




免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1.01.1STAGES OF COMPLETIONMechanical CompletionMechanical Completion shall have been achieved when all construction activities,installation work, static (non-functional) testing have been completed anddocumented in accordance with the Contract Documents. At this point, the turnoversystem or the Facility, as applicable, will be ready to start Precommissioningactivities. Mechanical Completion shall include completion of the followingactivities:1.1.1Civil WorkAll excavation, backfill and compaction work is complete.All underground sewers and pressure pipe have been installed and tested.All finish grading and paving is complete, and the Site has been checked for properdrainage.1.1.2Concrete WorkAll concrete foundations and structures are complete.All grouting of Equipment and supports is complete.All fireproofing (structural steel, Equipment supports and skirts, cable tray and otherrequired items) is complete.1.1.3Structural Steel WorkAll structural steel, ladders, platforms, stairways and walkways are erected.All bolted connections are tightened.All welded connections and required non-destructive examinations are complete.1.1.4Building WorkAll buildings are constructed.All building architectural finishes and schedules are complete.All building mechanical, electrical, control systems and protection systems installationshave been checked and statically tested.1.1.5Mechanical WorkAll mechanical Equipment requiring hydrostatic testing has been tested at themanufacturers shop or at the Site, as required.All Factory Acceptance Testing (FAT) of machinery and Equipment, as required, iscomplete.All vessel internals (with the exception of chemicals and catalysts) have been installed,checked and tested where required, and vessel interiors have been cleaned and checkedfor removal of all debris. With the exception of vessels requiring installation ofchemicals and catalysts, final closure of vessels is complete.All final cold alignment checks between rotating machinery and their drivers arecomplete and documented.All tanks have been constructed, hydrostatically tested, drained, cleaned and final closureis complete.All fired heaters and boilers have been erected, including installation of all internalrefractory and insulation.1.1.6Piping WorkAll piping systems have been installed and checked.All fire control and fire protection hardware has been installed.All piping connections to rotating machinery have been checked for proper alignment andclearance.All non-destructive examinations and static pressure testing is complete.1.1.7Electrical WorkAll electrical Equipment, junction boxes, panels and fixtures have been installed and allstatic checks and tests are complete.All grounding, cable and wire installations are complete and have been checked.All required insulation resistance tests are complete.All dielectric testing of medium voltage (6kV) and high voltage (35kV)cable is complete.All cable and wire terminations have been checked.All panel schedules are complete, current and properly labeled.1.1.8Control Systems WorkAll instrument bench calibrations are complete.All Factory Acceptance Testing (FAT) and installation of the DCS is complete.All control panels, marshalling cabinets, junction boxes and instruments have beeninstalled and all static checks and tests are complete.All cable and wire installations are complete and have been checked.All cable and wire terminations have been checked.All process leads and tubing have been installed and pressure tested.All panel schedules are complete, current and properly labeled.All fire protection, and fire and gas detection controls and instruments have been installedand checked.1.1.9Paint and Insulation WorkAll painting and insulation is complete to the greatest extent possible.1.1.10DocumentationAll system turnover packages have been assembled, their contents checked forcompleteness and accuracy, and the packages have been reviewed and confirmed by theProject Company to be complete.All Specifications and Drawings requiring as-built updates have been updated. One copyof manual updates (red lines) has been transmitted to the Project Company.1.1.11Operator TrainingContractors formal classroom training program for Project Companys operatingpersonnel for the Facility is complete.1.1.12Spare PartsAll Spare Parts and special tools required for commissioning and startup have been turnedover to the Project Company.All Spare Parts have been delivered to the Site.1.1.13Site Clean
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年高端钢结构建筑改造与加固施工合同
- 2025年生物制药企业定制化生产合作合同标准
- 2025年度城市绿化工程项目设计与施工合同
- 2025年城市地下停车场项目造价结算合同范本
- 2025年节能玻璃产品模具改造与环保型研发合作合同
- 2025年度医疗设备安全认证与质量管理体系综合评估合同
- 高效智能论文生成软件项目定制合同书
- 2025年珍贵古董修复与精细刮灰工艺服务保障合同
- 5α-Dihydrodeoxycorticosterone-d7-生命科学试剂-MCE
- 实木家具基本知识培训课件
- 7s管理工作汇报
- 金融科技推动新质生产力发展
- 肝脓肿合并糖尿病业务查房
- 实验室安全教育考试题库实验室安全考试题库及答案
- 企业员工职业道德考核制度
- 公司安全事故隐患内部举报、报告奖励制度
- 【初中物理】质量与密度练习题 2024-2025学年初中物理人教版八年级上册
- 南外初中小语种课程设计
- 【上海市塑料探究所企业员工激励机制存在的问题及优化建议探析(论文)8200字】
- Unit2 Whats your hobby-教案人教精通版英语六年级上册
- 【必刷题】2024五年级英语上册一般过去时专项专题训练(含答案)
评论
0/150
提交评论