SAP 安全库存的设定.doc_第1页
SAP 安全库存的设定.doc_第2页
SAP 安全库存的设定.doc_第3页
SAP 安全库存的设定.doc_第4页
SAP 安全库存的设定.doc_第5页
已阅读5页,还剩2页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

SAP 安全库存的设定Safety stock 的意义1) 系统总是维持最小库存的水平安全库存只是一个笼统的说法,本文归纳了SAP四种安全库存(时间)的设置,用于增加计划过程中库存数量(时间)的弹性。为何安全库存能增加计划的弹性呢?因为在净需求计算(Net Requirements Calculation)中,Quantity available = Fixed receipts + Stock available for planning - Safety stock - requirements,若可用数量小于零,则报缺料,视为短缺数量(Shortage quantity)或需求数量(Net requriements),将用于批量计算并得出最终的获取建议。Safety stock Safety stock partially available Dynamic safety stock Safety time 一、Safety stock这就是“安全库存”了,安全库存的数量在计划中是不可用的。MRP中,若物料的数量低于安全库存水平,就会产生计划订单。安全库存在物料主数据MRP2视图设置。二、Safety stock partially available如果设置了安全库存,一低于该水平就会产生补货的请求,哪怕只是缺了一点,这增加了计划的工作量。为了弥补这个不足,我们可以在MRP Group中设置一个百分比,只有安全库存低于该百分比,补货请求方会产生。三、Dynamic safety stock动态安全库存就更加厉害了,它根据平均的日需求(Average daily requirements)数量,来确定未来几个时期的安全库存水平(数量等于若干个平均日需求):最小库存、目标库存、最大库存。若小于最小库存,产生补货请求至目标库存;若大于最大库存,系统将提示例外信息。若同时设置了安全库存,将累加。该配置称为Range of Coverage Profile,在MRP2视图分配,配置在IMG: Production - MRP - Planning - MRP Calculation - Define Range of Coverage Profile (Dynamic Safety Stock)。四、Safety time前面三种方案都是对安全库存数量上的设置,Safety time则是设置时间上的余量。物料的补货提议时间将提前于实际的需求时间,提前日期在MRP2视图中配置。考虑到物料可能用在产品的不同层次,为了避免重复提前,可以在MRP2视图的Safety time indicator栏位设置安全时间有效于所有需求还是仅相关需求,或者干脆无效。而考虑到不同时期对安全时间的长度要求不同,可以在后台定义Period Profile,IMG: Production - MRP - Planning - MRP Calculation - Define Period Profile for Safety Time/Actual Range of Coverage,并在MRP2视图分配给物料。注意: 百分比是根据MPR组设置的,在后台:Define Safety Stock Availability。Dynamic Safety stock:The dynamic safety stock is calculated in the planning run of the order proposal quantity. In the MRP evaluation, MD04 - you can check the parameters used to calculate the dynamic safety stock in the period totals display.To set the dynamic safety stock themaster data settingsrequired are,1. Maintain MRP view.2. In MRP 2 view enter the coverage profile which in configuration will carry the elements required as detailed below.3. Material_master- you have MRP type PD.It is maintained in SPRO under the node- SPRO -Production-Material Requirements PlanningPlanning-MRP CalculationDefine Range of Coverage Profile (Dynamic Safety Stock).It is maintained with respect to a plant as the calculation is plant specific.Calculation-Thedynamic safety stockis calculated using the following formula: average daily requirements_*range of coverageThe individual parameters are described below:Average daily requirementsThe calculation of the average daily requirements is carried out using the following formula: requirements in the specified periods/number of days in the total period lengthYou must maintain the following parameters for the calculation of the average daily requirements:1. Period indicatorYou use this indicator to determine the calendar period for which you want to carry out the average daily requirements.Here you can enter the following:weeks (W) months (M) periods according to the planned calendar (K) 2. Type of period length -You use this indicator to determine the length of the individual periods in detail.Here you can enter the following:workdays calendar days standard days- if you _selectstandard days as a period length, you must determine the number of days per period in the field, No. standard daysIf you set standard days as the period length, you must enter the number of days per period in the NO. standard days field. 3. Number of periodsHere, you define the number of periods you use to calculate the average daily requirements.Determining the range of coverageYou can determine the range of coverage for a maximum of three periods and you can maintain different coverage for each period.To do this, you must define the ranges of coverage and the periods in the screen section entitled, Determine range of coverage.You also have the option of limiting the range of coverage in each of the three periods by entering a minimum and a maximum range of coverage. The system checks whether the actual range of coverage ( available quantity / average daily requirements) lies below the minimum range of coverage or above the maximum range of coverage. If this is the case, the dynamic safety stock level is recalculated using the information for the target range of coverage.Example - 1Coverage profile - 001, with following settings assign in material_master - MRP2 view,Period type = MNo of period =2Type of length = 3 and days/period = 20.Range of coverage for first period (target) = 3, no of periods= 2Lets us say requirements areas below -12.11.2007 - 100019.11.2007 - 2000No of days = 2*20 = 40average Daily requirement = (1000+2000)/40 = 3000/40 = 750Safety stock requirement = 750*3(target) = 225.Run MRP, result is as below12.11.2007 - pl order qty- 1225 available qty - 122512.11.2007 - VSF 1000- available qty - 22519.11.2007 - pl order qty - 2000 balance - 222519.11.2007 - VSF 2000- available qty - 225.Example - 2Coverage profile - 002, withfollowing settings, assign in material_master - MRP2 viewPeriod = MNo of period = 1Type period= 1 i.e. working days as per factory calendar, please check your factory calendar. it is taking form no of days of factory calendar, remove the days which already passed, then remove holidays.Example - In factory calendar - 2,3,9,10,16,17,23,24,30 are holiday.i,e 9 days in 30 days are holidays,First, today is le us say 8th, hence from 30 days remove 7 days, ( as it is already passed), hence left with 23 days.Holidays applicable are, 9,10,16,17,23,24,30 i.e. 7 days i.e. from 23 days I need to remove 7 days hence the working days are only 16 days.range of coverage = target 7, no of period = 1.now my requirement is 3000 in that monthdaily average consumption is 3000/16 = 187.5safety stock = 187

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论