新加坡金字塔公司项目管理模式英文版(4).doc_第1页
新加坡金字塔公司项目管理模式英文版(4).doc_第2页
新加坡金字塔公司项目管理模式英文版(4).doc_第3页
新加坡金字塔公司项目管理模式英文版(4).doc_第4页
新加坡金字塔公司项目管理模式英文版(4).doc_第5页
已阅读5页,还剩2页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

STANDARD OPERATING PROCEDURESSOP-ST-00STRUCTURAL WORKRef. No.ContentsSOP-ST-01Excavation and BackfillingSOP-ST-02Foundation WorkSOP-ST-03Timber FormworkSOP-ST-04Steel ReinforcementSOP-ST-05ConcretingSOP-ST-06Lifting of Precast Hollow Core SlabSOP-ST-07Lifting of Precast ColumnSOP-ST-08Grouting to Precast ItemsPARK HYATT SAIGON HOTEL PROJECTSTANDARD OPERATION PROCEDURE NO SOP ST 06 WORK TITLE :Lifting of precast follow core slab APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/5/98WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with specialist requirement FACILITIES /INSPECTION INSTRUMENT : Hoist beam & clambers are attached with shackle/sling ENVIRNMENT CONTROLS :NA NECESSARY RECORDS :Shop drawings FREQUENCY :Every inspection SPECIAL REQUIREMENTS : NASAFETY & HEALTH REQUIREMENTS :Check the safety working load for hoisting equipment WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.When delivery arrives inform the driver where to park the trailer 2. Slabs shall be off loaded using a lifting beam and clampers or a lifting beam and bells , Both systems are attached by shackle and sliding to the claim block of the crane 3.Check the condition of all lifting equipment 4.Place clampers at the correct position on the slabs5. Check that area for lifting is clear 6. Once the slab is lifted slightly, attach the safety chains around the component and latch on the other site of the clampersBy visual By visual By visual Measure by tape By visualBy visual Re-park again Re place by the correct size Re-place by the correct size Re-adjust Clear the area Re-do FFFFFFCCCCCPPPPPPFile : ST - 06 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ST 06 WORK TITLE :Lifting of precast follow core slab APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/5/98WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 7.Hoist the slab to the installation location and lower it slowly into the correct position.8.Once the slab is in position and seated safety, the safety chains are released , clampers are removed to pick up the next slab 9.Check that the position of the slab is correct10.If the slab is seated in the wrong location, adjust by using a crowbar By visual By visual By visual By visual Re-do Re-doRe-doRe-doAFFFFCCCCPPPPFile : ST - 06 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ST 07 WORK TITLE :Lifting of precast column APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/5/98WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with specialist requirement FACILITIES /INSPECTION INSTRUMENT : ENVIRNMENT CONTROLS :NANECESSARY RECORDS :Shop drawings FREQUENCY :Every inspection SPECIAL REQUIREMENTS : SAFETY & HEALTH REQUIREMENTS :Check the safety working load for hoisting equipment WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.When delivery arrives inform the driver where to park the trailer 2.Check the condition of all lifting equipment 3.Mrak a straight line at the center of two sides of the column, to check the alignment after installation.4.Check that area for lifting is clear 5.Lift the column from the trailer to a location close to the installation position.6.Insert the lifting pin through the column and lift from its resting position.By visualBy visual By theodolite & dumpy levelBy visual By visualBy visual Re- parkRe-pair Re-doClear the areaRe-doRe-doFFFFFFCCCCCCPPPPPPFile : ST - 07 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ST 07 WORK TITLE :Lifting of precast column APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/5/98WORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 7.The column is then hoisted slowly to upright position and raised above the right of the starter bars8.Lower the column down so that starter bars slot neatly into the correct ducts9.The column is then lowered to its seated position with the aid of slim plates to adjust the level ensure that the base of the column is seated on the slim plates and there are no obstructions.10. Props ate then secured and fastened both to the column and floor 11.Crane is released to pick the next column By visualBy visual Dumpy level By visual By visual Re- doRe-doRe-adjust Re-doRe-doFFFFFFCCCCCCPPPPPPFile : ST - 07 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP ST 08 WORK TITLE :Grouting to precast items APPROVED BY :Head, Control DeptCHECKED BY : PROJECT MANAGERREVISION : A EFFECTIVE DATA : 18/5/98WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIATo comply with specification REFERENCE STANDARDS/ CODES & QUALITY PLAN :To comply with specialist requirement FACILITIES /INSPECTION INSTRUMENT : Gout mixer/stirrer . pail , measurement jug ENVIRNMENT CONTROLS :NANECESSARY RECORNA FREQUENCY :Every inspection SPECIAL REQUIREMENTS : NASAFETY & HEALTH REQUIREMENTS :NAWORK PROCEDURECHECKING METHODREMEDIAL MEASURERESPOSIBILITYProject ManagerEngineerForemanAssistant ForemanTrade WorkerCheckerSubconOthers 1.Ensure firstly that the base of the column is cleat , free from dirt and debris 2.Check that the grouting sleeve is clear 3.The base of the column is then seated off and formed up by means of timber formwork4.Grout mixer /stirrer , pail, measuring jug to be made available 5.The grouting is then mixed by pouring the measured volume of water with a stirrer 6.After mixing is completed , pour/pump into the grouting h

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论