已阅读5页,还剩76页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
destruction notice for unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of this document. pma-260-spec-028/rev1 1 march 2010 department of the navy program executive office pma260 naval air systems command patuxent river, maryland 20670-1161 system specification for the mobile electric power plant (mepp), land based distribution statement a: approved for public release; distribution is unlimited. approved:approved: title:logistics integration managementtitle:se and alre systems engineering (air-6.6)(air-4.8.1) date:date: approved: title:program manager (pma-260c) date: revision history effective dateversionremarks 12 january 2010d1initial draft reference para. #s incorrect 13 january 2010d2second draft srb copy 20 january 2010d3third draft minor updates prior to srb 29 january 2010d4fourth draft srb comments incorporated 29 january 2010d5fifth draft minor rewording 3 february 2010rev0submittal for signature no changes from revd5 1 march 2010rev1updates: 1. amperage values mepp-con-0016, 0028, 0050, and vr-0017 2. wire gauge mepp-con-0035 (this page intentionally blank) table of contents i 1.0 scope1 1.1 identification .1 1.2 document overview .1 2.0 applicable documents2 2.1 general.2 2.2 government documents.2 2.3 non-government documents .5 3.0 system requirements7 3.1 definition .7 3.2 characteristics.vii 3.2.1 performance characteristics.7 3.2.1.1 provide mepp functions.7 3.2.1.1.1 perform built-in-test.7 3.2.1.1.2 provide maintenance power .7 3.2.1.1.2.1 output 115/200 vac power.7 3.2.1.1.2.2 output 28 vdc power.8 3.2.1.1.2.3 output 270 vdc power.8 3.2.1.1.3 provide auxiliary power.8 3.2.1.1.3.1 provide 270 vdc auxiliary power .8 3.2.1.1.3.2 provide utility power.8 3.2.1.1.4 perform diagnostics.8 3.2.2 interface requirements .9 3.2.2.1 external interfaces .9 3.2.2.1.1 aircraft interface.9 3.2.2.1.1.1 mepp to aircraft ac power link.9 3.2.2.1.1.1.1 115 vac, 400 hz output cable.9 3.2.2.1.1.2 mepp to aircraft 28 vdc link .9 3.2.2.1.1.2.1 28 vdc output cable.9 3.2.2.1.1.3 mepp to aircraft 270 vdc link .9 3.2.2.1.1.3.1 270 vdc output cable.9 3.2.2.1.2 auxiliary equipment interface.10 3.2.2.1.2.1 mepp to auxiliary equipment convenience plugs link.10 3.2.2.1.2.1.1 convenience plugs.10 3.2.2.1.2.2 mepp to auxiliary equipment 270 vdc link.10 3.2.2.1.2.2.1 270 vdc auxiliary receptacle .10 3.2.2.1.2.3 mepp to power tools utility power link.10 3.2.2.1.2.3.1 utility power plugs.10 3.2.2.1.3 operator/maintainer interface.10 3.2.2.1.3.1 mepp to operator/maintainer link.10 table of contents ii 3.2.2.1.3.1.1 control/instrument panel.10 3.2.3 115/200 vac electrical output.11 3.2.3.1 general considerations, 115/200 vac.11 3.2.3.2 overload capacity, 115/200 vac.11 3.2.3.3 voltage regulation (steady state).12 3.2.3.4 voltage modulation .12 3.2.3.5 voltage transient response.12 3.2.3.6 phase sequence.12 3.2.3.7 ac output control and protective devices.12 3.2.4 28 vdc electrical output.12 3.2.4.1 general considerations, 28 vdc.12 3.2.4.2 direct current power converter .12 3.2.4.3 power converter input.13 3.2.4.4 voltage adjustment .13 3.2.4.5 overload capacity, 28 vdc.13 3.2.4.6 voltage regulator .13 3.2.4.7 current limiting .13 3.2.5 270 vdc electrical output.13 3.2.5.1 general considerations, 270 vdc.13 3.2.5.2 overload capacity, 270 vdc.13 3.2.5.3 270 vdc (main) output steady-state current rating.13 3.2.5.4 28 vdc (interlock) output steady-state current rating.13 3.2.5.5 270 vdc output voltage regulation.13 3.2.5.6 28 vdc interlock output voltage regulation.14 3.2.5.7 270 vdc output ripple amplitude .14 3.2.5.8 28 vdc interlock output ripple amplitude.14 3.2.5.9 270 vdc output distortion factor.14 3.2.5.10 28 vdc interlock output distortion factor .14 3.2.5.11 270 vdc output current demand rate.14 3.2.5.12 28 vdc interlock output current demand rate.14 3.2.5.13 270 vdc output distortion spectrum.14 3.2.5.14 28 vdc interlock output distortion spectrum.14 3.2.5.15 270 vdc output voltage threshold.14 3.2.5.16 28 vdc interlock output voltage threshold.15 3.2.5.17 270 vdc output voltage recovery.15 3.2.5.18 28 vdc interlock output voltage recovery.15 3.2.5.19 output load fault trip coordination.15 3.2.5.20 output load fault current limit.15 3.2.5.21 28 vdc interlock during output load fault.16 3.2.5.22 28 vdc interlock after output load fault.16 3.2.5.23 28 vdc interlock output protective function.16 3.2.5.24 line drop compensation.16 table of contents iii 3.2.5.25 line drop compensation control limits .16 3.2.5.26 main bus discharge.16 3.2.5.27 output discharge .16 3.2.5.28 voltage removal from output connector.16 3.2.5.29 output power contactor interlock.17 3.2.5.30 output power contactor rating.17 3.2.5.31 power quality limits.17 3.2.5.32 270 vdc output start-up loads (constant or resistive power).17 3.2.5.33 270 vdc output start-up loads (inrush current).17 3.2.5.34 28 vdc interlock output start-up load.17 3.2.5.35 baseline loading power quality .17 3.2.5.36 baseline load types.17 3.2.5.37 270 vdc baseline load conditions.17 3.2.5.38 28 vdc interlock output baseline load conditions.18 3.2.5.39 profile and transient loading power quality .18 3.2.5.40 profile and transient load types.18 3.2.5.41 profile and transient load ramp rates .18 3.2.5.42 load profiles.18 3.2.6 physical characteristics .18 3.2.6.1 general.18 3.2.6.2 prime mover .18 3.2.6.3 cable storage.18 3.2.6.4 dimensions.18 3.2.6.5 diesel engine.19 3.2.6.6 epa tier iii requirement.19 3.2.6.7 exhaust pipe.19 3.2.6.8 exhaust muffler .19 3.2.6.9 fuel tank .19 3.2.6.10 diesel engine fuel, air and oil filters.20 3.2.6.11 trailer general.20 3.2.6.12 chassis .20 3.2.6.13 shock absorbers.20 3.2.6.14 towbar.20 3.2.6.15 lunette eye .20 3.2.6.16 parking brakes.20 3.2.6.17 top plate/top access panels.20 3.2.6.18 tires and wheels.20 3.2.6.19 lifting/tiedown rings.20 3.2.6.20 forklifting .21 3.2.6.21 retro-reflective marking .21 3.2.7 system quality factors.21 3.2.7.1 reliability.21 table of contents iv 3.2.7.1.1 reliability requirements.21 3.2.7.2 maintainability.21 3.2.7.2.1 general, maintainability .21 3.2.7.2.2 routine maintenance .21 3.2.7.2.3 preven
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 纸盒制作工岗前操作评估考核试卷含答案
- 麻料作物栽培工常识评优考核试卷含答案
- 泥釉浆料制备输送工安全防护测试考核试卷含答案
- 温差电电池制造工成果转化能力考核试卷含答案
- 宾客行李员岗前创新意识考核试卷含答案
- 木地板制造工诚信品质模拟考核试卷含答案
- 煤间接液化分离操作工操作水平竞赛考核试卷含答案
- 怀孕不参加培训的请假条
- 2025年坦克玻璃系列合作协议书
- 2025年针织、编织制品项目发展计划
- 河南豫能控股股份有限公司及所管企业2026届校园招聘127人笔试模拟试题及答案解析
- 未来五年养殖淡水鳙鱼(胖头鱼)企业县域市场拓展与下沉战略分析研究报告
- 2026年宁夏贺兰工业园区管委会工作人员社会化公开招聘备考题库参考答案详解
- 癌痛患者心理支持策略
- 2025年12月份四川成都市第八人民医院编外招聘9人笔试参考题库及答案解析
- 25秋二上语文期末押题卷5套
- 微生物检验质控措施分析
- 达人分销合同范本
- 检修车间定置管理制度(3篇)
- 乘用车内部凸出物法规培训
- 妇科肿瘤保留生育功能治疗策略
评论
0/150
提交评论