拉法基水泥集团--设备调试说明15.doc_第1页
拉法基水泥集团--设备调试说明15.doc_第2页
拉法基水泥集团--设备调试说明15.doc_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

e3fefbb8f4f999b5da23b0f350d150ee.pdf page: 3/3Test & CommissioningNo Load Test: Individual EquipmentCO2 ExtinguishingNo of pages/Equipment Item:Issue Date: 29th Oct. 2008 Rev: R00Item NSheet No.MPT-Single Machine Electrical Protection Interlock Test; MPT - 单机设备保护联锁测试The quantity must be checked physically by zoneThis test sheet must be up dated Caution!Lubrication And checking before starting润滑和启动前检查Lubrication润滑All elements or components are added right lubrication oil before starting. And the right label should be near the lubrication point.在启动前,所有的部件已经正确添加了润滑油。并且已润滑标签应当贴在润滑点附近。Security Check安全检查q No debris inside the storage room of CO2 tankCO2 贮存室内无杂物;q Enough fresh air in The storage room of CO2 tankCO2 贮存室内通风良好;Mechanical electrical check and adjustment机械电气检查和调整q Check the connection is correct, the wiring of electrical is correct检查所有管件连接是否满足要求,电缆接线是否正确q Close maintenance butterfly valve;Check the three-way changeover valve to be able to switch normally关闭维修喋阀;检查三通阀是否能正常工作q Adjust the upper limit and lower limit fingers of the electo connecting pressure gauge to see if the control cabinet is able to carry out acousto-optic alarm for high or low pressure or not. After that, adjust the fingers to stated position,调节电接点压力表的上、下限指针,检查现场控制箱是否能发出高低压力报警,否则调节其到相关值q Check the valves position is normal, actuate all the valves by hand to detect an eventual hard point检查所有阀门开度是否适合,手动转动阀门至最大开度.q Adjust upper limit and lower limit pieces of the pressure switch to see if the refrigerator is able to open and close automatically or not. 调节压力开关的上、下限,分别模拟系统处于高、低压状态,观察制冷机组是否能自动启闭q Interface of lcal control panel can work normally, the test to CCRhave be finished.现场控制箱已能正常工作,与CCR的信号界面已正常Key Point for Individual Test单机试车期间检查内容(1) I/O interface between CCR and local control panel, site should be testedCCR, 现场控制器和现场信号应测试完成q Temperature sensor and others sensors on hopper, bag filter and others will be tested 仓、收尘器等温度及其它传感该测试;q Load cell on tank of CO2 will be tested CO2 贮藏罐荷重传感器测试;(2) Manual control model will be done.现场手动控制模式测试(3) Automatical control model will be done现场手动控制模式测试(4) Following items should be checked during the individual test:单机试车期间,下列项目应当检查:q The actional area is correct,动作区域是否正确;q Alarm information is correct报警清单是否正确;Register of Individual Test单机试车记录Ambient temperature:环境温度:0CChecking items 检查内容Results 记录结果Unit0.5h1h2h3h4hChecking items and standard检查内容和质量标准TitleResult检查结果The automatical control model自动控制模式Automatical operating 能否自动控制Yes No Extinguishing area 灭火区域The action area of extinguishing is correct灭火区域是否正确Yes No Comments and Updating Punch ListsSolvedYes NoDateSignatureConclusion: Accept:Yes No Accept:Yes No

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论