be short term (up to 1 year) Schneider must verify improvements At Supplier location Supplier must improve Or lose “Conditional” rating Improvement plan is documented in SSRM (to be implemented) A full audit is necessary to remove CONDITIONAL REJECTED status,SAM: Supplier Approval,Results stored electronically in SSRM Database Supplier Assessment Quality & Supply Chain Audits Other Audits (if any) Improvement Plans (to be implemented) Results available across all =S= Approval - Supplier has been evaluated, and should have capability to meet our needs (For a specific location/commodity),SAM,Supplier Qualification Module (SQM),SSQM Process for Evaluating Goods & Services from Suppliers,The SQM Qualification Team must include (at a minimum): Engineering (Product Responsible) Quality Purchasing Manufacturing (Logistics or Industrial) Additional actors for the Qualification Team may include: Advanced Manufacturing Supply Chain Advanced Quality Marketing Safety, Health & Environmental Corporate Quality,SQM - Key Points:,Project Introduction: Description of project/activity Information sharing Rough Schedule Start of PPEP Form,This is the first step in the SQM process - When the request is initiated to qualify a good from a supplier. At this step, the Qualification Team meets together to discuss the request Meeting or conference call Review general characteristics of the good Complex design? New tool? Same material? Same process? Output of this step is an estimate for the qualification requirements and schedule,SSQM: SQM Process Flow,Determine Requirements: All Functional Requirements Must Consider: Part to Specification Supplier Process Capability End-Product Functionality Internal Manufacturing Process Record Requirements in PPEP Form,This is the second step in the SQM process - The definition of the qualification requirements At this step, the Qualification Team works seperately to define each functional requirements Quality determines control plan, process FMEA, traceability, Gauge R&R Engineering determines component & finished product functional testing Manufacturing determines pre-production build acceptance criteria etc The Qualification Team then has a second meeting to combine all functional requirements, and list these requirements in the PPEP form,SSQM: SQM Process Flow,Supplier Review: Communicate Requirements to supplier Before supplier makes sample parts And better, before quotation,This is the third step in the SQM process - Reviewing the qualification requirements with the supplier It is critical that the supplier understand all of our functional requirements Before the supplier fabricates samples, or starts to develop tooling. Supplier must know our expectations before any investment is made - to be certain that the good will meet our needs The deliverables that the supplier must complete are defined at this meeting First Article Inspection Report, Control Plan, etc The supplier must commit to providing their deliverables,SSQM: SQM Process Flow,Complete Actions: DO THE WORK!,This is the fourth step in the SQM process - Completing the qualification requirements This is where the Supplier and the Qualification Team insure that all of the requirements are completed, and satisfy the acceptance criteria.,SSQM: SQM Process Flow,Qualification OK?: Question: Are all functions OK with supply? All 4 considerations utilized? Ready for production?,Production cannot be initiated until after the entire Qualification Team agrees that each requirement has been satisfied This does not impact pre-production - pre-production builds are necessary to validate several of the requirements This does require that before a part can be considered QUALIFIED that all the requirements have been ACCEPTED by the Qualification Team,SSQM: SQM Process Flow,PRODUCTION: Document results in PPEP form Place production orders Retain information in component quality records at plants PPEP Form Test Results .,Production signals the end of the SQM process The Qualification Team is disbanded, and the qualification project is closed The Quality Management System for a facility determines the quality oversight for the good,SSQM: SQM Process Flow,New Part/Product Evaluation Plan (PPEP) Summary Sheet,What is a PPEP form?,A purchasing project tool to select all the necessary part functional requirements, all the actors in order to qualify a supply and a process.,When to establish a PPEP?,At the start of any purchasing project, normally before the supplier choice and better before the quotation step.,Dont forget to read the SAM audits before choice a supplier.,What is a purchase project?,A use of a New Supplier A Raw Material Change A Supplier Process Change (eg: Cr6 Cr3) A Supplier Location Change A Design Change An Outsourcing Insourcing A Different Schneider Manufacturing Location A Part Non-Conformances improvement (like corrective action),Who establish a PPEP form?,The qualification team including at least the following functions with a veto right: Engineering (Product Responsible) Quality Purchasing Manufacturing (Logistics or Industrial),Who is responsible to start the PPEP process?,The project leader,Who is responsible of the PPEP application?,The Quality Department.,Who sign the the PPEP?,The supplier before to start the project and the quality responsible at the end.,Who validate the PPEP?,The qualification team,Links between SSQM and PMP,Supplier Performance Module (SPM),SSQM Process for Monitoring Performance of Suppliers,Supplier Performance Module,The SSQM-SPM Supplier evaluation process is a combination of daily and regularly scheduled events; Daily: Communication & resolution of Supplier Delivery, Quality and Critical Issues by Supplier Quality Engineer and Upstream Flow Supervisor Monthly: Compile metric data for Key Suppliers by Supplier Leader and Supplier Quality Management Engineer and Supplier Supply Chain Management Engineer Quarterly Communicate metric performance vs. target to Key Suppliers by Supplier Leaders Yearly Annual reviews with Key Suppliers on current year performance and future year requirements by Supplier Leader and Market Manager,Today globally all the suppliers are monitored with the SPM. But each Country are more focus on some categories of suppliers, such as; The Key & Challenger suppliers The main active suppliers The most impacting suppliers . Additionally, Corporate Purchasing and Operating Division Purchasing also has the responsibility to monitor “Global” Suppliers across Schneider. The Country organizations must provide performance data to Corporate Purchasing for these “Global” Suppliers,Definition of Suppliers to be Monitored,Supplier Performance Module,There are 5 minimum Supplier performance metrics required by the Supplier Quality Policy and SSQM; Delivery Delivery of Product vs. Lead-Time Quality Quality of Product Delivered Productivity Achievement of Productivity Targets Administrative Response to Schneider Requests Development Completion of Improvement Plans But only 3 are used today,The External Supplier Service Rate (ESSR),(The quantity of order lines on time / the quantity of order lines expected in the same month) * 100 (%) After common acknowledgement between the supplier and Schneider on the delivery day or according the standard lead time (No more than 7 days before and ) no one day after Only for mass productio

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论