已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Document NumberDocument Name螺杆清洗和保养作业指导 Page (x of y)6 of 6Version01Valid from (dd-mm-yyyy)13-11-2012Standard Operating Procedure(SOP) Cleaning and Maintaining Injection Machine - 清洗和保养螺杆标准流程1. Purpose : Minimizing black dots defects by cleaning injection machine screw safely and maintaining it as much as best condition 目的:正确的清理螺杆,使螺杆达到最佳状态,并最大程度减少黑点。2. Application : This SOP can be applied in cleaning injection machine screw 用途:此用途只用来清洗注塑机螺杆。3. Injection Machine Screw : 螺杆清洗时如图放置4. Operating Procedure : Screw Cleaning 螺杆清洗的操作流程:4-1. Preparing equipments for cleaning Brush, Grinder, Bronze Knife and Cleaning Cloth, etc 准备工具:刷子、打磨片、铜刀、清洁布等如图所示4-2. Preparing equipments for safety Face mask, Heat resistance glove, etc 防护用品:面罩、隔热手套等,如图所示4-3. Removing all remained resin in cylinder inside after operating with CF-1051/F18029 按照CF-1051/F18029标准清除料筒内部残留塑料4-4. Adjusting cylinder temperature as followings after removing all remained resin 清除所有残留后,把料筒各段温度调整至如图所示:4-5. Nozzle H1 H2 H3 200 190 190 160 4-6. Cleaning(pursing) with SAN resin(HR-5330) after cooling down 待温度降至上表设定值后,用SAN料清洗。4-7. Starting disassembling of screw after enough cleaning 在充分清理后,拆卸螺杆。4-8. Removing resin on the surface of screw as following procedure after cooling in air 待螺杆冷却后,依照下列步骤清除螺杆表面的塑料。4-9. Removing cooling downed SAN(HR-5330) resin by knocking with bronze knife 待冷却后,用铜刀去除螺杆表面的SAN料,如图所示:4-10. Removing all remained resin with grinder as followings 用铜质打磨片对螺杆表面进行抛光,如图所示: 4-11. After grinding, disassembling “check-ring” in the front of screw 打磨后,拆卸螺杆三件套进行检查4-12. Burning disassembled front of screw and check-ring in the furnace at 500, 10mins 把三件套加热至500,保持10分钟。4-13. Cleaning inside of barrel with stick coved by cloth 用布清洗螺杆内壁;4-14. Assembling screw 组装螺杆5. Maintaining injection machine : 注塑机维护5-1. Maintaining injection machine as “power on as lower temperature during non-operating time 在机器不运行时,炮筒温度尽可能降低。5-2. Recommended temperature 建议设定温度如下: Nozzle H1 H2 H3 120 120 120 120 * Its most important factor which is related with burning of resin inside cylinder (原料在高温下长时间停留在炮筒内壁是导致原料碳化的主要原因)5-3. Screw cleaning is recommended after long-term non-operating period 建议当机器长时间不运转时清理螺杆【Workplace Safety Precautions 工作区域安全防范1) Wearing safety equipments for avoiding the risk of burn by high temperatured resin (heat resistance glove, apron, etc) 为避免高温塑料的烫伤,在工作之前应穿戴防护用品。如:隔热手套等。2) Wearing safety goggles for protecting eyes by resin particles during removing resin on screw 清理时戴防护眼镜。3) Power-off the injection machine during screw cleaning 在清理时关闭机器电源。4) Power-on during assembling screw 安装螺杆时打开电源。5) Starting procedure of screw assembling after checking set-value and present-value temperature 在检查设定值和当前温度值后,开始按作业标准安装螺杆6) Operating should be pair work (two person in group) 以两人一组完成工作。 Prepared byLimei DengReviewed byGuangbing QinApprove
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026届安徽省五校联考高三上学期11月月考历史试题(含答案)
- 2025-2026学年北京版(新教材)二年级上册数学第五单元测试卷(表内除法)附参考答案
- 职业性急性有机磷中毒的护理
- 2026年设备监理师之设备工程监理基础及相关知识考试题库200道附完整答案(各地真题)
- 2026潍坊银行校园招聘备考题库附答案
- 2026秋季中国电科三十六所招聘备考题库附答案
- 2025年商洛公费师范生及优师计划招聘(95人)备考公基题库附答案解析
- 中国铝业集团有限公司2025年春季校园招聘及社会招聘备考题库附答案
- 2025年萍乡市妇幼保健院招聘编外人员(第二批)17人参考题库附答案解析
- 2026年投资项目管理师之投资建设项目实施考试题库200道附参考答案【预热题】
- 党的二十届四中全会精神丨线上知识有奖竞答题库
- 组织文化论文题目选题参考
- 2026云南云天化石化有限公司校园招聘9人考试笔试备考题库及答案解析
- 银行风险管理体系建设操作方案
- 海域云:2025年中国户用储能行业出海研究报告
- 职业生涯规划计划书(34篇)
- 大量出血患者的输血方案
- 2025-2030中国眼视光行业现状态势与未来前景预测报告
- (正式版)HGT 22820-2024 化工安全仪表系统工程设计规范
- “十四五”全国国有资本布局与结构调整规划
- 火电厂润滑油系统介绍
评论
0/150
提交评论