



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Aluminum metal alloy the frame and wall fixedly can use to inflate screw or shoot to nail(on the brick wall disallow to use to shoot to nail fixedly) and fix point JuBe no bigger than 500 mms.The aluminum matches a doors and windows frame the periphery fill to sew to be full, can not have crevice and fill material to request to choose according to the designUse.When the design didnt request, fill to anticipate general adoption asphalt glass cotton Zhan and mineral cotton and asphalt oil numb or other lightThe quality bears to decay material and fills to anticipate to stop up in response to the layering, the outward appearance stays a 5 mmsthe slot with 8 mms, fill Qian to seal completely gum.When fillWhen the anticipating strach(the blind side is bigger than applied thin stone concrete of 30 mm) for the cement sand, should strach with sand to get in touch with noodles to brush two degrees at the aluminum metal alloy frameThe asphalt paints.5.6House noodles engineeringThe this engineering house noodles waterproof layer adopts 2 to establish to defend and together seek an even layer for the cement sand syrup under of Gao Ju Wu, Tu Mo,s watertightness,Is another a to seek book material watertightness of Gao Ju Wu on even layer for the cement sand syrup, it starts construction the important point is as follows:5.6.1The book material of Gao Ju Wu starts construction the important point is as follows1.Book material product packing should note trademark, factory and quality check to print to record and produce exergue etc., the product all should hasFactory qualified certificate or experiment report list, promise that the product quality matches the rules of standard in the nation.2.Grass-roots processing:The applied cement sand syrup seeks even, and press design to request to seek a good slope, attain neat, solid,Sweep, have no cave convex form and sharpen grain, keep a Chinese foot check with the 2 ms, the biggest crevice should not over the 5 mms, the surface handlesThin hemp noodles.3.Tu Shua grass-roots processing:Spray basic with the air gun on basic the processing request degree of thickness even, disallow a dewThe bottom sees white, after spraying dry 12 hs, depend on temperature, degree of humidity.4.Tu Shua Jiao glue:Play line on basic first, eject to spread to stick sequence, then the bottom noodles in the grass-roots top and book material,The even coating grass-roots gum glues and request degree of thickness even, disallow to have dew bottom to pile up with the gel a phenomenon, but book material connects headThe 100 mms can not coat gum to glue.5.spreads to stick a material:Spreads to stick from the down slope beginning of flowing water slope, from the both sides Yan to ridge according to flick ofopen standard lineSpreads to stick, with the stream water connects Cha and finally seals ridge with a book material.6.re- curl up a material with the pasteboard tube while spreading, the center put a 30 mms and grew 1.5 m iron piping, 2 people distinguishKeep iron piping both ends once book material carry to fix in the start part, then press to play line to spread exhibition book material, spreads to stick a material not to get fold,Dont get lug to stretch a material as well, each time separate a 1 m to aim at line to glue to stick for a while, use to roll to brush to make an effort to roll to press 1 time with eject air, mostUsing again to press Gun(the big iron Gun outside wraps rubber) to roll to press to glue to stick behind is firm.7.waterproof layer through check qualified after, the square can carry on the construction of a work preface.5.6.2Gao Ju Wu, Tu Mo, waterproof layer the construction important point is as follows:The waterproof material quality purchased has to be dependable, and should draw samples to examine qualified rear to use first.WaterproofThe film strictly forbids in the rainy day to start construction, under construction meet rain should adopt to cover up a protection.Before Tu Mo starts construction, basic should meet a rules request,Its dry degree should meet the request of using the waterproof coating, the waterproof coating goes together with to anticipate amount of chronometer to have to be accurate and mixs blend to have to be full,It is even.The node seals completely the construction of processing, additional increment layer to satisfy a request, the foetus body strengthens the opportune moment of material paving,The position wants to take into to control;While building want to attain to be neat have no fold and dont raise a side, took to connect accurate.The foetus body strengthens a material topTu Shuas coating, should make the coating soak through a foetus body, the overlay is complete and start construction should strictly control waterproof Tu Mo Cengs thickness andTime of the partition, brushes even in response to the degree of thickness, the surface is neat.Chapter 6 starts construction quality control measure and target6.1Quality target and create an excellent plan6.1.1Quality targetIn order to ensure class in the province is good engineering, this engineering quality target works hard for Lu class prize.PressLu class prize while starting constructionThe standard requests to develop a quality management work.6.1.2Create an excellent plan1.The item engineering is qualified to lead 100%, good lead above 85%.2.Cent the department engineering Be qualified to lead 100%, good lead 80%.Foundation, corpus structure and house noodles engineering, decorateThe engineering, electricity installs, water Wei install etc. cent the department engineering promise good.3.The unit engineering is good.4.The impressions quality gets a goal to lead above 88%.5.The technique data is well-found.6.2The quality protects systemThe request that strictly presses the ISO9002 quality system carries on an operation.The quality protects system to know well to see attach table 8 quality control systemDiagram .6.3Quality control measure6.3.1Strengthen a technocracy work, hard carry through to carry out construction in the nation and acceptance norm and quality to assess standard.DoThe good diagram paper conducts trial jointly to hand over a bottom work with technique.Collections in time and the sorting engineering technique data attain data and start construction synchronously.6.3.2Strict performance quality workthree check system develops a QC group activity and hard work well each cent department itemThe check of the engineering checks and accepts and follows a check to the engineering quality execution and chase a quality problem as far as possible the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- Lesson 1 How are your study habits说课稿-2025-2026学年中职基础课-新模式英语(1)-劳保版-(英语)-52
- 2 运用发散思维说课稿-2025-2026学年高中思想政治人教版选修4科学思维常识-人教版
- 污水系统改造工程中的验收标准与质量检查流程
- 变压器及配电室建设项目技术方案
- 2025合作伙伴解除合同协议
- 2025劳务合同协议书
- 钢城社工考试题及答案大全
- 数字化建造技能培训与行业认证体系的构建
- 非遗项目考试题及答案
- 高校影视专业学生通过AI技术增强团队协作意识的机制
- GB/T 11021-2007电气绝缘耐热性分级
- 元数据教学讲解课件
- CCP与备货0403 (华为培训)课件
- ASCVD时代总体心血管风险评估工具的更新ppt参考课件
- 人工智能导论-课件-第2章知识图谱
- 华中8型数控系统设备连接与参数配置
- 防突管理制度汇编
- 江苏省教育科学规划课题开题报告
- 医疗器械GMP文件PUR-OP-001 Rev 01采购控制程序
- 精选商务礼仪情景模拟情景
- 男生青春期健康教育(我)
评论
0/150
提交评论