已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
一、Accounting for materials1. EOQCo=cost of placing one order Ch= holding cost per unitD=demand per annumQ=re-order quantityAnnual stockholdingCosts =Annual stock ordering=EBQ一边生产一边消费Q=batch size D=demand per annumCh=cost of holding one unit for one year Co=cost of setting a batch ready to be produceR=annual replenishment rate2.Stock control system.minimum stock levelreorder level (average usage average lead time) maximum stock levelMaximum level = reorder level + reorder quantity (minimum usage minimum lead time) average inventory = safety inventory + free inventory=physical inventory + inventory on order inventory requisitioned (not issued)二、Accounting for labor 1. direct labor cost Time-based system Wages = (Hours worked basic rate of pay per hour) + (overtime hours worked overtime premium per hour )Idle time: time spent doing nothing is called idle time.Overtime premium: overtime hours are paid at a higher rate than the basic hourly rate.Bonus payments: a payment in addition to a basic salary, either for achieving or exceeding certain targets.Piecework systems Wages = Units produced Rate of pay per unit2. labor turnoverLabor turnover = 3. labor efficiencyEfficiency ratio= XXCapacity ratio=Production volume ratio=上式=三、Accounting for overheads1.absorption costing Prime cost / direct costOverheads / indirect costProduction overheads (indirect materials, indirect labor, indirect expenses)Non-production overheads (administration overheads, selling and distribution overheads)Absorption rate= Predetermined absorption rate= 2. under/over absorbeda. If Actual overhead incurred Absorbed overhead = NEGATIVE (N), then overheads are over absorbed (O) (NO)b.If Actual overhead incurred Absorbed overhead = POSITIVE (P), then overheads are under absorbed (U) (PU)Overhead absorbed=Actual activity * absorption rate based on the budget.Cost ledger: a manufacturing organization might record its costs in a set of ledger accounts, called cost ledger.The ledgers not contain accounts for bank, debtors, non-current assets.Cost control accounts, it is for recording the matching double entry whenever the entry would be to an account not contained in the cost ledger.Raw material, WIP or Finished goodsa. Buy: Dr raw material Cr cost control b. issue: Dr WIP Dr production Dr non-production Cr raw materialc. finished: Dr finished good Cr WIPLabora.Pay: Dr salary and wages Cr cost control b.Apportion: Dr WIP Dr production Dr non-production Cr salary and wagesManufacturing overheada. Incurred: Dr production Cr cost control b. Absorption: Dr WIP Cr production c. Over-absorbed: Dr production Cr Under-absorbed: Dr Cr production 四、1.job costing Price=unit cost + profitprice= unit cost+ (unit cost “1” *n%)2. Batch costingCost per unit batch =五、1.Normal lossSolution procedures:Calculate the number of normal loss unitsCalculate the expected number of output unitsTotal the process costsCalculate the cost per unitWrite up the process account and normal loss account2. Abnormal lossWIP: work-in-progress product.Equivalent units: units of output remains in an uncompleted state can be expressed as a proportion of a completed unit.3. Weight average methodEquivalent units: all completed units and the closing WIP work done.Costs to be accounted for: opening stock values and current costs.Cost per equivalent unitCosts of finished productionComplete the process account4.The FIFO methodEquivalent units: the completion of opening WIP, units started and completed in the period, the work done on closing WIP.Costs to be accounted for: current cost added.Cost per equivalent unit.Cost of finished production: cost from opening WIP value at the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 深度解析(2026)《GBT 35757-2017烟花爆竹 黏土》
- 深度解析(2026)《GBT 35565-2017木质活性炭试验方法 甲醛吸附率的测定》
- 城市轨道交通运营管理习题库 模块二 客流调查 课后习题及答案
- 《DLT 575.3-1999控制中心人机工程设计导则 第3部分:手可及范围与操作区划分》(2026年)合规红线与避坑实操手册
- 网络教育工商管理试题及答案
- 骨科诊断题目及详解
- “歌唱祖国”国庆主题班会计划
- 园林绿化设计公司项目管理办法
- 初中数学概率题目及详解
- 门巴族语试题及分析
- GB/Z 177.7-2026人工智能终端智能化分级第7部分:汽车座舱
- 成都湔江投资集团有限公司2026年春季第一批次招聘考试参考题库及答案解析
- 2026浙江宁波市北仑区残疾人联合会招聘编外用工1人笔试备考试题及答案详解
- 2026年高考物理终极冲刺:专题12 动量守恒定律及其应用(二大题型)原卷版
- 2025江苏扬州市高邮市城市建设投资集团有限公司招聘拟聘用人员笔试历年参考题库附带答案详解
- √高考英语688高频词21天背诵计划-词义-音标-速记
- 第六章 藻类植物
- YY 0286.1-2019专用输液器第1部分:一次性使用微孔过滤输液器
- GB/T 17215.421-2008交流测量费率和负荷控制第21部分:时间开关的特殊要求
- GB/T 13498-2017高压直流输电术语
- GB/T 13393-2008验收抽样检验导则
评论
0/150
提交评论