



免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
INSTRUCTION指示表Title/标题: 模具制造管理指引 / The Instruction for Mold/Die Manufacturing ManagementNo/编号: WI-ME-00xRelevant Model/相关型号:Dept./部门:MECategory/指示类别 日常运作(DOI) 器械操作(EOI)NA /不适用1目的 / Purpose明确新模具的开发制造流程,以便于更好地对新模具的开发制造进行管理。Define the development process of new mold/die for management.2适用范围/Scope本指引适用于本公司所有新开模具的申请、开发、制造过程及验收。This instruction is applied to the application, development, manufacture and acceptance of new mold/die in Electra Shenzhen.3职责/Responsibility 3.1技术部:下发新产品图纸及设计变更图纸,负责新模的申请及样品的确认,协助制造工程师对模具制造过程进行跟踪,协助采购工程师选定合适供应商。R&D is responsible for distributing new product drawing and design change drawing, applying new mold/die and confirming sample, assisting ME engineer to follow up mold/die, and assisting Purchase Engineer to qualify suitable supplier. 3.2 采购部: 负责寻找模具供应商,对供应商报价进行评估及确定供应商,负责下发采购订单及签署模具合同,以及公司内外部的协调工作。PUR is responsible for finding mold/die supplier, estimating the quotation from supplier and confirming, issuing purchase order and signing mold/die contract, and coordinating relevant work between inner and outer.3.3 品质部: 负责样品的检测及评估,协助模具工程师对模具制造过程进行跟踪。QA is responsible for testing and assessing sample, and assisting mold/die Engineer to follow up the mold/die supplier.3.4 ME部: 制造工程师负责新产品的产能分析,协助采购工程师选定合适供应商。制造工程师负责制定模具技术要求,跟进整个模具制造过程及最终模具验收; 协助采购工程师选定合适供应商;负责所有模具资料的存档保管。ME Depart.:ME Engineer is responsible for analyzing new product capacity and assisting Purchase Engineer to qualify suitable supplier, ME Engineer is responsible for defining the technical requirement of mold/die, following up the whole routine of mold/die manufacture includes final acceptance, assisting Purchase Engineer to qualify suitable supplier, retaining the file of all molds/dies.4、 程序 / Procedure 4.1 新开模具申请 / Application of new mold/die4.1.1 由技术部项目工程师根据新产品开发的需要填写新开模具申请书(R-ESP-R&D-01-01A),该申请书需经项目经理及技术总监签字后,递交给ME部,递交时必须附带新零件的图纸和2D电子图档。并同时在Oracle系统提出采购申请。R&D Project Engineer will fill in according to development requirement of new product and submit to ME after signed by Project Manager and R&D Director. The attachment of product structure drawing and 2D drawing is necessary. Applicant in the Oracle system. 4.1.2 ME模具工程师接到完整的新开模具申请书后,根据新开模具申请书及产品图纸要求,在3天之内完成模具技术要求(R-WI-PE-010-01A),并将模具技术要求递交给采购部。模具技术要求包括模具材质、结构、工序编排、验收等方面的要求。ME作为Oracle责任审批部门 ME mold/die Engineer will finish according to the requirements of and product drawing during 3 days and submit it to PUR. The should include the requirements of mold/die character, structure, process layout and acceptance, etc. ME is the responsibility department to approval the Oracle requiremnet 如单套模具的采购价格超过RMB40,000元,申请部门应提供投资分析报告并得总经理批准.If one mold value higher than RMB40,000,Application depart. Need to provide the invest analysis report ,and get the GMs approval.4.2 模具供应商的选择 / Choice mold/die supplier4.2.1 采购部工程师根据模具技术要求及产品图纸要求寻找合适供应商进行报价,报价工作需在5天内完成, 报价供应商必须至少3家。PUR Engineer will find some suitable suppliers to quotation according to and product drawing requirement. The quotation should be completed during 5 days and the suppliers should not less than 3 units. 4.2.2 供应商报完价后, 采购部工程师必须召集相关部门人员(包括:ME、采购部、技术部、及质量部的人员)开会进行评估,以共同确定最佳模具供应商。提交采购总监及总经理审核批准.After quoted by supplier, PUR Engineer will collect relevant persons (include: ME, PUR, R&D, QA) to assess and confirm the best.4.2.3 模具供应商确定后,采购部与供应商共同签署模具合同,采购部下达采购订单,通知供应商进行开模。After defined the mold/die supplier, PUR will sign a contract with supplier, and then a purchase order will be issued to supplier for making mold/die.备注:模具合同中应注明该模具必须在移到使用的制造商处生产50模经检验样品合格后方可验收。Remark: Mold/Die contract shall describe that the Mold/Die could not be accepted till its 50pcs samples produced by relevant manufacturer were inspected and passed.4.2.4 供应商信息确认,下达采购合同后,财务部将模具的资产编号信息告知ME,采购,技术部4.3 模具制造过程跟踪 / Follow up the manufacture of mold/die4.3.1 模具供应商选定后, ME部制造工程师、技术部工程师及供应商一起分析。内容包括:产品及模具结构尺寸、使用材料、公差标注,分型面、水口形式、位置等.讨论会之后,供应商提供模具制造详细日程,经以莱特制造工程师确认后,开始进行模具开发。ME and R&D Engineers will discuss with supplier.including the part and mold structure, plastic resin, tolerance,parting line,gate,located . The supplier will provide the schedule of making mold/die and start to develop after approved by Electra Shenzhen ME Engineer.4.3.2 ME部制造工程师将根据模具制作进度表(R-WI-PE-010-02A)定期地(每周1次)检查实际进度,并协助供应商解决模具制造加工中出现的疑难问题。ME Engineer will audit the schedule periodically (once time per week) and assist the supplier to resolve any problem occurred in mold/die making process.4.3.3 供应商做好模具设计之后, ME部制造工程师将对模具图纸进行评审,评审内容包括模具结构、使用材料、公差标注等。评审经确认之后,供应商开始进行模具的零部件加工及模具组装。After the design of mold/die was completed by supplier, ME mold/die Engineer will review the mold/die drawing includes the structure, material, tolerance mark, etc. the supplier will start to manufacture the components of mold/die and assemble after confirmed by Electra Shenzhen.4.4 试模及样品确认 / Mold/die trial and sample confirmation4.4.1 模具组装完成之后, ME部制造工程师将与供应商一起安排试模,制造工程师对试模过程进行跟进,必要时,技术部及品质部工程师要协助跟进,制造工程师和供应商需对试模的各种参数进行记录和存档。After the mold/die was assembled, ME Engineer will arrange mold/die trial together with supplier. ME Engineer is responsible for following up the process of trial, if necessary, R&D and QA will assist. ME Engineer and supplier will record and retain all kinds of parameter of trial.4.4.2 模具T1阶段完成后,ME制造工程师,技术部工程师根据产品要求和模具加工情况,对样品进行评估,与供应商讨论,确定修改方案,工期,对N G项目进行修正,再次试模并提供样品进行确认。4.4.3 产品试模完成后,供应商需提供样品及其检验报告给以莱特作确认,制造工程师对样品外观等作初步检查后,递交给技术部执行ESP-QA-03零部件评估程序。After final trial, supplier will provide the samples and relevant inspection report to Electra Shenzhen for confirmation. The samples will be submitted to R&D to deal with according to ESP-QA-03 after mold/die Engineer checked and confirmed the appearance.备注:QA确认试模样品时,应亲自到供应商处检查连续生产50模样品的质量状况。如发现质量问题,纠正后应再试50模直到样品检验合格。另外,试模材料必须按元件图纸的要求进行。Remark: QA will follow up the quality status in supplier site when confirmed the 50pcs samples whichs produced continually. If any problem was found, the 50pcs new samples are needed after corrected. Otherwise, raw material in trial run shall conform the requirements in component drawing.4.4.3 当样品的结构尺寸和外观经技术部和质量部确认合格后,要对最后的试模件进行签样,并以书面或邮件的形式通知ME和采购部。模具工程师准备进行模具转移管理程序(WI-ME-001)。If the sample is passed by R&D and QA, n
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年三四线城市房地产投资风险评估与市场前景分析报告
- 药品进口设备管理制度
- 药师调剂授权管理制度
- 药店在岗培训管理制度
- 药店药品卫生管理制度
- 菜鸟货物仓储管理制度
- 设备使用规范管理制度
- 设备器材安全管理制度
- 设备房除尘灰管理制度
- 设备管理中心管理制度
- 2025年广东省广州市南沙区中考二模道德与法治试题
- 2025安全宣传咨询日活动知识手册
- T/CSPSTC 112-2023氢气管道工程施工技术规范
- 一年级成长档案
- 储罐电动葫芦倒装提升方案
- 屋面防水质量控制培训课件(共63页).ppt
- DISCO240控制台
- 报联商企业的沟通方法课件
- 混凝土结构及构件实体检测模拟题
- 宁波大学2010-2011学年《模拟电子技术基础》期末考试及答案A卷(A3版)
- ASME__B1.20.1-2006(中文版)
评论
0/150
提交评论