




已阅读5页,还剩12页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CSPC Nanhai Petrochemicals ProjectSEPCO Electric Power Construction Corp CSPC 南 海 石 化 项 目发电机电气试验作业指导书GENERATOR TEST工作程序: WI-8710-8100-0062山东电力基本建设总公司 版次日 期出版原因编写校核审查批准AJanuary 12, 2004Issue For Review And ApprovalZhang .FGLi .WQXiao .TPTian .GHBMar 4, 2004Issue For Review And ApprovalZeng .GYLi .WQXiao .TPTian .GHCApr 24, 2004Issue For Review And ApprovalZeng .GYLi .WQXiao .TPTian .GH版次REV章节号Section No.修改内容Description of main changesAB工作步骤不够详细The work process is not detailed enough. 增加和完善了工作步骤Add and improve the work process.C工作步骤不够详细The work process is not detailed enough. 增加和完善了工作步骤Add and improve the work process. 修改纪录The modification records目 录Contents1.0 工程概况 Gnereral introduction 2.0 编制依据 References 3.0 施工准备 Construction preparation 4.0 主要施工机械及工具 Main machinery and tools 5.0 试验项目 Test items 6.0 劳动力组织 Labor force 7.0 施工工序和施工方法 Construction procedure and plans 8.0 工作安全分析 JSA 1.0 工程概况:General introduction 中国南海石化汽电联产项目共有五台发电机,其中:There are 5 generators in Steam & Power unit for CSPC Nanhai petrochemicalsproject, thereinto: 燃气机组(1台) 型号:TA30-46 有功功率:42.4MW 视在功率:53MVA 功率因数:0.8 电压:1110.0%kV 额定电流:2748A 频率:50HZ 转速:3000转秒 相数:3相 联结方式:星型 生产厂家:ALSTOMOne used for gas turbine unit: TYPE:TA30-46, Active power:42.4MW, Apparent power: 53MVA,Power factor:0.8, Rated voltage: 1110.0%kV, Phase:3相,Rated current:2748A , Frenquency:50HZ, Rotation speed:3000转秒, Coupling of phase:star Manufacturer:ALSTOM汽轮发电机(4台)型号:TLRI 92/26 容量:75MVA 功率因数:0.8额定电流:3936A 电压范围:+10.0-10.0% 额定电压:11kV频率:50HZ 转速:3000转秒 相数:3相 联结方式:YY 生产厂家:SIEMENS AGSteam Turbine Generators(14): TYPE:TLRI 92/26, Capacity:75MVA, Rated current: 3936A,Voltage range: 1110.0% kV,Power factor:0.8, Phase:3相Frenquency :50HZ, Rotation speed:3000转秒, Coupling of phase:YY Manufacturer:SIEMENS AG2.0 编制依据:References 2.1 DEP 63.10.08.11 Field Commiss & Main of Elec Installations Equip.2.2 电气装置安装工程电气设备交接试验标准(GB5015091) Standard for electric equipment test of electric equipment installation engineering(GB5015091)2.3 电力建设安全工作规程DL5009.1-92 Safety work regulations of electric power constructionDL5009.1-922.4 发电机出厂技术资料 Ex-factory technique information 2.5 发电机出厂试验报告 Ex-factory test report3.0 施工准备: Construction preparation 3.1 发电机已运至现场就位安装,外壳接地良好,绕组引出线与地安全距离充足。 The generator has been delivered and located and installed on the site, the casing earthed well, and enough distance is necessary between the lead-out wire of stator and earth. 3.2 现场已清理干净、道路通畅。 The site has been cleaned up, and the road is unblocked. 3.3 本作业指导书及安全技术措施已编制审批完毕,对所有参加试验人员交底并签字,交底记录齐全。 The preparation of the work instruction and safety technique measures has been completed, and the examination and approval also has been done. All personnel attending the test have been told the real intentions and sign it up. The record is all ready. 3.4 试验仪器准备齐全,工作正常,试验人员熟悉仪器的使用方法。 The test apparatus has been prepared, and they work in gear. The test personnel are familiar with the using way of apparatus. 3.5 施工图纸及有关技术资料齐全。 The construction drawing and relative technical information are all ready. 3.6 试验所需工具准备齐全。 Tools for test required are all ready. 3.7 试验区域拉好警戒绳,挂上明显的警示牌。 Set the warning rope in test area and hang the visible warning card. 3.8 试验用电源开关要悬挂“试验专用,严禁乱动”警示牌。 The warning card which is saying “ Special for use, dont fiddle with it” from the power switch used for test.3.9 发电机试验应有厂方人员现场技术指导。The testing of generator should be guided by the engineer of manufacturer.3.10 交流耐压试验应在直流耐压试验合格后进行。 Separate source power frequency withstand test should be carried out after DC high potential test passed.4.0 主要施工机械和工具 Main machinery and tools : 4.1 BM11D型数字兆欧表 Digital megohm meter 1块 One 4.2 直阻测试仪 DC resistance tester 1台One 4.3 直流高压发生器 High voltage d.c tester 1台 One 4.4 发电机交流耐压机 High voltage a.c tester 1套 One 4.5 保护球隙 Overvoltage protection 1只 One4.6 多量程直流毫安表 DC milliammeter (0-50-100mA) 1只 One4.7 多量程直流微安表 DC microampere meter(0-100-1000A) 1只 One4.8 多量程交流毫安表 AC milliammeter (0-50-100mA) 1只 One4.9 多量程交流电流表 AC amperemeter (0-2.5-5A) 1只 One4.10 保险丝、绝缘塑料带、导线、电源盘、警戒绳、警示牌等,刀闸、接地线、放电棒、绝缘垫、绝缘手套、温湿度计、支柱绝缘子等,常用工具一套。 Fuse, insulated plastic tape, lead, power supply unit, warning rope, warning card, isolated switch, grounded lead, discharge-staff, insulated bed,insulated glove,hygrothermograph and so on, a set of common tools. 5.0 试验项目 Test items 本工程需要做以下试验,试验数据通过试验报告(附后)。将试验数据与出厂报告中的数据组进行比较分析。验收标准应该遵照厂家提供标准和国标。The following tests shall be conducted and the test results shall be recorded in the attached form(2 sheets). The test results shall be compared with the test results performed at the factory.The acceptance criteria for each test shall be as per Alstoms/GB standards.5.1 测量定子绕组的绝缘电阻和吸收比; Measurement of stator insulation resistance and absorption ratio5.2 测量定子绕组的直流电阻及定子绕组的极性; Measurement of stator DC resistance and polarity5.3 测量转子绕组的绝缘电阻; Measurement of rotor insulation resistance5.4 测量转子绕组的直流电阻; Measurement of rotor DC resistance5.5 测量发电机和励磁机的励磁回路连同所连接设备的绝缘电阻值,不包括发电机转子; Measure insulation resistance of generator and exciters exciting circuits, ex rotor and exciter armature.5.6 发电机和励磁机的励磁回路连同所连接设备的交流耐压试验,不包括发电机转子; Separate source power frequency withstand test of generator and exciters exciting circuits, ex rotor and exciter armature.5.7 测量转子绕组的交流阻抗和功率损耗; Measurement of rotor AC impedance and capacity loss5.8 发电机定子直流耐压及泄漏电流测量(见附图); DC high potential test of stator5.9 发电机定子交流耐压试验(见附图); Separate source power frequency withstand test of stator 注:发电机试验项目的设定以厂家规定为准。Note: Whether or not carry out these test items, abide by the provision of generator manufacturer.6.0 劳动力组织 Labor force : 试验指挥 Test director : 1人 One people 试验监督 Test supervisor : 1人 One people试验记录 Test recorder : 1人 One people 试验操作 Test operator : 3人 Three people7.0 施工工序和施工方法 Construction procedure and plans: 7.1 测量定子绕组的绝缘电阻和吸收比; Measurement of stator insulation resistance and absorption ratio 7.1.1 测量前A、B、C三相绕组分别首尾短接, 使用5000V兆欧表分别测量A-B+C+地,B-A+C+地,C-A+B+地的绝缘电阻及吸收比。 Short-circuit the A、B、C stator winding respectively from beginning to end before testing. Measuring the insulation resistance and absorption ratio of A-B+C+EARTH,B-A+C+EARTH,C-A+B+EARTH with 5000V megger. 7.1.2 每测量完一相后,应充分放电,并挂好接地线后才能换线。 After one phase completes testing, the stator should be discharged adequately and connected to earth before changing the test connection. 7.1.3 吸收比不小于1.3,各相绝缘电阻值的不平衡系数不应大于2。The absorption ratio should not less than 1.3, and the unbalance factor of each phases insulation resistance should less than 2.7.2 测量定子绕组的直流电阻及定子绕组的极性; Measurement of stator DC resistance and polarity 7.2.1 接好测试线并检查其正确性,先测A相,然后B相及C相。 Connect the test connection correctly, measure stator DC resistance of A phase, then B phase and C phase.7.2.2 被测绕组两端接线要求电压线内接,测试线应有足够截面并与绕组引出线接线板接触良好。 Internal connect the voltage wiring. The test wiring should have enough section, and connected to the stator winding all right. 7.2.3 检查接线无误后,合上仪
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年市民防震减灾科普知识竞赛判断题库及答案
- 民族弹拨乐器制作工节假日后复工安全考核试卷含答案
- 2025年麻醉、精神药品培训考试题及参考答案
- 惠东中考语文试题及答案
- 2025年电气自动化试题及答案
- 环己胺装置操作工节假日后复工安全考核试卷含答案
- 轧制备品工节假日后复工安全考核试卷含答案
- 家用电冰箱维修工节假日后复工安全考核试卷含答案
- 苗木养护培训考试题
- 刨花板热压工节假日后复工安全考核试卷含答案
- GB/T 3785.1-2023电声学声级计第1部分:规范
- j11pro固件爵聆数播说明书
- 第四版环境工程微生物学课后习题答案
- 房地产营销渠道拓客培训
- 电容式电压互感器试验指导方案
- GB/T 10781.2-2022白酒质量要求第2部分:清香型白酒
- GB/T 23353-2009梨干技术规格和试验方法
- FZ/T 52003-2014丙纶短纤维
- 百善孝为先主题班会课件
- 招商银行智慧营销体系规划方案((2022年-2023年)-2022)
- 人教版小学数学六年级下册《斐波那契数列》课件
评论
0/150
提交评论