全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Comparative analysis of the Public works construction managementAbstraction:There are some advantages and disadvantages during the traditional mode of public works construction management, building center and construction agent in public worksKey word:public work,management.Traditional construction management mode can make a solid foundation for the carrying out of the projects, and that is because the government plays an important role in public works and they have a good cooperation. In the other hand, the owner status is unclarity under this mode, moreover, it also brings out trouble waters in management and will have bad influence in supervision mechanism. In the background of the mode, the project management is backward and the risk aversion mechanism is not perfect, the investment benefit and social benefit for the government is not perfect. First, building center mode is realizing the centralized management, making the main responsibility clear, and resolving the problems in the phenomenon of the absence of specific oversight of the government investment projects, it can help preventing corruption, which brings out a certain degree of centralized management. There are a number of professional and professionals and technical will be trained well. Compared with traditional construction management, achievement projects undertake a government investment projects, and carry out by the planning department, the formulation of the base bid and the contracts must be reviewed by the audit department. The project bidding including the bidding units prequalification must accept the supervision of the City Construction Bureau. And the project funds are paid directly by the Bureau of Finance, and accept the supervision of it. It can be said that, the construction center is to be responsible for the quality, safety, and duration of construction projects, it has no right to control i the other key issues. Especially the implementation of fiscal consolidation pays for projects uniformly, and that makes the construction of the center become a veritable blank checks. Engineering construction center just invest on his behalf, it did not solve the problem of the role of government confusion completely. There is no better incentive and monitoring mechanisms for it, lacking of initiative of the constraints investment cost makes construction of the center establish to increase the government establishment and financial burden, With the increasing in government investment, the construction center will be at a loss, and it will be limited by the subject to the annual scale investment.Secondly, construction agent in public works can play its role of social intermediary institutions and professional management well. Because it is a model for phase separation Agent Unit and use units, which is the further deepening of the reform of the investment system and agrees with the reform government investment project management mode principles. Because of the relationship between the agent and the principal, the construction agent has the responsibility of exercise investment as a non-government organization and is responsible for government, it also can strengthen budget constraints, the professionals were involved in the preliminary design stage and they participated in the whole process in the management. Although, the pre-management fee was increased, the effective of investment constraints and controlling investment is available. The disadvantage of it is the supervision of the government at this stage indirectly, and it may even be weakened, and at the same time, the efforts of construction management and coordination were weakened, which may create some bad influence in public works. In most cases, the project bidding project management company is responsible for producing the phenomenon of runaway government investment. At present, the various oversight mechanisms at this stage is not perfect, which may lead to a bad phenomenon of running out of control of working management.The mode of management was intervened by government can resolve the financing problem, it can help clear the main part of investment responsibility.The relationship between agent and principle can not control the management well. Through this way, the government can get more social funds and helping absorb social funds and expanding the financing channels for government investment projects. Compare with foreign government project management mode, it can be found that the creation of specialized management agencies of the government investment projects in Hong Kong, such as Works, centralized and professional management, are more appropriate. the establishing of public works construction center also base on the real practice. In Britain, they set up the government projects according to their specific nature and adopt different management mode. Through the analysis, it can be found that Britain supports to establish some independent mechanism to invest and use land. Though the institutions responsible for works is setting up wholly owned by the government, the management, such as financing, inviting public bidding, daily operation, and other projects about management. In foreign countries, they usually adopt the management mode of private engineering, and it also named BOT, that is because the public works can get a steady return of investment. For the projects invested by government, they take the special government agencies to realize, the management of this is closed management, self-organized construction and management. For construction system, take Singapore as an example, the owners of projects entrusted to engineer consulting firm (usually a design company) to carry out the project feasibility studies, architectural design, structural design, construction bidding, construction supervision and final acceptance. . This is the CM mode. Pure industry management behavior plays a government role of guidance, coordination, service, and supporting, it doesnt involve the internal management of construction enterprises, and it does not other investment activities directly. In fact, it is an i
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026上海春季高考物理考试总复习:曲线运动、平抛运动(知识梳理+考点讲义)原卷版
- Unit 3 Curious minds(单元测试·基础卷)解析版
- 2026届高考数学总复习:立体几何中的翻折、探索性和最值、范围问题
- 医学帕金森病多巴治疗案例分析课件
- 2026外研版高考英语复习讲义 必修第三册 Unit 4 Amazing art
- TXJBX0113-2025水利工程投标全过程合规管理技术规范
- 2026高考物理复习高频考点强化训练:功能关系的综合应用(原卷版)
- 共病疼痛对麻醉药品依赖性评价的影响及对策
- 2026年中国多晶硅产业发展展望及投资策略报告
- 《JBT 6185.9-1992 16mm 槽系组合夹具支承件 三竖槽长方形垫板》(2026年)实施指南
- 血透感染控制监测
- 统编版(2024)八年级上册历史全册教材问题参考答案
- 沙僧介绍课件图片
- 医务人员心理健康教育课件
- 关联交易管理办法模板
- 学堂在线 创业导引-与创业名家面对面 期末考试答案
- 渣土运输保洁方案(3篇)
- 肋骨骨折护理个案
- 2025年焊工(初级)复审考试题库附答案
- 采煤-《标准化管理体系培训课件》
- 2022信息化项目建设预算定额信息系统运行维护
评论
0/150
提交评论