to clean and repair, it is strictly forbidden to head reaches into the mechanical stroke range. 17th article: in overhead transmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall not in overhead transmission line following work, through overhead transmission line should will lifting arm falls, in overhead line side work Shi, regardless of in any situation Xia, lifting arm, and rope or weights, and overhead transmission line of recently distance should not is less than Xia table provides: transmission line voltage 1000 v following 1-15 kV 20-40 kV 60-110 kV 220,000 v Allow minimum distances with the transmission line (m) vertical 1.5 level 1 1.5 2 3 4 5 6 4 6 18th: lamp voltage may not exceed 36 volts, when working in a damp place or metal containers, lamp voltage may not exceed 12 volts. 19th: pressure vessel should have a safety valve, pressure gauge, and avoid sun exposure, collisions, oxygen cylinders to prevent contaminated oil; of acetylene gas, LPG, must have a safety device to prevent tempering. 20th: x-ray and gamma-ray flaw detector operation area, non-operator, not allowed to enter. Article 21st: corrosion, dust and radioactive and toxic work, protective measures are required, and to carry out regular inspection. Spider-man 22nd section III: Spider-man to regular medical examinations of the medical diagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy and other discomfort in the Spider-man shall not engage in aerial work. 23rd: Spider-man dressed spirit, banned the wearing of hard bottom and easy slip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn into a tool bag, transfer prohibited throwing of objects. 25th: in case of bad weather (such as wind in the above grade) construction safety, prohibition of the open air, lifting and piling. 26th article: ladder shall not deficiency document, no padded using, ladder cross document spacing to 30 cm suitable, using Shi top to tied prison, bottom should take anti-sliding measures, single ladder and ground angle to 60 degrees suitable, ban II people while in ladder Shang job, as needed received long using, should lashing firm, people Word ladder in end of feet pulled prison, in channel at using ladder, due guardianship or set fence. 27th: no security measures, prohibited in hip joints, supports, trusses of the roof truss cantilever beams, and choose the frame and half fixed widget or job to walk on, Spider-man and the ground . Nine, ten basic security to prevent vehicle damage claim 1, without legal training of qualified certified personnel not familiar with vehicle performance is not driving a car. 2, should insist on doing defense work, vehicle brake, Horn, steering systems, lighting and other safety components such as poor are not allowed out of the car. 3, dump truck, dump truck car hop is strictly prohibited, prohibited goods mixing, loading of vehicles should not overload,stavebn tm vdce mst een. een by mlo zahrnovat analzu rizik, monost nehod charakteristik a nouzovch postup, nouzov zpracovn a obsah opaten. 4, integrovan pohotovostn plny, speciln havarijn plny a mst een by mly bt mezi sebou a s ostatnmi jednotky zapojeny v nouzi, kter jsou vzjemn propojeny. 5, havarijn pln by ml zahrnovat havarijn personl a organizace kontakt, nouzov rezervn seznam a dal informace. Informace by mly bt pravideln aktualizovny a zajist, e informace jsou pesn a platn. tyi, havarijn pln revize 1, Recenze pohotovostn plny pezkoumn formul a prvky pezkumu a opaten pijatch dvma zpsoby. Kdy host slou pedevm pro havarijn plny pro zznam v podob Recenze, prvek hodnocen pro nouzov hodnocen. . Kd pro porn ochranu konstrukce budov a nsk republice ny exploze nebezpen oblasti elektrick bezpenostnch pedpis a pedpis o porn ochranu design rafinaci ropy a chemickch podnik, napklad poadavky na pedpisech a nazench. 2. pi provdn instalace me zpsobit por, exploze, kter sti by mly bt pln nastaven peht, petlaku, micch pstroj, alarm (zvuk a svtla). 3. kde je holav plyn (pra) me unikat , holav plyn koncentrac detekce, alarm by mla bt nastavena. 4. vechny komunikoval s holav, vbun zazen s inertnm plynem, plynov penosov potrub, by mla bt nastavena zabrnit holavch a vbunch ltek do zazen, ale nemla bt samostatn zptn ventil. 5. holav plyn (pra) nastavit plamen svodi odvzduovac vvod, snadno pracovat, kde se zastavit ventily, aby pi vstupn vtrac potrub je v plamenech, peruil por plynu odvzduovac potrub ml bt nainstalovn v nejni hasicho zazen. 6. kdy dopravu holavch materil by mla odpovdat prmru potrub a stedn mrn odpor, sprvn zen prtoku, co nejvce se vyhnout statick elektiny. Antistatick opaten, jako jsou zazen, potrub, by mlo bt v souladu s technickmi pedpisy pro uzemnn design pro chemick podniky pslunch ustanoven. 7. nhl vbun petlaku nebo rychlho rozkladu vrobnch zazen nebo skladovacch zazen by mly bt vybaveny vbuchu (nevbun membrna), vvoz nonel trubice smrem k bezpenosti a aby prevence sekundrnch exploz, protiporn opaten. 8. vrobnthe principle of simplified EIA of construction projects in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, and settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct Government credit + business credit credit system, establishment of marketization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create policy lowlands, Highlands, integrity of service land, development land as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central eight rules and opposing the four winds and practicing three Suns, and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked swing, careful analysis and reflection. Will now check report is as follows: first, adherence to the partys political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the partys political disciplines. Conscientiously abide by the partys political discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the partys political discipline problems. 2, in the implementation of the central authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamline and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs further托口新镇至螺丝塘复建公路及渠水大桥工程合同编号:TK201107020渠水大桥墩身施工方案 中国水利水电第三工程局有限公司托口项目部 二一一年十月批准:审核:校核:编制:目录一、编制依据1二、编制原则1三、工程概况1四、施工准备2五、薄壁空心墩施工工艺3六、质量保证体系与措施6七、安全管理体系8八、文明施工和环保措施12to clean and repair, it is strictly forbidden to head reaches into the mechanical stroke range. 17th article: in overhead transmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall not in overhead transmission line following work, through overhead transmission line should will lifting arm falls, in overhead line side work Shi, regardless of in any situation Xia, lifting arm, and rope or weights, and overhead transmission line of recently distance should not is less than Xia table provides: transmission line voltage 1000 v following 1-15 kV 20-40 kV 60-110 kV 220,000 v Allow minimum distances with the transmission line (m) vertical 1.5 level 1 1.5 2 3 4 5 6 4 6 18th: lamp voltage may not exceed 36 volts, when working in a damp place or metal containers, lamp voltage may not exceed 12 volts. 19th: pressure vessel should have a safety valve, pressure gauge, and avoid sun exposure, collisions, oxygen cylinders to prevent contaminated oil; of acetylene gas, LPG, must have a safety device to prevent tempering. 20th: x-ray and gamma-ray flaw detector operation area, non-operator, not allowed to enter. Article 21st: corrosion, dust and radioactive and toxic work, protective measures are required, and to carry out regular inspection. Spider-man 22nd section III: Spider-man to regular medical examinations of the medical diagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy and other discomfort in the Spider-man shall not engage in aerial work. 23rd: Spider-man dressed spirit, banned the wearing of hard bottom and easy slip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn into a tool bag, transfer prohibited throwing of objects. 25th: in case of bad weather (such as wind in the above grade) construction safety, prohibition of the open air, lifting and piling. 26th article: ladder shall not deficiency document, no padded using, ladder cross document spacing to 30 cm suitable, using Shi top to tied prison, bottom should take anti-sliding measures, single ladder and ground angle to 60 degrees suitable, ban II people while in ladder Shang job, as needed received long using, should lashing firm, people Word ladder in end of feet pulled prison, in channel at using ladder, due guardianship or set fence. 27th: no security measures, prohibited in hip joints, supports, trusses of the roof truss cantilever beams, and choose the frame and half fixed widget or job to walk on, Spider-man and the ground . Nine, ten basic security to prevent vehicle damage claim 1, without legal training of qualified certified personnel not familiar with vehicle performance is not driving a car. 2, should insist on doing defense work, vehicle brake, Horn, steering systems, lighting and other safety components such as poor are not allowed out of the car. 3, dump truck, dump truck car hop is strictly prohibited, prohibited goods mixing, loading of vehicles should not overload,ch zazen, budov a konstrukc, tanky a jin zsuvky prmyslov vody, krom ustanoven vodu tak, by mlo bt instalovno v oblasti s vodou k utsnn vrtu, uzavrac ventil, aby se zabrnilo velk mnostv holavch a vbunch materil do kanalizace. 9. pouit v holavch, vbunch plyn pojistn ventil a vtrac potrub, je nutn export trubice je umstn mimo a vy ne 2 metry nad budovou. (B) pouvn ohn, ohe (viz systm sprvy prce) (c) porn zazen a organizac 1. realizace prevence prvn a integrovan prevence ohe politiku, pijmout modern technologie poru a vbuchu prevence a pomoci, provdn zen podle cl. 2. zzen veden spolenosti a vedouc jednotlivch oddlen Porn bezpenost vboru, workshop zaloena porn ochrany, vedouc skupiny a nastavit dobrovolnch hasi. 3. spolenost tvaru ochrany spotebitele na pln vazek hasii, hasii formulovat pln protiporn prevence a akn pln, provdn zen podle cl, pravideln proveden publicitu porn prevence a vzdlvn a kolen, v kombinaci s oekvan porn cvien. 4. soubor stacionrn ohn uvnit spolenosti zazen, protiporn zazen mus bt v Sprva slueb, rozvoj provozn postupy a systmy zen. 5. porn zazen na serveru nastavit jasn, pstup k pohodln a bezpen msto, pravideln kontroly drby, ti (to je, pevn, fixn typ a mnostv, podle odbornk), a nem nikdo nenapadal, pachatel dle systmu ke zpracovn. 6. vechny holav a vbun ltky ve spolenosti a potenciln ped porem a vbuchem nebezpen vroby, skladovn, prodej a pouvn procesu a jeho souvisejc vybaven, psn zen. 7. kdy je ohe, pole tby okamit uspodejte do boje s ohnm, a ohledn vroby, plnovn, alarmy a ohn a adresu urit sti ohn a pinastreamlining. Four are standard visits, except as required to participate in training, no other activity. Five is to improve news reporting, for propaganda work strictly according to the regulations. Six is strictly your presentation published strictly according to the regulations. Seven is strictly thrift, required the use of vehicles and office space and corporate hospitality. 3, change the style. Propaganda and ideological work of the new situation and new requirements of the new tasks, had done a lot of fruitful work, has made many achievements, but further closer to the grass roots, close to reality, close to the masses and also inadequate innovation must continue to improve. Second, the four winds some outstanding issues 1, oppose formalism. One theory is that he didnt, with less close contact. Theoretical study of consciousness is not high enough, system performance is not strong enough; more passive learning, active learning few generalities and learn more, delving into less. Especially based on rational thinking on major issues, applying theory to guide the work done is not good enough, not really understand and grasp the spirit and essence of the scientific Outlook on development, did not truly achieve mastery, to apply, to a certain extent, affect the development and implementation of ideas and initiatives. Second, work arrangements, and less supervision. Propaganda and ideological work is the objective, which needs to keep the continuity efforts deployed, but stressed in the work time, less supervision. For example, color weekends in the summer theatrical activities, city square performances, urging townships, communities and rural areas shows the implementation is inadequate, insufficient cultural an educational role to play. Third base enough, master grass-less real. Propaganda and ideological work in the new situation of characteristics and regularity of enough, deep enough for grass-roots public opinion Dynamics survey, for grass-roots typically drive less. For example, rural culture team active, . Im not actively take the initiative to take up, the lack of spirit of daring to, resulting in some job had a lot of power, but no tangible results. Third, innovation, lack of motivation. Emancipation did not end, innovation does not exist. In practical work, not your head, previous work experience, lack of innovation initiatives, study on the characteristics of propaganda and ideological work under the new situation through, grip on grassroots ideological trends and changes are not deep, to promote new initiatives and explore new methods of ideological and cultural work is not much, and some lack of relevance and timeliness. 4, discipline, lowering, and hard work are lacking. While working and enterprising spirit down. No real solution to treat yourself right, correctly treat past honors, their complacency, and work to see their scores more, less checking his own shortcomings, like to listen to the praise, satisfied face, online promotion, there are typical, and lack of high standards and strict requirements, the effect is real. Second hard drive less. On hard and渠水大桥墩身施工方案一、编制依据1、招投标文件及施工设计图等。2、公路桥梁施工技术规范。3、公路工程质量检验评定标准。4、筹建处、总监办、地方政府有关文件精神。5、合同总工期要求及我部施工组织总体部署。6、现场实地测量资料,结合现行的路桥施工技术规范和我公司以往同类工程的施工经验。7、有关现行的设计规范、技术规范、规程、标准及规定。8、我公司现行的ISO9002质量管理体系文件。二、编制原则1、贯彻合同要求及设计意图。2、施工方案体现科学适应,合理组织施工。3、确保施工安全,质量优良。4、积极推行新技术、新工艺,实行规范化、标准化作业,确保计划工期和质量目标的实现。5、以利用现有的资源,减少工程成本消耗为原则。三、工程概况渠水大桥1号6号桥墩墩身采用变截面薄壁空心墩,顺桥向厚0.5m,横桥向壁厚0.8m,墩顶设1.5高的实体段;其中1号、6号桥墩基础由四根D1.5m桩基组成,2号5号桥墩基础由四根D1.8m桩基组成,7号桥墩墩身采用等截面薄壁空心墩,顺桥向壁厚0.5m,横桥向壁厚0.8m,墩顶设1.5高的实体段;7号桥墩基础由2根D2.5m桩基组成。薄壁空心墩总计7个墩,最高的是49.58m(4#),最低是11m(7#)。全桥薄壁空心墩施工材料数量表序号名称数量备注1C35混凝土2586m32级钢筋438.005t四、施工准备1、仪器、机械设备数量表主要仪器配置表序号名称数量备注1徕卡全站仪TS06一台已标定2仪莱卡水准NA730一台已标定主要施工机械设备配置表序号设备名称规格型号单位数量1装载机厦工台12混凝土搅拌运输车台33变压器250KVA台14发电机120KW台15汽车吊QY25A台16挖掘机CAT320台27组合钢模板T208插入式振动棒个159钢筋切断机台210钢筋弯曲机台211直螺纹滚丝机台112电焊机1530KW台613拌和机Js750套114拌和机Js500套12、劳动力施技术人员配置计划。序号工种类别人数备注1管理人员92安全员23钢筋工154混凝土工155电工26装吊工27机械修理工28司机4合计53五、薄壁空心墩施工工艺1、施工前期工作:(1)承台施工前,应在混凝土垫层上准确放出薄壁墩的轮廓线,并用墨斗弹出薄壁墩预埋钢筋箍筋的轮廓线,方便预埋钢筋的准确定位。(2)绑扎薄壁墩钢筋,为保证承台钢筋骨架在薄壁墩钢筋的重力作用下不变形,在承台中布置46根B25的钢筋加以支撑,提高承台和薄壁墩钢筋骨架的刚度。(3)第一段钢筋骨架按9m预埋,顶部同一断面搭接接头不得超过主筋数量的50%(同一断面指35d长度范围内)。(4)薄壁墩预埋钢筋经检查合格后,浇注承台混

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论