




已阅读5页,还剩2页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Method Statement for Bored Pile Table of Contents1.0 General2.0 Setting out3.0 Drilling4.0 Piles Termination5.0 Clearing of Pile Base 6.0 Installation of Reinforcement7.0 Placing of Concrete8.0 Testing of Concrete9.0 Possible Problems Encountered10.0 Noise And Vibration11.0 Hazard Analysis12.0 Method of Locating And Avoidance of Utility Services13.0 Bored Pile Record Sheets1.0 GeneralThe general sequence for bored pile works is shown as below: -Figure 1: Flow Chart For Bored Pile Process2.0 Setting OutIn house surveyor will set out the pile location with reference to the control point established by the licensed surveyor. Prior to boring, the pile point shall be checked and offset along the 2 main axis for checking any deviation during initial boring.3.0 DrillingBefore boring, the supervisor/ project manager shall verify all associated technical information such as presence of services, pile co-ordinates, platform level, cut-off level, validity of drawings and etc.The pile boring operations will be performed by the flight auger or boring bucket attached to a hydraulic drilling unit which is mounted on a crawler crane. The verticality of bored hole will be checked from time to time from the top while advancing the bored hole. Sighting plumb line shall be used to check the verticality of the Kelly bar of boring machine against 2 major axis. The checking shall be carried out before and during boring process at regular interval to ensure boring hole is constructed and completed within tolerance.Bored HoleSteel RodBoring Machinemin. 1200mm HTStringKelly BarPlumb BobSighting Point45o Detail of Sighting Point_ Steel casing of adequate thickness shall be used to prevent unstable soil from caving into the bored hole for the first 612m of the soil strata. The casing will be installed by vibrating hammer or driven by the boring rig. Water shall be utilised as a medium stabalising fluid in the process of forming the borehole.During the boring process, the water level shall be kept as high as possible within the casing and well above the existing ground water level.Rock drilling tools or chisels shall be used to drill into rock. The clerk of work or engineer shall be verified the length of actual length of boring into rock.The bored length can be checked with measuring tape or length of kelly bar. Borehole stability shall be regularly checked by observing the bored depth and amount of soil removed.4.0 Piles TerminationBefore any permanent pile installation, preliminary load test shall be carried out to verify the design parameters used in design the pile length. Working load and integrity tests will also be carried out to ensure piles are properly installed.Pile termination criteria shall be defined according to the design, such as socket length into rock, minimum length in soil only and founding strata shall be identified and stipulated.Soil sample shall be collected at regular depth interval and compared with description in nearest soil investigation bored hole used in design of the pile. Inform resident engineer/COW if substantial difference observed.5.0 Clearing Of Pile Base After reaching the boring depth, the bottom of shaft shall be cleaned by mean of a mechanically operated cleaning bucket. 6.0 Installation of ReinforcementReinforcement steel cage will be supported centrally and firmly within the hole so that no movement occurs during concreting operation. Steel, concrete spacers will be used to provide interval support and ensured adequate concrete cover.Reinforcing cage will be suspended centrally on top of the casing where structural requirement of the reinforcing cage is less than the deep and bored shaft.If sonic logging test is required for the pile, the sonic logging tube shall be welded to the steel reinforcement and their end closed with mild steel cage. After test had been carried out, the sonic logging tubes shall be flushed clean by air lift method. Cement grout is then pumped through a poly-pipe into the tube after cleaning.7.0 Placing Of ConcreteConcrete is poured into the bored hole through tremie pipes. The tremie pipes are 270mm diameter and are made up of coupled sections 0.5m, 1m, 2m, and 3m in length. As the level of concrete in the bored hole rises, the tremie pipe column is raised whilst always ensuring a minimum 2m embedment into the concrete in order to avoid mud inclusions.During concreting, a log is kept of delivery time, volume and concrete level. Concrete cubes are taken to assess the concrete strength.When concreting in dry hole condition, a conical hopper fitted with short length of pipe at bottom is placed centrally over the head of the shaft.When the concrete is to be placed under water or drilling fluid, measures must be taken to ensure that:-a) The tremie pipe shall be water tight throughout its lengthb) High slump concrete (Tremie mix, slump = 175mm 25mm) will be used for the construction of the bored piles.c) The tremie pipe will be lowered centrally to the bottom of the borehole.d) The bottom of tremie pipe will be embedded at least 2 to 3m in the fresh concrete column. At all time, sufficient quantity of concrete shall be maintained within the tremie pipe to ensure the pressure formed exceeds that from the water or drilling fluid.e) Where sectional tremies are used, they should be split at the required intervals in order to avoid excessive embedment and thus insufficient flow of concrete into the bore.f) The diameter of tremie pipe shall not be less than 150mm and it shall have minimum external projections as to allow the pipes to pass through reinforcing cage without causing any damages, distortion or up-lifting of the steel cage. The internal face of the tremie pipe shall be free from any projection.g) The spoil from the bored piling work shall be removed from site to an approved dump site.In dry hole condition, the concrete level in the shaft shall be brought above the designed cut off level for 150mm. While in tremie condition, the concrete will be overcast minimum 500mm above the designed cut-off level.The platform level is checked to establish the depth of the cut-off level. The top of the concrete is constantly being monitored during the concreting process with a measuring tape to ensure the required concrete level is achieved. The pile head of completed piles will be protected from subsequent damage by mean of over casting the pile above cut-off level. The holes of completed bored piles will be back-filled with earth for safety consideration and this is also to protect the piles.8.0 Testing Of ConcreteFrequency of concrete testing shall be as follow: -a) Slump test- Every loadb) Cube strength - One set of test cubes (6 nos. of cubes) for every pile.Testing of cubes shall be performed for compressive strength at the following interval ages;2 cubes at age of 7 days2 cubes at age of 28 days2 cubes as standby cubes or at age of 56 days (if required)9.0 Possible Problems EncounteredDue to variable nature of soil, there may be some possible problems encountered. Some of the common problems are: -a) Present of obstructionFor shallow obstruction that is within the reach of a hydraulic excavator, it shall be dug out with the hydraulic excavator. Otherwise, assuming that the obstruction is a boulder, chiseling is normally adopted.b) Sudden loss of support fluidAs a precaution against the unlikely event of collapse water level is always maintained at 0.5m below casing. In the unlikely event of the sudden loss of support fluid, the boring will be immediately stopped and back-filled with clayey material or lean mix concrete until the loss of support fluid is stopped.After remedial measures have been undertaken, boring will resume.c) Verticality of excavationThe verticality is maintained by checking the Kelly bar against a plumb bob at two major directions. Should verticality be out of tolerance, the bored hole is back-filled and the verticality will be rechecked for re-boring.d) Defective pilesIf the completed piles is found (by sonic coring or other) not to be good quality over the design socket length, the remedial measures shall be: - The engineer shall assess whether the pile can be use after down grading. To install additional piles.This problem can be prevented or minimized if the following measure is carried out:- Always plan the supply of concrete is timely so that the bored hole is not left long after excavation. During concreting, concrete curve chart must be maintained to check any collapse of soil. Adjacent piles close to the newly completed bored piles are not installed until at least 24 hours later.10.0 Noise and VibrationUnlike driven pile system, bored pile system generally will not have any problem with noise and vibration. However, noise monitor will be carried out during operation to check the noise-generated compliance to the local authority requirement.11.0 Hazard AnalysisHAZARD PRECAUTIONSa) Injury from falling defectCrane operator not allowed to lift items directly over workers.All workers must wear safety helmet. Only bench men is allowed to stay near boring rig during boring operationb) Injury from falling into boreholeall open holes shall be covered if left unattended.c) Injury from concretingProper signal to crane operator and avoid standing at the direction of the concrete truck.d) Entanglement with moving plantStay out of danger zone of boring rig, crane and excavator.e) Snapping of the wire ropeCrane and Rig oper
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 端午节小学生班会课件
- 2025年玻璃浮球项目合作计划书
- 2025年自动化X光检查机项目发展计划
- 2025年垃圾焚烧发电合作协议书
- 客座教师聘用协议书范本
- 公摊面积占用协议书范本
- 签订技术协议书范本
- 心理健康课教案课件
- 2025年煤炭电气设备项目发展计划
- 二零二五年度煤炭深加工项目合作协议
- 【历史 广东卷】2025年广东省高考招生统一考试真题历史试卷(真题+答案)
- GB/T 10069.3-2024旋转电机噪声测定方法及限值第3部分:噪声限值
- 2024年度医患沟通课件
- 颅脑损伤护理观察
- 新疆阜康市面向社会公开招考56名社区工作者、到村工作大学生模拟预测(共500题)笔试参考题库+答案详解
- GA 1808-2022军工单位反恐怖防范要求
- 主蒸汽管道安装施工方案
- NY/T 584-2002西瓜(含无子西瓜)
- GB/T 24128-2009塑料防霉性能试验方法
- GB/T 20736-2006传动用精密滚子链条疲劳试验方法
- 净水器工作原理课件
评论
0/150
提交评论