已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
The Piston-type Steam pressure reducing valve Instruction manual Configurations: 1Lower cover7Piston ring13Diaphragm 2Body8Cylinder 14Adjusting spring3Main valve spring9Secondary valve spring15Valve cap 4Main valve seat 10Upper bonnet16Adjusting screw5Main valve11Secondary valve17Top cap 6Piston 12Secondary valve seatMain performance and uses: Y43H is principally used in steam pipe, it can reduce the inlet pressure to a certain outlet pressure you need by adjusting the spring, when the flow and the pressure of the inlet varies, the outlet pressure can also remain within a certain range by the strength of the medium itself, but the differential pressure of the inlet and outlet must be equal or greater than 0.2MPa. Technical parameter:DN(LB)Pressure test (MPa)Pressure-adjust range (MPa)ApplicableTemperatureShell test Seat test Import pressureexport pressureexport deviation3007.55.52.50.51.60.7250Working principal: When the pressure reducing valve leaves the factory, the adjusting spring is in uncompressed state, the main valve disc and secondary valve disc is in close position. When you want to use it, you can turn the adjusting screw clockwise; this can compress the adjusting spring, move the diaphragm down and then open the secondary valve disc, the medium also enters above the main valve seat through “a” hole to “b” hole, make the main valve disc open and then enters under the diaphragm through “c” hole. But when the downstream pressure is exceed the set pressure, the medium moves the diaphragm up and compresses adjusting spring, and then the secondary valve disc closes slowly, because the flow reduces, the downstream pressure get a new balance, on the other hand, when the downstream pressure is less than the set pressure, the gap between the main valve disc and the main valve seat increases and then the flow increases too and then make the downstream pressure get a new balance. Installation and maintenance:1. Clean the valve and the pipe line and remove the dirt before installation, at the same time the valve must be installed in horizontal direction, bracket is needed when the valve deadweight is heavy or vibration exists at the site.2. While installing, make sure the flow direction and the direction marked on valve body is consistent, and a bypass pipe is usually required. When the valve size and the pipe size differ, reducer should be adopted. The installing site should have sufficient space for a convenient usage and maintenance. 3. When the valve is put into use, the bypass globe valve must be opened, remove the condensate and the water vapor mixture in order to avoid the water hammer occurred by opening the valve. If there is no unusual phenomenon appears, you can turn the adjusting screw clockwise till getting the outlet pressure we need, then lock the nut and cover the top cap. 4. A filter must be installed before the pressure reducing valve which prevents the impurities from getting into the valve. 5. There must be a straight pipe at least 600mm and 1000mm seperately before and after the pressure reducing valve.6. A water-vapor separator and a steam trap should be installed before the pressure reducing valve, atfter which a steam trap should also be installed.7. Pressure reducing valve should be kept in a dry room, both of which should be blocked with blind plates. Do not keep in piles.8. If the pressure reducing valve will be kept for a long time, we must check it regularly, clean up the dirt and spread some rust-proof oil on the movement part and the machined surface.9. If the outlet pressure is higher than the inlet pressure, we must reset the pressure reducing valve as follows: Shut off the upstream isolating valve; Relief the downstream pressure; Turn the adjusting screw counterclockwise, make it in a free poisition. Open the upstream isolating valve slowly till full open. Turn the adjusting screw clockwise, the outlet pressure rises slowly to the set value, then lock the adjusting screw. If you adjust the press
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年荆门市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)及答案详解参考
- 安康市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)含答案详解(综合卷)
- 西双版纳州农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)及一套答案详解
- 聊城市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)及答案详解(有一套)
- 三门峡市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)及答案详解(必刷)
- 2026年荆州市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)有答案详解
- 青岛市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)含答案详解(考试直接用)
- 玉树州农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)附答案详解(考试直接用)
- 林芝地区农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)有完整答案详解
- 嘉义市农村信用社联合社秋季校园招聘笔试备考题库(浓缩500题)完整参考答案详解
- 宁夏绿电园区方案
- 四川大学2000年471有机化学(含答案)考研真题
- 二级及以上综合医院精神科(心理)门诊基本标准
- 《对外汉语词汇教学(第二版)》构形分析释义法
- 思想政治学科教学新论(刘强主编)第二章
- 中国文化概论完整笔记张岱年
- 仓库包装管理制度
- GB/T 3360-1982数据的统计处理和解释均值的估计和置信区间
- 第5课 文化变革 美术发展 课件 【高效课堂+备课精研】 高一美术鲁美版美术鉴赏
- 思想道德与法治基础:第一章 领悟人生真谛 把握人生方向
- 2022年DISC职业性格测试(40题附完整分析)
评论
0/150
提交评论