印度BALCO扩建 4300 MW燃煤电站工程DCS系统受电及软件恢复调试方案 目 录Contents1. 编制目的 Compile Purpose2. 调试范围 Scope of commissioning3. 调试前必须具备的条件 Conditions of commissioning4. 调试步骤 Process of commissioning5. 使用工具 Tools used for test6. 注意事项 Precautions1. 编制目的 Compile Purpose为了指导及规范 DCS 带电调试工作,保证系统及设备能够安全正常投入运行, 制定本措施。The primary purpose of procedure is to guide and specify the commissioning work during energizing DCS, and make sure that the process can be put into service safely.2. 调试范围 Scope of commissioning2.1DCS 配电系统的测试。Test of DCS power distribution system.2.2DCS 接地系统检查。DCS grounding system testing2.3DCS 系统双重化功能处理机冗余试验。Redundant test of DCS processors changeover.2.4DCS 系统通讯网路的贯通。Connectivity of DCS network system.2.5DCS 系统带电拷机 2448 小时。2448 hours no-load operation of the energized DCS.2.6DCS 系统软件安装DCS program download and software update2.7本次DCS系统受电范围是所有挂接在印度BALCO发电厂 (4300MW)#1 机组及公用系统 DCS 控制系统上的节点,具体如下:This energizing range covers all the nodes on the DCS of PLTU INDIA BALCO EXPANSION PROJECT-1200MW (4300MW) and common system given below:DCS 工程师站 1 台 DCS Engineer Workstation: 1 unit DCS 历史站1 台DCS Historical Workstation: 1 unit 操作员站:4 台Operating Station: 4 units 公用系统操作员站:2台Common System Operating Station: 2 unitsDCS 机柜:17 套DCS Cabinet: 17 set DCS 电源柜:2 套DCS Power Cabinet:2 set网络机柜:2 套Switch Cabinet: 1 set MFT 柜:1 套MFT Cabinet: 1 set 打印机:3套Printer:3 units3. 调试前必须具备的条件 Conditions of commissioning3.1土建方面:机房门窗应安装完善,地面保持平坦通畅,如有井坑孔洞,应 敷设盖板或围栏。机房内应有充分的照明条件,并应配有适当的消防设施。空调 系统已安装完毕,并且具备投入条件。如正式空调系统无法投用,可考虑使用临 时空调以满足需要。Civil works:The doors and windows of control room should be installed completely. Control room should have flat floor, with holes and pits covered or enclosed, sufficient lighting, and adequate fire fighting facilities. Air-conditioning system should be installed, and available for operation. If formal air-conditioning system cannot be used, temporary air-conditioning can be put into service instead.3.2安装方面:DCS 系统机柜和盘台应安装就位,供电、配电系统接线完毕且稳定的工作电源能够送至 DCS 电源开关柜,预制电缆、接地系统已连接完毕。Equipment installation: DCS cabinets and panels should be installed in place. Wiring of power supply/distribution system, grounding system, and prefab cable should be completed. Reliable power can be transmit to the power supply cabinet for DCS.3.3DCS 系统受电的相关技术资料齐全,DCS 厂家到达现场确认受电条件。Technical document required for DCS energizing should be provided completely. The representative of the DCS manufacturer should be present at site to confirm the conditions of DCS energizing.4. 调试步骤 Process of commissioning4.1 受电前的检查。Inspect before energizing.4.1.1 DCS 系统机柜检查。DCS cabinets check.4.1.1.1 DCS 系统机柜内外应清洁卫生,无粉尘及杂物。DCS cabinets should be clean inside and outside, without dust or sundries.4.1.1.2 DCS 系统机柜前后以及 DCS 系统与其他系统机柜间应留有充分的工作空 间,以便调试和维护。Sufficient space for commissioning and maintenance should be left around DCS cabinets or between DCS cabinets and other system cabinets.4.1.1.3 DCS系统柜内配电装置、用电装置周围应留有足够散热空间,保持通风 流畅。In DCS cabinets, there should be sufficient space around the power distribution devices and other heat dissipative devices for discharging heat and keeping fluid ventilation.4.1.1.4 机柜应与底座支架用绝缘板隔离,并用带有绝缘套管和绝缘垫片的螺栓紧固联接。若设计为机柜接地,则无此要求。DCS cabinets must be separated from the pedestal by insulating board, and fastened bybolts with insulatingbushingandgasket. No such requirementfor directly-grounded cabinets.4.1.1.5 柜内冷却风扇应完整无损,电源配线应连接可靠。In DCS cabinets, cooling fan should be complete without any damage. Connection of power wire should be reliable.4.1.2 配电检查。Inspection of power distribution4.1.2.1 严格按照设计图纸和厂家规范要求进行电源检查测试,如设计图纸和厂 家规范有冲突,应以厂家规范要求为准。Check and test of the power supply in strict accordance with the design drawings and the specifications of manufacturers. It should be based on manufacturer specifications, in case, whichever is conflicted.4.1.2.2 检查所有电源系统配线:对于交流电源,应注意火线、零线的连接要正 确无误;对于直流电源配线,要保证正负极性的准确连接。Check the power wiring: live lines and neutral lines are connected correctly of the AC power system, and the polarity is consistent of the DC power system.4.1.3 卡件检查。Inspection of modules4.1.3.1 按照 DCS 系统厂家提供的系统安装图纸,检查确认机柜安装卡件的型号、 数量、安装位置及在卡件面板上标签是否正确。Check all of the modules mounted on the slot are in accordance with the installation drawings provided by the DCS manufacturers in type, quantity, installation location, and label of the modules.4.1.3.2 检查卡件是否插装牢靠,有关插头是否齐全。Check that all the modules are inserted in place firm, and plugs complete.4.1.3.3 检查卡件是否有明显霉变、损坏、不洁等现象。Check all the modules for mildew, damage, impurity.4.1.4 接地检查。Grounding inspection按照设计要求,检查计算机系统信号接地和机柜接地是否符合设计要求。Check that DCS signal grounding and cabinet grounding to comply with the design requirements.4.2 系统受电及软件恢复。DCS energizing and software download.4.2.1 系统受电。System energizing .4.2.1.1 受电顺序应从总电源开关,机柜电源开关,到模件和子模件逐级进行。 并且应逐机柜,逐系统进行,待一面机柜/系统受电测试完毕且恢复正常后,方 可给下一机柜/系统受电。Energizing should be carried out in sequence from DCS top power switch, cabinet power switch, to the module and sub-module. Cabinets or systems should be energized one by one, i.e., the next cabinet/system cannot be energized unless previous cabinet/system have been completed energizing and been recovered.4.2.1.2 受电前,由安装单位负责测试 UPS 至 DCS 电源柜电源线路的绝缘情况,包括线间绝缘和对地绝缘。Before energizing, erection contractor should check the insulation of the power cable from UPS to DCS power cabinet, including line-to-line insulation and earth insulation.4.2.1.3 由 UPS 系统送电至 DCS 电源柜,检查 UPS 电源电压是否正常。Energize from UPS system to DCS power cabinet, and check UPS voltage is normal.4.2.1.4 送电至控制机柜,检查机柜电源电压是否正常,如果电源电压不正常,查 找原因处理问题,保证电源正确。Energize control-cabinet, check the supply voltage of the cabinet. If the voltage is abnormal, find out the reasons and solve it, to ensure the correct power supply.4.2.1.5 闭合机柜电源开关,检查电源转换模件是否工作正常,检查电源模件的各等级输出电压是否正确。Close the cabinet power switch and check the power switchover module is working normally, and check power modules output voltage of each grade is correct.4.2.1.6 检查风扇是否能够工作。Check the fans is working normally.4.2.1.7 一面机柜/系统受电测试完毕且恢复正常后,安装单位应立即挂牌告知机 柜已带电。After one cabinet/system is energized, tested and recovered, the erection unit should hang a caution board indicating that this cabinet has been energized.4.2.1.8 受电过程中如发现异常情况,应立即停止受电工作。待分析查明原因,排除故障后再行恢复受电。In case of something abnormal occurs, stop energizing immediately.After the fault is eliminated, proceed with energizing.4.2.1.9 作好受电测试工作的记录,存查。Keep full record of data and results of each test for future reference.4.2.2 软件恢复。Software recovery.4.2.2.1 工程师站软件恢复。Recover software of engineer workstation.4.2.2.2 操作员站软件恢复。Recover software of operator work station.4.3 逐机柜,逐系统进行双重化电源切换试验、处理机切换试验。Cabinet-by-cabinet or system-by-system, changeover of dual power supply and dual processor test respectively.5. 使用工具 Tools used for test万用表: FLUKE 17BMultimeter: YOKOGAWA CA100信号发生器:: FLUKE 744Signal Source: YOKOGAWA CA1006. 注意事项 Precautions6.1 参加调试的所有工作人员应严格遵守现场有关安全规定,确保调试工作安全 可靠地进行。All personnel participating in commissioning should strictly comply with relevant site-safety-rules to ensure the work can be done safely and reliably.6.2 所有参加受电工作的人员应听从调试人员指挥,严禁违章操作及无令操作。All the participants by the energizi

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论