




已阅读5页,还剩6页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
-本文为网络收集精选范文、公文、论文、和其他应用文档,如需本文,请下载-2018年6月30日雅思阅读机经本文从网络收集而来,上传到平台为了帮到更多的人,如果您需要使用本文档,请点击下载按钮下载本文档(有偿下载),另外祝您生活愉快,工作顺利,万事如意!想要在雅思考试的时候获得高分,这和平时的积累是离不开关系的,那么接下来就和出国留学网来看看2018年6月30日雅思阅读机经。权威点评文章题材常规,涉及到环境,动物,商业类。据烤鸭们反馈,passage 3生词较多,导致原文和题干理解困难,影响做题。这要求考生在平时练习中多总结不同场景的高频词汇,并且提高在语境中理解生词的能力。从题型看,难度适中,基础题型:填空题(包括summary)和判断题占30个左右,考查对于细节信息的定位和理解;匹配题考查了6个段落信息匹配题,考查学生在短时间内准确找到匹配段落信息的能力,考生必须掌握高效做匹配题的方法,在有限的时间内拿到更多的分数。Passage 1题目Why good ideas fail?话题分类商业类题型及对应数量判断题 5填空题 8内容回忆一位市场营销专业的学生做了关于公司治理的案例,该公司早前获得了成功,后来失败了。两位专家对该公司的营销进行分析与评价,并且提出了一些市场营销的策略题目回忆判断题1 TRUE2 TRUE3 NOT GIVEN4 NOT GIVEN5 FALSE填空题6 surface7 name8 需要补充9 weight loss10 behavior11 focus group12 simple survey13 instincts参考阅读 10-3-1 商业类Passage 2题目Hold back floods话题分类环境类题型及数量段落信息匹配 6单选题 2填空题 5内容回忆本文讲述了主要讲了洪水以前和现在的情况对比,以及治理洪水的新方法Hold back floodA Last winters floods on the rivers of central Europe were among the worst since the Middle Ages, and as winter storms return, the spectre of floods is returning too. Just weeks ago, the river Rhne in south-east France burst its banks, driving 15,000 people from their homes, and worse could be on the way. Traditionally, river engineers have gone for Plan A: get rid of the water fast, draining it off the land and down to the sea in tall-sided rivers re-engineered as high-performance drains. But however big they dug city drains, however wide and straight they made the rivers, and however high they build the banks, the floods kept coming back to taunt them, from the Mississippi to the Danube. And when the floods came, they seemed to be worse than ever. No wonder engineers are turning to Plan B: sap the waters destructive strength by dispersing it into fields, forgotten lakes, flood plains and aquifers.B Back in the days when rivers took a more tortuous path to the sea, flood waters lost impetus and volume while meandering across flood plains and idling through wetlands and inland deltas. But today the water tends to have an unimpeded journey to the sea. And this means that when it rains in the uplands, the water comes down all at once. Worse, whenever we close off more flood plains, the rivers flow farther downstream becomes more violent and uncontrollable. Dykes are only as good as their weakest linkand the water will unerringly find it. By trying to turn the complex hydrology of rivers into the simple mechanics of a water pipe, engineers have often created danger where they promised safety, and intensified the floods they meant to end. Take the Rhine, Europes most engineered river. For two centuries, German engineers have erased its backwaters and cut it off from its flood plain.C Today, the river has lost 7 percent of its original length and runs up to a third faster. When it rains hard in the Alps, the peak flows from several tributaries coincide in the main river, where once they arrived separately. And with four-fifths of the lower Rhines flood plain barricaded off, the waters rise ever higher. The result is more frequent flooding that does ever-greater damage to the homes, offices and roads that sit on the flood plain. Much the same has happened in the US on the mighty Mississippi, which drains the worlds second largest river catchment into the Gulf of Mexico.D The European Union is trying to improve rain forecasts and more accurately model how intense rains swell rivers. That may help cities prepare, but it wont stop the floods. To do that, say hydrologists, you need a new approach to engineering not just rivers, but the whole landscape. The UKs Environment Agencywhich has been granted an extra 150 million a year to spend in the wake of floods in 2000 that cost the country 1billionputs it like this: “The focus is now on working with the forces of nature. Towering concrete walls are out, and new wetlands are in.” to help keep Londons feet dry, the agency is breaking the Thamess banks upstream and reflooding 10 square kilometres of ancient flood plain at Otmoor outside Oxford. Nearer to London it has spent 100 million creating new wetlands and a relief channel across 16 kilometres of flood plain to protect the town of Maidenhead, as well as the ancient playing fields of Eton college. And near the south coast, the agency is digging out channels to reconnect old meanders on the river Cuckmere in East Sussex that were cut off by flood banks 150 years ago.E The same is taking place on a much grander scale in Austria, in one of Europes largest river restorations to date. Engineers are regenerating flood plains along 60 kilometres of the river Drava as it exits the Alps. They are also widening the river bed and channeling it back into abandoned meanders, oxbow lakes and backwaters overhung with willows. The engineers calculate that the restored flood plain can now store up to 10 million cubic metres of flood waters and slow storm surges coming out of the Alps by more than an hour, protecting towns as far downstream as Slovenia and Croatia.F “Rivers have to be allowed to take more space. They have to be turned from flood-chutes into flood-foilers”, says Nienhuis. And the Dutch. for whom preventing floods is a matter of survival. Have gone furthest. A nation built largely on drained marshes and seabed had the fright of its life in 1993 when the Rhine almost overwhelmed it. The same happened again in 1995. when a quarter of a million people were evacuated from the Netherlands. But a new breed of “soil engineers” wants our cities to become porous, and Berlin is their shining example. Since reunification, the citys massive redevelopment has been governed by tough new rules to prevent its drains becoming overloaded after heavy rains. Harald Kraft, an architect working in the city. says: “We now see rainwater as a resource to be kept rather than got rid of at great cost.” A good illustration is the giant Potsdamer Platz, a huge new commercial redevelopment by Daimler Chrysler in the heart of the city.G Los Angeles has spent billions of dollars digging huge drains and concreting river beds to carry away the water from occasional intense storms. The latest plan is to spend a cool 280milsawayinnorthernCaliforniaandfromtheColoradoriverinArizonatofillitstapsandswimmingpools,”InLAwereceivehalfthewaterweneedinrainfall,”saysAndyLipkis,anLAenvironmentalist,alsawayinnorthernCaliforniaandfromtheColoradoriverinArizonatofillitstapsandswimmingpools,”InLAwereceivehalfthewaterweneedinrainfall,”saysAndyLipkis,anLAenvironmentalist,al million scheme to road-test the porous city in one flood-hit community in Sun Valley. The plan is to catch the rain that falls on thousands of driveways, parking lots and rooftops in the valley. Trees will soak up water from parking lots. Homes and public buildings will capture roof water to irrigate gardens and parks. And road drains will empty into old gravel pits and other leaky places that should recharge the citys underground water reserves. Result: less flooding and more water for the city. Plan B says every city should be porous, every river should have room to flood naturally and every coastline should be left to build its own defenses. It sounds expensive and utopian, until you realize how much we spend trying to drain cities and protect our watery marginsand how bad we are at it.题目回忆段落信息匹配题1. A new approach conducted in the UK D2. Reasons why twisty path and dykes failed B3. One project on a river benefits three countries E4. Illustration of an alternative plan in LA which seems unrealistic G5. Efforts made in Netherla
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025合作伙伴合同全文
- 2025年股权转让合同
- 企业托管经营合同范本
- 小型改造合同范本
- 特许经营协议合同范本
- 家电房屋租赁合同范本
- 房租转卖合同范本
- 水利代建合同范本
- 运输承揽合同范本
- 空调简维修合同范本
- 2025年山东高考化学真题及答案
- 2025年云南省中考道德与法治试卷真题(含标准答案及解析)
- 呼吸系统疾病诊疗指南共识
- 子宫腺肌症教学护理查房
- 操作手册/西门子/软件/Simotion Programming-MCC
- DBJ53T-44-2021云南省建筑工程资料管理规程
- 五金件盐雾测试报告
- 肛管鳞状细胞癌临床诊疗要点
- 选择测试题大全及答案
- 陕西西安工业投资集团有限公司招聘笔试题库2025
- 废旧船买卖合同协议书
评论
0/150
提交评论