




已阅读5页,还剩15页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Two box shock box internal parameter manualThe use of manual1-1、Boot the system interfaceTT-5188 Said controller modelFig1-1-1(Boot interface)Boot progress barFig 1-1-2(Boot interface)1Click on the circle region into the monitoring interface65432NOProjectContentD.NOThe operating setEnter the operation setting function interfaceFig1-1-2SetupEnter the program setting function interface Alarm historyEnter the alarm records query System settingsEntering system maintenance query The monitor screenMonitoring with data interface Curve displayCurve 、 Query and display dataDisplay the current status1-2、The main monitoring interface Fig 1-2-1(The main monitoring interface)43PID OutputLow temperature impactThe high Temperature impact12657NOProjectContentD.NODisplayThe test tank temperature displayFig1-2-1Set upThe test tank SV setting temperatureCycleSV/PV00002 set cycle, 00001 for the actual operation cycleSet timeThe current impact section set for 10 minutesPeriod of time leftThe current impact section 6 minutes leftRun timeRun time, has been in operation for 5 minutesTime displayDisplay the current date, time display box click time into a black screen protection(picture where there is time display box, click can enter the black screen protection)KeepKeep the timing of the current sectionStepRun the current segment, according to the hop s forced into the next sectionRun / stopStart and stop device buttonThe test tank temperature display Fig 1-2-2(Detailed interface)TSP says the temperature settingThe red box indicates the output function21 NOProjectContentD.NOThe high temperature chamberPV said the current temperature of high temperature test tank, SP said the high temperature test tank temperature setting, is currently the impact of high temperature, high temperature trough PID test tank PID to the switch, so the high temperature trough MV hideFig1-2-2Low temperature chamberPV said the current low temperature test tank temperature, SP said the low-temperature test tank temperature setting, MV said PID output Schematic diagram of two kinds of operation mode High temperature + Low temperature model Low temperature + High temperature model1-3、Setup Fig 1-3-1(High temperatureLow temperature mode interface)465321 NOProjectContentD.NOPTN NO Program number set, each program code representing the 1 sets of procedures ,a total of 1127 sets of proceduresFig1-3-1CYCLE/ENDCycle/end, cycle as the cycle number of total end program, implementation function as the program ended, divided into two kinds:1、 Said stop after defrosting2、 Said the last cold punching or hot flushes directly stopPTN NAMEAccording to the demand of can arbitrarily change the program namePROG CONNClick Connect to enter the program interfaceH.TEMPSetting: 80 DEG C high temperature, shock temperature according to the need of the test set.Setting time: H hours, M minutes respectively to test based on the need to set the impact time.Temperature compensation: Storage temperature compensation valueL.TEMPTemperature: -20 degrees, the impact of temperature according to the need of the test set.Setting time: H hours, M minutes respectively to test based on the need to set the impact time.Temperature compensation: Storage temperature compensation value Fig 1-3-2(Low temperatureHigh temperature mode interface) 1-3-3、Impact analysis modelImpact mode type icon:TYPE-1 High temperature low temperature impact mode iconTYPE-2 Low temperature - The high temperature impact mode con1-4、Curve dataFig 1-4-1(Curve data interface)86431752NOProjectContentD.NOChoosThe query in different time curveFig 1-4-1DownDownload historical curve, to the U disk for the BMP filePV/SV Press PV/SV to display or hide the control curveDataView historical data contentSampling timeIn seconds, according to the requirements of 30S,60S, can choose90S, 120S,150S,180SCurve rangeAccording to the selected temperature range the demand curveCurve of timeIn hours, according to the demand curve X axis can be selected time range,4H,8H,16H,24H, 48H,96HTime01-29 09:10 said the 01 month 29 day at nine tenFig 1-4-2(Historical data interface) 321 NOProjectContentD.NOChoosAccording to the query, can choose the data starting time(Fig 1-4-3)Fig 1-4-2DownAccording to the download, can downloadthe time period selected data into U disk.(according to need before inserted U disk, click download to wait for about 5 minutes, square can pull U disk, according to the download time long download times may vary) to the U disk to download Excel fileClearAccording to the clear, clear the screen will appear, you can clear all history dataFig 1-4-3(The query graph display interface) NOProjectContentD.NOQueryClick the query automatically pop up, displaying the start timeFig1-4-3 Fig 1-4-4(Download the interface of historical data)NOProjectContentD.NODownloadClick on the download data will automatically pop-up Download Interface of historical data, between the start time from ten oclock to twelve oclock on November 13, 2014 November 13, 2014 data download(according to the demand of query)Fig1-4-4Fig1-4-5(Curve display interface)NOProjectContentD.NOCurve dispiayClick on the download automatically pop-up download small window, not detected U disk will be in the file name input box English tips, detected U disk file name input box will appear blankFig 1-4-51-5、The operating set4321123 Fig 1-5-1 Set interface operationFig 1-5-2 Operation setting interface twoNOProjectContentD.NOKEY LOCKOFF:Elected as a member of OFF, all the operationFig1-5-1ON: election related operations will be locked, the related interface is not operablePower ImpactHot start:in the operation of power outages, call when equipment automatic start, then rundown from power, have been in operation timing and cycle does not clearCold start:in the operation of power outages, call when equipment automatic start, has been running timing and cycle resetPower protecSTOP:In the operation of power outages, equipment does not start automatically when a callCOLD:In the operation of power failure, when a call is automatically restarts, from the beginning of the operationHOT:In the operation of power outages, call when equipment automatic start, from the power outage continued operation (example: when power before running after 1 hours, the caller will continue to run)NOProjectContentD.NODefrosting temperatureSet the defrosting temperatureFig1-5-2The defrosting timeWhen the defrosting temperature reaches 35DEG C, the defrosting time keep 30 minutesDefrostingcycleSet defrost cycle for 5 cyclesManual defrostWhen the interface is displayed in the machine operation manual defrost button, you can perform a manual defrost1-6、System settingsFig 1-6(System settings interface)4213 NOProjectContentD.NORESERVE SETEnter the pre setting interface(Fig 1-6-1)Fig 1-6SYS MAINTENEnter system maintenance interface(Fig 1-6-2)SCREEN SETEnter the screen setting interface(Fig 1-6-3)MENUEnter the directory interface(Fig 1-6-4)1-6-1、Pre settingFig 1-6-1(Pre setting interface)312NOProjectContentD.NOAn appointmenttimeWhen the appointment start can be pre-set time, when the system time, can automatically boot device(the device needs to be energized)Fig1-6-1Appoint OFFThe appointment start open, when the time to make an appointment, the system automatically boot deviceDate of adjustmentWhen the system shows the time difference, can be set up, set up after the click, the date and time to adjust to determine1-6-2、System maintenance Fig 1-6-2-2(Thermal relay maintenance)Fig 1-6-2-1(The main power switch maintenance) Fig 1-6-2-3(Cooling tower maintenance)Fig 1-6-2-4(Over temperature protector action test) Fig1-6-2-5(Maintain pressure protection switching test)Fig1-6-2-6(The total pressure maintenance valve drainage)0030021-6-3、Screen settingFig 1-6-3(Screen setting interface)231 NOProjectContentD.NOLANGUAGEClick Chinese to Chinese mode, click English to English mode s wit ching according to the demand ofFig1-6-3TUNING KEYWhen ON and run time, will appear on the monitor screen setting button.When OFF and run time, monitor screen no buttonLIGHT OFFSet the screen automatically Screensaver time. (screen time to will appear after the black screen)1-6-4、Catalog Fig 1-6-4-1 The directory interfaceCases:Click the directory into the directory interface, as shown in Figure1-7、Alarm history interface123NOProjectContentD.NOStart timeRecord the alarm start timeFig1-7 End TimeRecord the recovery of the alarm timeContent of the alarmRecord the alarm contentThe attached page:Suggest a small interfaceNOProjectThe pictureInterpretation1The startup screenStart:Device operation the start button2ExecutionStop itPrompt:Execution stops
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年杭电电子考研试题及答案
- 2025年园林绿化作业人员考前冲刺练习附答案详解(培优A卷)
- 2025年远程协作的工具与技术
- 2025年远程教育的学习效果比较分析
- 综合解析人教版8年级数学上册《轴对称》专项练习试卷(解析版)
- 医学检验(中级)能力检测试卷及答案详解1套
- 2024年职称计算机考前冲刺测试卷含答案详解(预热题)
- 聊城安全员a证考试及答案
- 山西2025年考安全员b及答案
- 2025年企业办公室租赁合同
- 南京市、盐城市2025届高三年级第一次模拟考试(一模)英语试卷(含答案)+听力音频
- 羊水异常课件
- 煤矿“冬季四防”专项安全风险辨识评估报告
- 小儿链球菌感染护理查房
- 肿瘤免疫治疗不良反应
- 竞聘医疗组长
- 路易斯·康获奖课件
- 第一次月考 (1-2单元)(月考)- 2024-2025学年六年级上册数学人教版
- 中国的自然环境单元教学设计 湘教版
- DL∕ T 895-2004 除灰除渣系统运行导则
- 医疗装备应急管理与替代程序试题
评论
0/150
提交评论