




已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
SHEN ZHEN XIAOCAINIAO ELETRONIC CO.,LTDADD: 1803/B, Seven Star Commercial Plaza,MeiLong Road,Longhua Distrist, Shenzhen citySPECIFICATION MODEL NO.: C.N-1818 REV:X1.0CUSTOMER: DESCRIPTION: Input:110240V AC 50/60Hz Output:12VDC2A OUR MODEL NO: SAMPLE NO: DATE: APPROVAL SIGNATUREAPPROVED BYCHECKED BYTESTED BY 1. SCOPEThe C.N-1818 is a 24 Watts single outputs, universal input switching power supply, 2. Mechanical requirements2.1 Power supply Dimension Constraints88(L)* 45(W)*35(H) mm Note: height include PCB and component lead3. Electrical requirements3.1 Input AC3.1.1 Input voltage MinimumNominalMaximum100110/220240Vac3.1.2 Input FrequencyMinimumNominalMaximum475063Hz3.1.3 Input CurrentThe input current is less than 0.6A 110Vac maxload 3.1.4 Inrush CurrentThe inrush current is 50A max 110Vac, cold start / 25 / max load. And first turn on.3.1.5 Earth Leakage CurrentThe earth leakage current is less than 0.25mA 230Vac.3.2 Output voltages and loads Table.1 Signal NameVoltage (Volts)Current (A)MinTypMaxMinMax+12V11.41212.602.03.2.1 The PIN designations and color defined as follows:3.2.2 Line RegulationThe line regulation is less than 1% 3.2.3 Load RegulationThe load regulation is less than 5% of typical voltage, output voltage show at Table 1 3.2.6 Start up Time : 2 sec max at 110Vac maxload.3.3 Ripple and Noise3.3.1 Ripple and Noise required specificationTable.2 is the Ripple and Noise limitations of switching power supply under all operating conditions including the input line voltage range and over all the full load range. Please refer to section 3.3.2 for measurement methods. All measurements are peak to peak. Table.2 Ripple and Noise LimitationsSignal NameRipple / Noise (mV)+12V 1203.3.2 Measurement methodThe measuring is done by 20MHz band width limited oscilloscope and terminated each output with a 10uF capacitor in parallel with a 0.1uF capacitor3.4 Protection3.4.1 Short Circuit Protectionshort condition on DC outputs shall cause no damage to the power supply. And remove the fault condition Auto-recovery. 3.4.3 Over Current ProtectionThe Over Current Protection is between 2.5A and 3.5A , auto recovery3.5 Efficiency75% min. It will be measured at the maximum load and including all the input line voltage range. 3.6 Hold up time 8mS(min) max load, 220Vac3.7 Rise time The rise time is less than15ms while output voltage from 10% to 90%.3.8 Overshoot/ UndershootOvershoot and Undershoot is less than 5%, at maxload and all the input line voltage range3.9 Transient responseThe output voltage is less than 8% , load change at 25%50%25% or 50%75%50% , at 0.1A/us,50Hz. 3.10 Mean Time Between Failure (MTBF)The power supply shall have a combined MTBF of at least 100,000 hours(at 25/maxload) The natural life is more than 5 years.4. Environmental requirements4.1.1 Operating Temperature Operating temperature -10 to +55 Operating humidity 5% to 95% (non condensing)4.1.2 Storage Temperature -40 to 70 4.1.3 Operating Altitude Operating Altitude is less than 4000 m. 5. INTERNATIONAL STANDARDS5.1.1 Safety standardsDesigned to meet the following standards:EN60950, UL60950,5.1.2 Isolation voltage3000VAC Input to Output; The leakage current is less than 30mA of 3s5.1.3 Isolation resistance10M Input to Output; ;Test condition:500Vdc.5.2 EMC standardsDesigned to meet the following conducted & radiation limits:5.2.1 ESD Susceptibility : EN61000-4-2 Perf criteria B 8KV and 6KV 5.2.2 Radiated: EN61000-4-3 10V/m Perf criteria A5.2.3 Conducted , EN61000-4-6 3V Perf Criteria A5.2.4 EFT/Burst Immunity Test : EN61000-4-4 Perf criteria B,1KV 5/50 Tr/Th nS 5KHz5.2.5 Surge Immunity Test :EN61000-4-5 Level 4 Perf 1KV/2KV criteri
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 国家能源哈尔滨市2025秋招面试专业追问及参考化学工程岗位
- 乌兰察布市中石化2025秋招笔试综合知识专练题库及答案
- 中国移动红河自治州2025秋招技能类专业追问清单及参考回答
- 中国广电太原市2025秋招笔试模拟题及答案
- 吕梁市中石油2025秋招面试半结构化模拟题及答案油田勘探开发岗
- 大唐电力佳木斯市2025秋招能源与动力工程专业面试追问及参考回答
- 国家能源阳江市2025秋招笔试数学运算题专练及答案
- 榆林市中石油2025秋招面试半结构化模拟题及答案机械与动力工程岗
- 中国广电衢州市2025秋招综合管理类专业追问清单及参考回答
- 中国广电无锡市2025秋招笔试性格测评专练及答案
- 监控设备迁移合同协议书
- 新学期-启航出发-2025-2026学年初一上学期新生开学第一课主题班会
- 压延机故障应急处理方案
- 2025年低碳节能减排知识竞赛题库(含答案)
- 业务员保密合同
- 四川省智慧交通科技
- 测绘无人机高程教程
- 动静脉栓塞的区别及护理
- DB64∕680-2025 建筑工程安全管理规程
- 2025-2030中国低因咖啡豆行业营销策略及销售规模预测报告
- 焊工证挂靠协议书
评论
0/150
提交评论