




已阅读5页,还剩95页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
武汉市12万m3/d污水处理厂工艺设计(AB法)目 录设计总说明IGeneral Design IntroductionVI1前言11.1设计背景21.1.1污水国内外排放、处理现状21.1.2 武汉市背景资料31.1.3 设计资料31.2 污水厂的设计原则51.3 设计方案论证61.3.1 污水特征61.3.2 处理工艺的比较61.3.3 处理工艺的确定81.3.4 工艺流程92污水处理系统设计计算102.1格栅102.1.1一般说明102.1.2主要设计参数102.1.3工艺尺寸112.1.4水头损失132.1.5渣量计算132.2污水提升泵房设计132.2.1提升泵站的设计说明及原则132.2.2泵房型式及工艺布置142.2.3泵房设计计算142.2.4泵位及安装162.3曝气沉砂池162.3.1一般说明162.3.2设计参数172.3.3沉砂池尺寸172.3.4沉砂量及排砂设备182.3.5曝气系统192.4 A段曝气池和B段曝气池工艺设计202.4.1一般说明202.4.2已知条件212.4.3设计计算212.5 A段中沉池312.5.1设计说明312.5.2设计参数312.5.3设计计算322.5.4 中沉池设计草图352.6 B段终沉池 (二沉池)352.6.1设计说明352.6.2设计参数352.6.3设计计算362.6.4二沉池设计草图392.7接触消毒池392.7.1设计说明392.7.2设计参数402.7.3设计计算402.7.4接触消毒池设计草图412.8计量设备412.8.1设计说明412.8.2设计参数及要求412.8.3设计计算423污泥处理系统设计计算443.1污泥泵房设计443.1.1设计说明443.1.2回流污泥泵房443.1.3剩余污泥泵房443.1.4集泥池443.2污泥浓缩池设计计算453.2.1设计说明453.2.2设计参数453.2.3设计计算463.2.4浓缩池草图473.3污泥消化系统设计计算473.3.1设计说明473.3.2设计参数483.3.3设计计算483.3.4消化池草图523.4贮泥池设计计算523.4.1设计说明523.4.2设计计算523.5脱水机房533.5.1设计说明533.5.2设计计算544污水处理厂总体布置554.1平面布置554.1.1平面布置概述554.1.2工艺流程布置574.1.3建筑物平面布置574.1.4污水处理厂管线布置574.1.5厂区绿化及预留空地584.2高程布置584.2.1高程布置概述584.2.2污水高程布置计算594.2.3污泥管道高程布置计算665经济技术可行性分析716环境影响评价726.1施工过程中对环境的影响及对策726.1.1 生态影响分析726.1.2 施工扬尘的环境影响分析726.1.3 施工噪声的环境影响分析746.1.4 施工排水、及建筑垃圾的环境影响分析756.2项目建成后的环境影响及对策76参考文献78致谢79 华北科技学院毕业设计(论文)设计总说明我国幅员辽阔,各地气候不同,经济发展水平差异也很大。目前,各城市都面临着不同的水环境污染。因此,根据城市规模,建立一套与自己经济发展相适应的控制污染、保护水环境的方针、政策、标准和法规,同时建设与经济发展水平相适应的污水处理厂,就成为防止因水资源短缺而制约城市社会经济发展的必要手段。利用有限资源的必须部分。在人们日常生活中,盥洗、淋浴、生活洗涤等都离不开水,用后便成为污水。在工业企业中,几乎没有一种工业水是人们日常生活中不可或缺的宝贵资源。水的供给与排放处理水也是不合理的。水经生产过程使用后,绝大部分变成废水。生产废水携带着大量污染物质,这些物质多数是有害和有毒的,但也是有用的。必须妥善处理或加以回收利用。I 设计题目武汉市12万m3/d污水处理厂工艺设计(AB法)II 设计内容及原则II.I 设计内容污水处理厂工艺设计流程设计说明一般包括以下内容: (1)据城市或企业的总体规划或现状与设计方案选择处理厂厂址; (2)处理厂工艺流程设计说明; (3)处理构筑物型式选型说明; (4)处理构筑物或设施的设计计算; (5)主要辅助构筑物设计计算; (6)主要设备设计计算选择; (7)污水厂总体布置(平面或竖向)及厂区道路、绿化和管线综合布置; (8)处理构筑物、主要辅助构筑物、非标设备设计图绘制; (9)编制主要设备材料表。II.II 设计原则考虑城市经济发展及当地现有条件,确定方案时考虑以下原则: (1)要符合适用的要求。首先确保污水厂处理后达到排放标准。考虑现实的技术和经济条件,以及当地的具体情况(如施工条件),在可能的基础上,选择的处理工艺流程、构(建)筑物型式、主要设备、设计标准和数据等,应最大限度地满足污水厂功能的实现,使处理后污水符合水质要求。 (2)污水厂设计采用的各项设计参数必须可靠。 (3)污水处理厂设计必须符合经济的要求。设计完成后,总体布置、单体设计及药剂选用等要尽可能采取合理措施降低工程造价和运行管理费用。 (4)污水处理厂设计应当力求技术合理。在经济合理的原则下,必须根据需要,尽可能采用先进的工艺、机械和自控技术,但要确保安全可靠。 (5)污水厂设计必须注意近远期的结合,不宜分期建设的部分,如配水井、泵房及加药间等,其土建部分应一次建成;在无远期规划的情况下,设计时应为以后的发展留有挖潜和扩建的条件。 (6)污水厂设计必须考虑安全运行的条件,如适当设置分流设施、超越管线等。III 设计背景资料III.I 武汉市污水处理厂基本资料 武汉市基本概况:本设计是武汉市排水工程设计。武汉位于中国腹地中心、长江与汉江交汇处、江汉平原东部,因武昌、汉口、汉阳三地合称而得名,地理位置介于东经1134111505,北纬29583122,是中部六省唯一的副省级城市,也是国务院批准的中部地区中心城市。以城市常住人口、GDP总量、建成区面积等指标来说,武汉均为中部第一、全国前十的特大城市。世界第三大河长江及其最大支流汉江横贯市区,将武汉一分为三,形成武昌、汉口、汉阳跨江鼎立的格局。武汉也是世界各大城市中人均拥有水量最多的城市。虽然武汉水量充足,但随着城市的发展,用水量与日俱增,污染日益严重,为了保护祖国主要水系长江水系的水质状况,有必要在武汉建设污水处理厂处理生活污水和工业废水,处理达标后再排放到受纳水体,避免水质恶化。III.II 武汉市气候环境概况 (1)风向主导风向:东北风。 (2)气温属亚热带湿润性东南季风气候区。具有冬寒夏暖、春湿秋旱、夏季多雨、冬季少雪、四季分明的特征。年平均气温为16.7,7月平均气温高达28.9,1月仅3.5。夏季气温高,35以上气温天数为40天左右,极端最高气温41.3,极端最低气温-18.1,武汉日均温10持续期达235天,年平均无霜期240天。年平均降水量1284.0mm,降雨集中在49月,年平均蒸发量为1391.7mm,绝对湿度年平均16.4毫巴,年平均相对湿度75.7。 (3)地质条件 地势为东高西低,南高北低,中间被长江、汉江呈Y字型切割成三块,谓之武汉三镇。武汉市平均海拔为23.3米,最高海拔为873米,最低海拔为11.3米。最大冻土层为0米。厂区占地约56万平方米,临近汉江,地势较平坦,高差可忽略,整体上为长方形,长约800米,宽约700米。III.III 处理规模本设计污水处理厂设计总规模为120000m3/d,变化系数取为1.3。污水厂的处理水量按最高日最高时流量设计,一次设计,分两期实施。III.IV 进、出水水质武汉市污水处理厂污水进水水质及污水处理后的出水水质如下表: 表1 武汉污水处理厂水质情况项目COD(mg/L)BOD5(mg/L)NH4-N(mg/L)SS(mg/L)TP(mg/L)PH进水水质3003002022027.4出水水质60208(15)20169IV 污水处理工艺根据国内外已运行的中、小型污水处理厂的调查,要达到确定的治理目标并经济合理,本设计可采用“AB工艺”设计工艺流程图如下图1: 鼓风机房出水 消毒池生活 格 提升 曝 气 A 段 中 B 段 终 污水 栅 泵房 沉砂池 曝气池 沉池 曝气池 沉池 A 段 B 段污泥泵房 污泥泵房 沼气利用污泥 污泥 贮 污泥 污泥外运 脱水机 泥池 消化池 浓缩池 图1 工艺流程图V 设计结果本工程处理构筑物包括格栅间及提升泵房、曝气沉砂池、A段曝气池、中沉池、B段曝气池、二沉池、接触消毒池、污泥浓缩池等;附属构筑物包括鼓风机房、加氯间、污泥脱水机房以及综合办公楼、机修间、仓库等。主要构筑物设计结果见下表2: 表2 主要处理构筑物一览表序号构筑物名称数量(/座、格)尺寸(m)1提升泵房112.06.02曝气沉砂池218.03.03A段曝气池442.07.744中沉池2D=45.55B段曝气池848.58.06二沉池4D=417接触池13527.58污泥泵房212.06.09浓缩池1D=3410消化池2D=3511贮泥池1D=13.312鼓风机房120.010.0General Design IntroductionChina has a vast territory,different climate,and the level of economic development is also a great difference.Currently,cities are faced with different water pollution.Thus,according to the size of the cities to establish a set of economic development and their adaptation to control water pollution,protection of water environment policy, standards and regulations,at the same time,building and the level of economic development of the sewage treatment plant,has become to prevent shortage of water resources and constraints of urban socioeconomic development of he necessary means.So people have to use the part of the limited resources.In peoples daily life,toilet,shower and washing all of life can not be separated from water,with sewage.In industrial enterprises,almost no industrial water is essential to daily life precious resources.Water supply and discharge treaded water is not reasonable to the water.Water used by the production process,and the vast majority of wastewater is produced.Carrying a large quantity of wastewater pollutants,most of these substances are harmful and toxic,but it is also useful.So they have to be properly handled or recycled.I Design TitleWuhan District,Hubei,sewage treatment plant process design(AB process)II Design content and principlesII.I Design contentSewage treatment plant process design that generally includes the following:(1) According to the city or business or the status of the overall planning and design of programs to choose treatment plant site;(2) The process design explanation of treatment plants;(3) The explanation of treatment structure type and selection;(4) The design calculation of the treatment structures or facilities;(5) Design calculation and selection of the main equipment;(6) The overall layout of wastewater treatment plant (flat or vertical) and plant roads,afforestation and integrated arrangement of pipelines;(7) The design drawing of the treatment structures,the main supporting structures and the Non-standard equipment;(8) The preparation of major equipment and materials table;II.II Design principles Consider the citys economic development and local existing conditions,determinethe program to take into account the following principles:(1)to comply with applicable requirements.First of all,to ensure that the sewage treatment plant to meet emission standards.Consider the realities of the technical and economic conditions,as well as the specific local situation(such as the construction of the conditions),where possible,based on the treatment of choice of process,structure(building)the building type,major equipment,design standards and data should be the largest Wastewater Treatment Plant to meet the limits of realization of functions,so that the water quality of treated effluent in line with the requirements.(2)wastewater treatment plant design uses the design parameters must be reliable.(3)the design of sewage treatment plants must meet the requirements of the economy.Design is completed,the overall layout,design and pharmaceutical monomer to the use of as much as possible to take reasonable measures to reduce project cost and operational management costs.(4)sewage treatment plant design should be sought technical reasonable.In the principle of economic rationality,must be based on need,as far as possible the use of advanced technology,machinery and automatic control technology,but to ensure that safe and reliable.(5)wastewater treatment plant design should be noted that the combination of near term should not be part of a phased construction,such as the allocation of wells,pumping stations and processing drugs,etc.,and its construction should be completed first;in the absence of long-term planning,the design should be left for future development and expansion of potential conditions.(6)wastewater treatment plant design must take into account the conditions of safe operation,such as setting appropriate triage facilities,pipelines,etc.beyond.III The design of background dataIII.I Sewage treatment plant in Wuhan city basic informationThe basic situation in Wuhan:This design is Wuhan drainage engineering design.Located in the hinterland of Wuhan Chinese center, Yangtze River and Hanjiang River East, at the intersection of Jianghan Plain, so named because of Wuchang, Hankou, Hanyang three collectively, the geographical position is longitude 113 41 - 115 05, north latitude 29 58 - 31 22, is a sub-provincial city only six provinces in central, is the approval of the State Council of the central area of the city.The city resident population, the total GDP, built-up area and other indicators,Wuhan is middle first, the top ten big city. The third longest river in the world and its largest tributary of the Yangtze River running through the urban area,the Wuhan one divides into three, the formation of Wuchang, Hankou,Hanyang cross river tripartite confrontation pattern. The city is also the world per capita in Wuhan city water up.Although the Wuhan adequate water, but with the development of the city,water pollution is serious day by day, grow with each passing day, in order to protect the water quality situation of the main river of the Yangtze River in the country, it is necessary to build plant of Wuhan treatment of domestic sewage and industrial wastewater treatment, treatment compliance after discharge to the receiving water, avoid the water quality deterioration.III.II The climate environment survey of Wuhan city (1)the direction of the windThe dominant wind direction: Northeast wind.(2) the temperature Wuhan belongs to the subtropical humid monsoon climate zone. There is warm, wet winter and spring drought, summer rainy, winter and less snow, four distinct seasons.The average annual temperature is 16.7 , the average July temperature up to 28.9 , in January only 3.5 .High summer temperatures, the temperature above 35 for 40 days or so,extreme maximum temperature of 41.3 , the extreme minimum temperature of -18.1 .Continuous Wuhan day temperature 10 period up to 235 days, the annual average frost free period 240 days.The annual average precipitation 1284.0mm, rainfall concentrated in the April to September, the average annual evaporation capacity of 1391.7mm, annual average 16.4 millibar absolute humidity, annual average relative humidity of 75.7.(3) Geological conditionsLying to the East West High low, the north south high low middle Yangtze River, Han River, is shaped like the letter Y is cut into three pieces, called the towns of Wuhan.Wuhan City, with an average altitude of 23.3 meters, the highest elevation of 873 meters, the minimum altitude of 11.3 meters. Frozen soil layer is 0 meters.Factory covers an area of about 560000 square meters, near the Han River,relatively flat terrain, elevation difference can be neglected, the whole is rectangular, about 800 meters long, 700 meters wide.III.III treatment scaleThe design of the sewage treatment plant design for the total size of the 120000m3/d, variation coefficient of 1.3. Wastewater treatment plant water by flow design of the highest daily maximum, a design, implemented in two phases.III.IV The water quality of influent and effluentSewage treatment plant influent water quality and sewage treatment effluent quality as described in the following table: Table 1 Wuhan sewage treatment plant water statusProjectCOD(mg/L)BOD5(mg/L)NH4-N(mg/L)SS(mg/L)TP(mg/L)PHInfluent water 3003002022027.4Effluent water60208(15)20169IV Sewage treatment processAccording to the domestic and foreign has been in operation for medium and small sewage treatment plant investigation, to set the goal of governance and economic and reasonable, the design can be used AB process.V The design resultsThe engineering structures include grid and pumping station, grit chamber, A segment in the aeration tank, the middle sedimentation tank, B section of aeration tank,two sink the pond, disinfecting tank, sludge thickening pool; auxiliary structures including the blower room, chlorination room, sludge dewatering room and office building, workshop, warehouse etc.The main structures and design results in table 2: Table 2 the main treatment structures listSerial numberBuilding namequantity(Block/Grid)Size(m)1Pumping station112.06.02Aerated grit chamber218.03.03A section of aeration tank442.07.744Intermediate sedimentation tank2D=45.55B section of aeration tank848.58.06Two stage sedimentation tank4D=417Disinfecting tank13527.58Sludge pump212.06.09concentrated tank1D=3410Sludge digestion tank2D=3511The mud storage tank1D=13.312The air blower room120.010.0IX1前言水是人类及一切生物赖以生存的必不可少的物质基础,是维系地球生态环境可持续发展的首要条件,是工农业生产、经济发展和环境改善不可替代的极为宝贵的自然资源。目前人类面临着水量危机,水质危机也在日趋严重,水资源问题不仅影响、制约现代社会的可持续发展,而且已成为21世纪全球资源环境的首要问题,直接威胁人类的生存和社会发展。因此,采取积极措施保护水资源,防治水污染,才能使人类实现自身的可持续发展。我国是人口大国,城市经济迅猛发展的同时,也带来了新的环境污染问题。废水进入环境后,对人体,水体,土壤,动物等产生巨大的危害,严重影响人与自然的和谐共存,制约了经济的发展。因此,在城市中修建污水处理厂,将人们生产生活产生的污水进行收集处理达标后排放是非常必要的。对此,各级政府给予了高度重视,加大了对城市污水处理厂工程的投资力度,引进了许多国内外先进的系统设计技术和设备;国内科技人员也研究出了许多城市污水处理厂的新工艺、新技术,新建造了300多座城市污水处理厂工程,并正以每年几十座的速度增加,为我国城市污水处理事业迅速发展起到了推动作用。污水处理厂多以二级生物处理为主,其中城市污水处理厂大部分采用好氧生物处理方法,其中活性污泥法的应用较广,其作用机理是利用污水中所含的有机物作底物,通过污泥中的微生物对有机物的吸附降解达到处理污染的效果。活性污泥法经过几十年来的运用和改良,现在已取得较好的处理效果。从传统活性污泥法到现今的氧化沟工艺、AB法等都属于该范围内。AB法即吸附生物氧化处理法,它是德国亚琛大学B0HUKE教授于70年代中期开创,80年代初开始应用的工程实践。AB工艺是根据微生物生长繁殖及其基质代谢的关系而确定的,并充分考虑了污水收集、输送系统中高活性微生物的作用,通常维持A段在极高负荷下,使微生物处于快速增长期以发挥其对有机物的快速吸附作用;维持B段在极低负荷下运行,利用长世代期微生物的作用,保证出水水质。AB法与传统生物处理方法比较,在处理效率、运行稳定性、工程的投资和运行费用等方面均有明显优势。1.1设计背景1.1.1污水国内外排放、处理现状 (1)国外现状19世纪以来,经济发达的国家相继出现了环境污染和社会公害问题,许多国家的河湖水域溶解氧降低,水生生物减少,甚至绝迹。由于水环境污染,人类发病率增加,政府开始认识到加强污水处理的必要性,并投以大量资金修建污水处理工程。经过30多年的大力整治,付出巨大代价,才基本控制了形势,使水生生物恢复生长,水环境得到改善。这种污水处理事业与经济发展不相适应的状况所造成的损失是极大的,教训是深刻的。为此,各国政府对于污水处理工作极为重视,从法律和建设资金上给予保证,并不断开拓新技术,使城市污水处理事业得以迅速发展。美国是目前世界上污水处理厂最多的国家,平均5000人就有1座,其中78%为二级生物处理厂;英国共有处理厂约8000座,平均7000人1座,几乎全部是二级生物处理厂;日本城市废水处理厂约630座,平均20万人1座,但其中二级处理厂及高级处理厂占98.6%;瑞典是目前污水处理设施最普及的国家,下水道普及率99%以上,平均5000人1座污水处理厂,其中91%为二级生物处理厂。这些国家的经验表明,大力兴建二级处理厂对改善水体卫生情况起了很大的作用。如美国7000多条河流的水质有了明显改善;日本不符合环境标准水域,已从1971年的0.6%下降到1980年的0.05%;欧洲莱茵河的有机污染已基本控制,部分河段水质明显改善,鱼类复生;英国泰晤士河绝迹了100多年的鱼群又重新出现,目前已达119种。目前,发达国家基本上普及二级处理。但二级生物处理耗能多,运行费用高,基建投资也不低。发展中国家普遍“建不起”,或是“养不起”,因此纷纷寻求适用于本国国情的经济高效技术。就连美国也因废水处理费用的高昂引起了众多的非议。据悉,美国每年二级生物处理厂所耗能量费用已超过10亿美元,因此他们也在大力研究新技术或改革传统的工艺。 (2)国内现状我国污水处理应追溯到上世纪二十年代,快速发展阶段是在近20年左右,但是发展的速度远远滞后于城市发展的需要。 到2000年,建设城市污水处理厂426座,这些污水处理厂大大的提高了污水处理的水平,但还是跟不上快速发展的需要,周而复始,排放和处理的差距在逐渐的加大,这样的趋势,不但影响我国居民的身体健康,而且制约我国经济的快速发展。据统计,目前全国年排污量约为350亿立方米,但城市污水集中处理率仅为15,全国超过80的城市污水未经任何有效的收集处理就直接排放到附近的水体,使得原本具有泄洪和美化景观作用的河渠变成了天然污水渠。特别是在全国2200座县城与19200个建制镇中,污水排放量约占污水排放总量的一半以上,但这些中小城市(镇)的污水处理能力都明显低于全国平均水平。我国的污水处理事业的实际情况是污水处理率低,很多老城区的排水管网甚至不成系统。城市污水处理能力增长缓慢和污水处理率低是造成我国水环境污染的主要原因,由此导致了水环境的持续恶化,并严重的制约了我国经济与社会的发展。1.1.2 武汉市背景资料武汉地处长江中下游,东经1134111505,北纬29583122。最东端位于新洲区徐古镇将军山村,最西端位于蔡甸区侏儒街国光村,最南端位于江夏区湖泗街道均堡村,最北端位于黄陂区蔡店街道李冲村。形似一只自西向东的彩蝶。在中国经济地理圈内,武汉处于优越的中心位置,被誉为中国经济地理的“心脏”。2011年末,武汉全境面积8494.41平方公里,为湖北省面积的4.6%;市域周长977.28公里,7个中心城区面积863平方公里,建成区面积807.54平方公里(不含水域面积)。截止到2012年年末常住人口1012万人,比上年增加10万人。武汉属亚热带季风性湿润气候区,具有雨量充沛、日照充足、四季分明,夏高温、降水集中,冬季稍凉湿润等特点。1.1.3 设计资料 (1)设计规模污水设计流量12万m3/d,变化系数:Kz=1.3。 (2)气候条件武汉地处我国东部沿海向内陆过渡地带,地处中纬度,属亚热带湿润性东南季风气候区。具有冬寒夏暖、春湿秋旱、夏季多雨、冬季少雪、四季分明的特征。年平均气温为16.7,7月平均气温高达28.9,1月仅3.5。夏季气温高,35以上气温天数为40天左右,极端最高气温41.3,极端最低气温-18.1,武汉日均温10持续期达235天,年平均无霜期240天。年平均降水量1284.0mm,降雨集中在49月,年平均蒸发量为1391.7mm,绝对湿度年平均16.4毫巴,年平均相对湿度75.7。武汉常年主导风向为东北风,风向频率(%):30,年平均风速为1.3米秒。 (3)地质条件武汉地处江汉平原东部,地理位置介于东经1134111505,北纬 29583122。地势为东高西低,南高北低,中间被长江、汉江呈Y字型切割成三块,谓之武汉三镇。武汉市平均海拔为23.3米,最高海拔为873米,最低海拔为11.3米。最大冻土层为0米。 (4)受纳水体汉江,又称汉水,汉江河,为长江最大的支流。汉江流经陕西、湖北两省,在武汉市汉口龙王庙汇入长江。河长1577千米,流域面积1959年前为17.43万平方千米,位居长江水系各流域之首;1959年后,减少至15.9万平方千米。干流湖北省丹江口以上为上游,河谷狭窄,长约925km;丹江口至钟祥为中游,河谷较宽,沙滩多,长约270km;钟祥至汉口为下游,长约382km,流经江汉平原,河道婉蜒曲折逐步缩小。汉江历年最高水位为19.54米,最低水位为16.25米,平均水位为17.85米。 (5)厂区概况厂区占地约56万平方米,临近汉江,地势较平坦,高差可忽略,整体上为长方形,长约800米,宽约700米。(6)进、出水水质进水水质:表1-1-1 污水处理厂进水水质指标CODBOD5NH4-NSSTPPH单位(mgL)3003002022027.4出水水质:受纳水体汉江属于类功能水域,故出水应符合城镇污水处理厂污染物排放标准(GB18918-2002)中的一级B标准。即:表1-1-2 污水处理厂出水水质指标CODBOD5NH4-NSSTPPH单位(mgL)60208(15)20169 注:括号外数值为水温12时的控制指标,括号内为水温12时的控制指标。1.2 污水厂的设计原则 (1)适用性。设计必须符合适用要求,选择的处理工艺流程、构筑物型式、主要设备等应最大限度地满足生产和使用的需要,以保证污水处理厂功能的实现,达到国家排放标准的要求。 (2)可靠性。设计中采用的各项设计参数都必须可靠,在污水处理设计中一定要遵守现行的设计规范,保证必要的安全系数。且应慎重使用新材料、新设备、新技术和新工艺。 (3)合理性。设计必须符合经济合理的要求,尽可能采取合理措施降低工程造价和运行管理费用。 (4)先进性。在保证安全可靠的前提下,尽可能采用先进的工艺、机械和控制技术。 (5)近远期结合原则。设计应进行近期与远期的规模研究,以合理确定工程分期,全面进行规划,为今后的扩建留有空间和条件。 (6)安全性。设计中须考虑安全运行要求,如适当设置分流设施、超越管线、防止有毒有害物质逸散、考虑消防安全等。 (7)美观性。在经济条件允许情况下,应适当考虑厂区的美观和绿化,并与厂区周围景观相协调。 (8)设计中应考虑能够妥善处理和处置污水处理过程中产生的栅渣、沉砂和污泥,避免造成二次污染。 (9)污水处理厂征地范围内,厂区总平面布置力求在便于施工、便于安装和便于维修的前提下,使各处理构筑物尽量集中,节约用地,扩大绿化面积,并留有发展余地。使厂区环境和周围环境协调一致。1.3 设计方案论证1.3.1 污水特征本设计处理污水的特点:污水以有机污染为主,BOD5/COD=1,可生化性较好。污水中主要污染物指标BOD5、COD和SS相对国内一般城市污水较高,同时有脱氮要求。污水处理厂投产时,多数重点污染源治理
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 幸福的花朵图谱课件
- 巡线安全培训内容课件
- 输电线路施工图识图课件
- 小龙虾解剖课件
- 大摩中金投资合作终止协议
- 超高层建筑工程安全管理与监理协议
- 高校与企业联合培养实习生就业协议
- 担保借款合同主体变更后的信用评估与风险管理
- 互联网电商平台运营经理岗位聘用及数据安全合同
- 建筑装修工程施工合同范本
- 实验小学二年级体育集体备课教案
- 网络游戏内容审核与监管标准
- 李白课件教学课件
- 车床上下料方案一对二
- 公墓建设申请审批表
- 2025年高考语文一轮复习策略讲座
- WelcomeUnit单词讲解教学设计-2024-2025学年高一英语人教版(2019)必修第一册
- 医用耗材供货应急服务方案
- 设计和开发控制程序-国军标
- DL-T5707-2014电力工程电缆防火封堵施工工艺导则
- 《研学旅行课程设计》课件-制订研学课程目标
评论
0/150
提交评论