




已阅读5页,还剩6页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 混凝土工程施工方案南通五建建设工程有限公司2012年9月27日 混凝土工程专 项 施 工 方 案 工程名称:福斯流体控制(苏州)有限公司新建工程 建设单位:福斯流体控制(苏州)有限公司 设计单位:苏州工业园区设计研究院股份有限公司 监理单位:苏州建园建设工程顾问有限责任公司 施工单位:南通五建建设工程有限公司 编制: 审核: 审批: 日期: 福斯流体控制(苏州)有限公司建厂房工程混凝土工程施工方案一、工程概况:福斯流体控制(苏州)有限公司新建厂房工程是由福斯流体控制(苏州)有限公司投资的工业项目。位于苏州市工业园区强胜路北、利胜路东。是由南通五建建设工程有限公司承建。二、砼的供应:因本工程工程砼量大,我项目部为能有充足的砼供应将采用上海双秋混凝土有限公司预拌商品砼。预拌砼质量按国标GB14902-94预拌混凝土,确保了砼的质量达到设计要求及有关规范的规定。砼的浇筑供应标号按图纸设计标号进行供应。三、砼的浇筑前的准备:1.为了加快工程施工进度,使得砼工序尽快地插入,计划将竖向构件的柱、墙的砼浇筑采用泵车布料,水平构件的梁板砼采用泵送,在尽量利用工作面,提前完成浇筑工作。2.每次砼浇筑前按砼的购销合同于24小时前,填写生产联系单送达砼供应公司,使砼的供应准时到达工地,确保砼浇注时间的准确,保证工程进度。3.砼浇筑部位的前道工序已全部施工完毕,并办理好了隐蔽工程验收手续。模板已清理干净,并淋水湿润。4.每次砼浇筑前及时填报砼浇注申请令报现场监理,在得到砼浇筑令后开始浇注砼。5.机具准备:(1)振动器采用插入式和平板式两种,其中墙、柱、梁采用插入式振动器,板采用平板式振动器。(2)斗车采用0.09m3规格的准备10辆。(3)通讯:泵站与浇筑现场之间的通讯采用电话联系,以保证砼浇筑工作顺利进行。6人员准备1、泵送混凝土施工中,配备混凝土输送泵司机2人,搅拌机司机若干人(视浇筑方量决定),指挥信号联络1人,混凝土入泵车前检测坍落度1人,混凝土布料杆操作人2人,机修电工1人,混凝土振捣工10人,整个生产线需25至30人。各工种需持证上岗并保证打混凝土期间维修人员随叫随到,配备一定的维修配件,全力保证工程需要。7.作业条件:(1)泵车空载运行一段时间,观察工作状态是否正常,正常否才能泵送砼。(2)润滑管道的水泥砂浆以准备好。(3)隐蔽工程验收手续,浇筑令已经办理好。四、操作工艺:(一) 柱墙砼浇筑:1.柱墙砼浇筑采取泵车布料及人工布料方式进行,按中、边、角的顺序依次施工,有利于整体结构的稳定,并可防止砼的浇注过程中的侧压力而引起梁柱的倾斜和偏移。2.柱墙砼分层浇筑振捣,每层浇筑厚度控制在500左右,砼的下料点应分散布置,循环推进,连续进行,用振动棒振实,浇筑过程中派有经验泥水工观察是否有漏振捣,随时敲打模板,有异常现象及时与上部振捣人员联系,并报告施工值班人员及时采取措施进行处理。3.柱截面小于300300mm时应先把振动棒插到底且振动,再向柱内下料,然后边振边拔振动器连续浇筑完毕。4.浇筑墙体洞口时,要使洞口两侧砼高度大体一致,振捣时振动棒应距洞边300以上,并从两侧同时振捣,以防止洞口移位变形。大洞口下部模板应开口并补充振捣,然后再封口。5.柱子的施工缝按规范留置在主梁底平。6.墙体的施工缝按规范留置在主梁底或门过梁跨度1/3范围内。7 .砼浇筑完毕应清理干净施工现场,做到工完料清。(二)梁板砼浇筑:1.梁板砼浇筑采用泵送送料塔吊及人工布料方式进行连续浇筑。2.梁板应同时浇筑,浇筑方式应由一端开始用“赶浆法”保持水泥浆包裹石子向前推进。先将梁分层浇筑成阶梯形,当达到楼板位置时再与板的砼一起浇筑。3防止浇筑砼时人员采踏钢筋的措施,将泵车作布料机使用,在泵管工作范围两侧各铺设一道施工通道,作为施工人员通行及绳牵引软管布料用。4.梁和板连成整体的大断面梁,允许将其单独浇筑,其施工缝应留在底板以下2030mm,浇筑时下料与振捣必须紧密配合,第一层下料慢些,梁底充分振实后再下二层料,仍用“赶浆法”向前推进,每层均应振实后再下料。振动棒振捣砼的每一振点的延续时间应使砼表面呈现浮浆和不再沉落,无气泡浮出为止。振动棒的移动间距不宜大于振动器作用半径的1.5倍,振动棒与模板的距离不应大于作用半径的0.5倍,并应避免碰撞钢筋、模板预埋件、振动棒插入下层砼内深度不小于50mm。5.浇筑板的砼虚铺厚度应略大于板厚,用平板振动器垂直于浇筑方向来回振捣,也可用插入式振动棒顺浇筑方向拖拉振捣,并用铁插尺和拉线检查砼厚度,振捣完毕用不短于2m的刮尺或拖板刮平,板面标高控制采用拉线控制,在浇捣板面砼前由测量人员在柱钢筋四角筋上抄出0.5米的标高,以此控制板面平整度。6.梁板砼应连续进行,当必须有间歇时,其间歇时间应尽量缩短,并在前层砼初凝前将次层砼浇筑完毕。砼的运输、浇筑及间歇时间不超过规范规定的时间1.5小时。7.楼板砼收面工作应随砼的干硬速度情况进行,首先在砼振捣密实后用刮尺刮平,用木磨板收面一次,在第一次收面后1-2小时砼初凝前进行第二次收面,因泵送水泥含量大,为了减少收缩裂缝,待砼表面无水渍时,进行第三次研压抹光。柱、墙钢筋内同的砼面必须与板面砼平齐密实。8.施工缝和后浇带的留设位置,严格按设计图纸要求及规范规定进行留置。施工缝或后浇带两侧砼缝表面与板面垂直用木板钢丝网挡牢,不得留斜槎。(三)楼梯砼浇筑:1.楼梯砼采用小塌落度砼,用人工布料方式浇筑。2.采用小塌落度砼是为了防止浇筑时流淌造成烂根现象的出现。楼梯砼自下而上浇筑,先振实底板砼,达到踏步位置与踏步砼一起浇筑,不断连续向上推进,并随时用木磨板将踏步上表面抹平。3.楼梯砼必须连续浇筑完成。4.楼梯施工缝位置应根据施工现场的施工进度留设于楼梯平台板跨中或楼梯段上1/3处,断面与楼梯斜板垂直。(四)施工缝的处理:1.楼层施工缝处理:将施工处凿毛,清除浮浆,用水冲刷干净,使嵌固的石子呈半裸状态。在浇筑下次砼之前,先铺上与砼成份相同的水泥砂浆结合层2-3cm厚,然后紧接着浇筑上砼,重点进行振捣,加强施工缝的养护工作,不少于14天。2.后浇带的处理:在后浇带砼浇筑前,把施工的后浇带的两侧砼凿毛,清除浮浆用水冲刷干净,并于浇筑前24小时用水充分湿润,且在砼浇筑前1-2小时再次用水冲刷,扫除积水。砼浇筑前先在后浇带两侧施工缝处铺上与砼成份相同的水泥砂浆结合层2-3cm厚,紧接着浇筑上部砼。砼强度等级比原浇筑砼标号高一等级,按设计要求在砼中掺入砼水泥用量的10%的HEA,并扣除同量的水泥用量,砼连续浇筑完成,不允许出现冷缝,砼凝固后养护时间不少于14天,在砼强度达100%后方可拆除支承模板。(五)砼养护:1.砼浇筑完毕后,在12小时以内对砼加用薄膜覆盖养护和浇水养护。2.商品砼内的水泥用量大及砼内掺用缓凝剂,养护时间不少于14天。3.每日浇水次数保持砼处于足够的润湿状态。(六)砼成品保护:1.在砼浇筑过程中及后,准备好足够的遮雨材料防止下雨。2.已浇筑楼板、楼梯踏步砼在砼强度未达到1.2N/mm2之前不得在其上踩踏、放样等施工行为。砼浇筑完毕24小时可施工放样,但严禁在板上堆加荷载。3.楼板最早加荷时间应该核算确定,但不得早于楼(屋面)板砼浇筑完毕后72小时。当掺缓凝剂或气温低于15时,应适当延长。严禁野蛮施工。4.不准用重物冲击楼板,避免砼面裂缝的发生。五、质量标准:1.保证项目:(1)商品砼所用的水泥、水、骨料、外加剂等必须符合规范及有关规定,使用前检验报告及出厂合格证必须经过检查达到要求。(2)评定砼强度的试块必须符合砼强度检验评定标准(GBJ107)。2.基本项目:(1)砼振捣密实,达到砼结构工程施工质量验收规范(GB50204-2002)的规定,不应出现严重缺陷且不宜有一般缺陷。(2)现浇结构拆模后的尺寸偏差应符合规范要求。六、施工注意事项:1. 避免工程质量通病:(1)砼输送管道布置遵循“路线短,弯道少,接头严密”的原则。做到直管顺直,管道接头密实不漏浆,转弯位置的锚固牢固可靠。(2)砼泵与垂直向上管的距离宜大于10m,以抵消反堕冲力和保证泵的振动不直接传到垂直管。(3)凡管道经过的位置平整,管道用钢管加固架设,不得直接与模板钢筋接触,与钢筋外脚手架连接的应加固牢靠。(4)垂直管穿越每一层楼板时,用钢管加固。(5)泵送前应先开机,用水湿润每个管道而后送入水泥砂浆,使输送管壁处于充分滑润状态,再开始泵送砼。润管用水和水泥砂浆用量为:管道长度小于100m时,水用30L,砂浆0.5m3,管道长度100200m时,水用30L,砂浆1.0 m3。(6)对施工中途新接的输送管道,应清除管内杂物并用水润滑管壁。(7)垂直向上管和靠近砼泵的起始砼输送管宜用新管或磨损较少的管。(8)砼在卸料前,必须以搅拌速度搅拌一段时间方可卸出砼。(9)最初泵出的砂浆应均匀分布到较大的工作面上,不准集中一处浇筑。(10)泵机料斗上加装一个隔离大块石块的筛网,其筛网规格与砼骨料最大粒径相匹配,并派专人值班监视卸料情况,当发现大块物料时立即拣出。(11)严禁踩踏钢筋,确保钢筋保护层及有效截面。2.主要安全技术措施:(1)正确佩戴安全帽、安全带,严禁酒后上班。(2)砼料斗的斗门在装料吊运前一定要关好卡牢,以防止吊运过程被挤开抛卸砼砸伤人事故的发生。(3)浇注边梁砼时,防止砼从外架抛出砸伤人。(4)使用手推车推倒砼时,不得过猛或撒把。(5)楼面上的孔洞应予以遮盖或用安全网围护,防止高空坠落。(6)布料时,注意料斗的起降,以防料斗撞或砸伤人。(7)用砼料斗装砼时,不得过满,防止溢出的砼砸伤人。(8)浇注单梁柱砼时,应设操作平台,操作人员严禁直接站在模板或支撑上操作,以防踩滑或踩断而高空坠落。(9)砼泵输出的砼在浇捣面处不准堆积过量,以免引起过载造成支承系统破坏,板面下沉的工程事故发生。(10)输送管内有压力时,其接头部分严禁拆卸。(11)清管时,管端应设置挡板或安全罩,并严禁管端站立人员以防喷射伤人。(12)夜间作业,必须有足够的照明且避免照明盲区存在。(13)使用振动器的作业人员,应穿胶鞋,戴绝缘手套,使用带有漏电保护的开关箱。(14)每位工作人员切记安全第一,做到“高高兴兴上班,平平安安回家”。七、 砼的取样:1、本工程梁、板、柱、墙等主要现浇构件,每次浇筑砼都要做好砼浇筑记录,并又取样员和监理见证员现场对砼进行抽检,取样与试件留置应符合下列规定:(1)每100m且不超过100m3的同配合比的混凝土,取样不得少于一次;(2)当一次连续施工超过1000m时,同一配合比混凝土每500m混凝土取样不得少于一组。(3)每一楼层、同一配合比的混凝土,取样不得少于一次;(5)每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据检验批确定。(6)抗渗试块每组六个试块标准养护,每组六个试块同条件养护。2、留置标养砼试块同时,一并做好同条件养护试件,以便作为拆模及加载依据。3、对于后浇带按设计要求的期限二次浇注,比梁板砼高一级的微膨胀浇注。4、现浇砼构件按要求拆模后,及时会同监理建设单位对砼按砼结构工程施工质量验收规范(GB50204-2002)进行验收,并作好检查记录对出现的问题及时进行处理。当砼达到28天强度后再对砼分项工程进行评定。为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinity environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control draina
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 留守儿童家庭委托抚养责任协议书
- 继子女抚养费支付及关系解除法律协议
- 儿童抚养权变更与探视时间约定合同
- 赛事直播版权分销与赛事赛事周边产品销售合同
- 新能源汽车产业私募股权投资基金有限合伙人全面合作协议
- 工业模具恒温仓储租赁与品牌合作合同
- 智能建筑雨水资源回收租赁服务协议书
- 信用证保兑金融服务代理合同
- 抖音平台AI选品与品牌合作合同
- 电动汽车充电站建设与能源优化配置合作协议
- 造船电焊工合同协议
- 成人舞蹈合同协议书
- 2025超市承包经营合同
- 舞厅合作协议书合同
- 第23课《“蛟龙”探海》课件统编版语文七年级下册
- 工程师施工现场安全管理实务试题及答案
- 大气遥感考试题及答案
- 2024年山东省临沭县事业单位公开招聘教师岗笔试题带答案
- 初中地理澳大利亚(第2课时)课件+-2024-2025学年地理人教版(2024)七年级下册
- 自动生成的文档-2025040814-11
- (二模)济宁市2025年4月高三高考模拟考试生物试卷(含答案)
评论
0/150
提交评论